FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/39107/2019   (ii). Name of Project for which Forest Land is required : Construction of 1 MW HYDEL project in Dhanwan   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Micro Hydel Project at Dhanwan in Mandi District Himachal Pradesh which produce 1 MW power. This power can be used to Locally which will avoid long transmission looses and ensure unite   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 870   (viii). Area of forest land proposed for diversion(in ha.): 0.56   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : Baada Deo Small Hydel Project Pvt. Ltd   (ii). Address1 : 162/9 Bhojpur Bazar Sundernagar Distt. Mandi H.P.   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Mandi   (vi). Pin : 175018   (vii). Landmark : Mandi   (viii). Email address : bhupraj270@gmail.com   (ix). Landline Telephone No. : 190-7267350   (x). Fax No. : 190-   (xi). Mobile No. : 9418420270   (xii). Website (if any) : N/A   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Bhup   (ii). Middle Name: NIL   (iii). Last Name: Raj   (iv). Gender: Male   (v). Designation: Owner   (vi). Address 1: R/O village Shandra, P.O. Jhungi Teh. Nihri Distt. Mandi HP Pin Code- 175031   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Mandi   (x). Tehsil: Nihri(S.T)   (xi). Pin: 175031   (xii). Landmark: Mandi   (xiii). Email Address: bhupraj270@gmail.com   (xiv). Landline Telephone No.: 1907-265350   (xv). Fax No.: NIL   (xvi). Mobile No.: 9418420270   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.J/Nagar0.560
Total0.560
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mandi0.560
Total0.560
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Dhanwan0.54510
2Kalgehar0.01490
Total 0.56 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1TRENCH WEIR0.0040
2WATER CONDUCTOR SYSTEM0.2130
3PER STOCK0.0230
4FORE BAY0.0080
5POWER HOUSE SWITCH YARD0.020
6TRANSMISSION LINE0.260
7DUMPING SITE0.0320
Total 0.56 0
C. Maps of forest land proposed to be diverted
Division 1. : Mandi
  (i). Area of forest land proposed to be diverted(in ha.) : 0.56   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.56    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 18000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 1.00   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1IPH NOC
2Joint Inspection Report
3Justification Letter
4Village NOC
5TEC Undertaking
6HPPWD NOC
7I A Undertaking
8Additional NPV Undertaking
9NPV Undertaking
10CA Undertaking
11Alternative Alignment
12Minimum use of forest land
13project detail
14Consent letter
15NAC undertaking
16undertaking for the consent letter
17Muck Management Plan
18Village wise breakup and population benifited
19village wise breakup and population benefited
20Reclamation plan
21Detail of land
22Reply Nodal off observation
23Reply Nodal off observation 1
24Reply Observation raised by CCF Mandi
25muck plan dhanwan
26TEC Dhanwan
27wild life noc
28IA Dhanwan Hydro
29TC Dhanwan Hydro
30TC Dhanwan
31RO office REC meeting Observation Reply Dhanwan
32Layout Plan
33Noc WildLife
34Agreement for Change In Name of Prop. Bhup Raj to Shiv Ganga Hydel Power Project.
35Reply to Regional office Shimla
36Reply RO Observation
37Wildlife Distance Certificate from Wildlife Warden Shimla
38Complete IRO reply