FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/39428/2019
(ii). Name of Project for which Forest Land is required :
Hurla Top Small Hydro Power Project
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Diversion of 4.016 hac of forest land for the construction of Hurla Top SHEP(3.50 MW) in Hurla Forest of Parvati Forest Division, Shamshi, Distt- Kullu, H.P.
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
2170
(viii). Area of forest land proposed for diversion(in ha.):
4.016
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
ASHAPURI HYDRO POWERS PRIVATE LIMITED
(ii). Address1 :
Village -Tharas, P.O.- Hurla, Tehsil- Bhuntar, Distt- Kullu, H.P.
(iii). Address2 :
NIL
(iv). State :
Himachal Pradesh
(v). District :
Kullu
(vi). Pin :
175125
(vii). Landmark :
Stone Crushar
(viii). Email address :
ashapurihydro@gmail.com
(ix). Landline Telephone No. :
1902-271471
(x). Fax No. :
1902-271471
(xi). Mobile No. :
9816600225
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Tehal
(ii). Middle Name:
Singh
(iii). Last Name:
Rana
(iv). Gender:
Male
(v). Designation:
Director
(vi). Address 1:
Village- Tharas,PO Hurla, Tehsil- Bhuntar, Distt- Kullu
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Kullu
(x). Tehsil:
Kullu(T)
(xi). Pin:
175125
(xii). Landmark:
Temple
(xiii). Email Address:
hurlatop@gmail.com
(xiv). Landline Telephone No.:
1902-271471
(xv). Fax No.:
1902271471
(xvi). Mobile No.:
8265044000
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Parbati
4.016
0
Total
4.016
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
4.016
0
Total
4.016
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Manihar(Fati Parli Kothi- Kotkandhi)
4.016
0
Total
4.016
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Weir Site
0.03
0
2
Muck Dumping-I
0.016
0
3
Sampark Marg
0.007
0
4
Muck Dumping-II
0.06
0
5
H.R.T.-I
0.065
0
6
Desilting Tank
0.042
0
7
Adit-I
0.02
0
8
Muck Dumping-III
0.06
0
9
H.R.T.-II
0.32
0
10
Adit-II
0.02
0
11
Muck Dumping-IV
0.051
0
12
Surg Shaft
0.04
0
13
Muck Dumping-V
0.051
0
14
Pen Stock
0.085
0
15
Power House / Switch Yard
0.13
0
16
Tale Race
0.004
0
17
Muck Dumping-VI
0.04
0
18
Approach Road to Power House
0.02
0
19
Transmission Line
2.955
0
Total
4.016
0
C.
Maps of forest land proposed to be diverted
Division 1. : Parbati
(i). Area of forest land proposed to be diverted(in ha.) :
4.016
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
4.016
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
15
(iii). Temporary Employment(Number of person-days):
109500
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Alternative alignment map
2
Certificate for minimum use of forest land
3
Undertaking for payment of cost of CA
4
Undertaking for payment of Net Present Value of forest area
5
Component wise detail
6
Distance from wildlife area
7
NOC from Fishiries
8
IA
9
Google Map
10
Joint Inspaction Report
11
Land Use Map
12
NOC Revinue
13
NOC IPh
14
NOC Panchyat
15
NOC Pwd
16
NOC Wildlife
17
Undertaking for Chief Wildlife Warden Comments
18
Village Benefited Certificate
19
Demand Letter
20
PDF File containing all the document of the proposal.
21
PDF file of All Documents of Hurla Top SHEP (3.50MW)
22
reply of observation on dated 17-07-2021
23
Approved Capacity of River
24
Map of Airal Distance
25
comments of GHNP
26
comments of SDM
27
comments of Wildlife
28
Digital Key Map of the Projects
29
Digital Map of the Projects
30
Google Map of the Projects
31
Toposheet Map of the Projects
32
Letter Received by DFO Parvati on Dated:- 04.05.2023
33
needful comments in regards of point no -4 have obtaion fro SDM Kullu
34
comments of SDMKullu
35
Needful has done and submitte to you for the further process.
36
Print