FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/37189/2018   (ii). Name of Project for which Forest Land is required : Kasol Hydro Power Project   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : TO GENERATE EMPLOYMENT FOR LOCAL PEOPLE AND GENERATION OF ELECTRICITY TO MEET OUT NEEDS OF COUNTRY.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 534900   (viii). Area of forest land proposed for diversion(in ha.): 1.496448   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : MS BEENA BUTAIL PALMPUR   (ii). Address1 : BANDLA TEA ESTATE PALMPUR TEH PALMPUR DISTT KANGRA HP   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Kangra   (vi). Pin : 176061   (vii). Landmark : BANDLA TEA ESTATE   (viii). Email address : kasolhydroproject1971@gmail.com   (ix). Landline Telephone No. : 1902-223510   (x). Fax No. : 1902-   (xi). Mobile No. : 7018562123   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: jitender   (ii). Middle Name: NIL   (iii). Last Name: singh   (iv). Gender: Male   (v). Designation: consultant   (vi). Address 1: c/o global computr center near puri petrol pump gandhi nagar kullu hp   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: Kullu(T)   (xi). Pin: 175101   (xii). Landmark: NIL   (xiii). Email Address: kasolhydroproject1971@gmail.com   (xiv). Landline Telephone No.: 1902-223510   (xv). Fax No.: NIL   (xvi). Mobile No.: 7018562123   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Parbati1.4964480
Total1.4964480
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu1.4964480
Total1.4964480
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1kasol1.4964480
Total 1.496448 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1WEIR SIDE ROAD0.0188090
2MUCK DUMPING-10.0198210
3DIVERSION WEIR0.0177980
4WATER CHANNEL-10.008090
5DESILTING TANK0.046720
6MUCK DUMPING-20.0155730
7WATER CHANNEL-20.0097080
8MUCK DUMPING-30.0651250
9TUNNEL INLET0.0111240
10TUNNEL0.6107950
11ADIT0.0234610
12MUCK DUMPING-40.0778660
13FOREWAY TANK0.0177980
14MUCK DUMPING-50.0311470
15PENSTOCK0.1156870
16MUCK DUMPING-60.0042470
17MUCK DUMPING-70.0042470
18POWER/SWITCHYARD0.046720
19MUCK DUMPING-80.0594620
20WEIR ROAD0.0194160
21TAIL RACE0.0088990
22ROPEWAY STRUCTURE0.009910
23ROPEWAY-10.1407660
24STRUCTURE0.009910
25ROPEWAY-2 STRUCTURE0.009910
26ROPEWAY-20.0800910
27INTER CONNECTION POINT0.01330
Total 1.4964 0
C. Maps of forest land proposed to be diverted
Division 1. : Parbati
  (i). Area of forest land proposed to be diverted(in ha.) : 1.496448   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.1.496448    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 16   (iii). Temporary Employment(Number of person-days): 200
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 5.00   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1FOREST AREA FOR DIVERSION
2NON-FOREST AREA FOR DIVERSION
3Inescapability crtificate
4JUSTIFICATION FOR LOCATING THR PROJECT IN FOREST AREA
5CERTIFICATE FOR MINIMUM USE OF FOREST LAND
6ALTERNATIVE STUDY
7UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTSTION
8UNDERTAKING FOR PAYMENT OF NET PRESENT VALUE
9UNDERTAKING FOR PAYMENT OF ADDITIONAL NET PRESENT VALUE
10NON-AVAILABILITY OF LAND FOR COMPENSATORY
11ALLOTMENT LETTER
12JOINT INSPECTION
13NOC PWD
14NOC IPH
15NOC REVENEW
16NOC WILDLIFE
17UNDERTAKING FOR GEO-REFERENCE
18UNDERTAKING FOR NPV
19UNDERTAKING FOR NOT CHANGE THE ALIGNMENT
20UNDERTAKING FOR PROVIDE COOKING GAS AND KEROSENE
21UNDERTAKING FOR DAMAGES TREES ETC
22UNDERTAKING FOR EXTRA LAND DAMAGES ETC
23UNDERTAKING FOR LABOUR CAMP
24UNDERTAKING FOR NOC FISHERIES
25UNDERTAKING FOR FRA CERTIFICATE
26UNDERTAKING FOR PANCHYAT NOC
27COMPONENT WISE BREAKUP
28UNDERTAKING FOR INTERCONNECTION POINT
29UNDERTAKING FOR DISTANCE CERTIFICATE FROM ECO SENSITIVE ZONE
30village breakup with code
31inter connection point
32Techno Economic Clearance
33Detail of HEPs over stream and distance from ESZs and PAs
34Reply to REC observations
35River Beas Basin Study Data
36WLMP and SMCP undertaking
37Undertaking Implementation Agreement
38Undertaking regarding comments of CWLW
39Approved capacity and detail of proposals over the stream/nallah
40EDS dated 12.10.2023 reply
41HIMURJA letter on Implementation Agreement
42EDS 09.11.2023 Reply
43EDS dated 27.01.2024 reply
44Comments of CWLW