(i). Proposal No. :
FP/HP/HYD/36856/2018
(ii). Name of Project for which Forest Land is required :
Grahan Kasol Hydro Power
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Land required to generate the electricity to fulfill needs of nation and generate employment for the local people near by the Project
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
423800
(viii). Area of forest land proposed for diversion(in ha.):
1.6201
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
M/S DINESH BUTAIL
(ii). Address1 :
Butail complex bundla Tea Estate palampur Distt Kangra HP
(iii). Address2 :
NIL
(iv). State :
Himachal Pradesh
(v). District :
Kangra
(vi). Pin :
176061
(vii). Landmark :
NIL
(viii). Email address :
grahakasolhydroproject@gmail.com
(ix). Landline Telephone No. :
1902-223510
(x). Fax No. :
1902-
(xi). Mobile No. :
9816888100
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
jitender
(ii). Middle Name:
NIL
(iii). Last Name:
singh
(iv). Gender:
Male
(v). Designation:
dricector
(vi). Address 1:
vpo jibhi,teh banjar district kullu HP
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Kullu
(x). Tehsil:
Banjar(T)
(xi). Pin:
175123
(xii). Landmark:
NIL
(xiii). Email Address:
thakurjitender445@gmail.com
(xiv). Landline Telephone No.:
1902-223510
(xv). Fax No.:
NIL
(xvi). Mobile No.:
7018562123
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Parbati
1.6201
0
Total
1.6201
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
1.6201
0
Total
1.6201
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Grahan
1.6201
0
Total
1.6201
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
diversion weir
0.0198667
0
2
Water Channel-1
0.01618
0
3
Muck Dumping-1
0.011326
0
4
Desilting Tank
0.029124
0
5
Muck Dumping-2
0.01618
0
6
Water Channel-2
0.039641
0
7
Tunnel Inlet
0.007079
0
8
Muck Dumping-3
0.079282
0
9
Tunnel
0.542232
0
10
Adit
0.023461
0
11
Muck Dumping-4
0.079282
0
12
Forebay Tank
0.013349
0
13
Muck Dumping-5
0.059462
0
14
Penstock
0.12135
0
15
Muck Dumping-6
0.005663
0
16
Muck Dumping-7
0.002427
0
17
Power house /Switchyard
0.04672
0
18
Tail Race
0.006068
0
19
Muck Dumping-8
0.04672
0
20
Link road Tunnel Inlet to Adit
0.298521
0
21
Road Muck Dumping-1
0.077866
0
22
Road muck dumping-2
0.0783
0
Total
1.6200997
0
C.
Maps of forest land proposed to be diverted
Division 1. : Parbati
(i). Area of forest land proposed to be diverted(in ha.) :
1.6201
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
1.6201
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
16
(iii). Temporary Employment(Number of person-days):
200
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Others
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
5.00
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
ALTERNATIVE STUDY
2
AUTHROSIATION
3
NON FOREST AREA
4
Inescapebility Sertificate
5
justification
6
minimum use of forest land
7
Undertaking for payment of Net Present value of forest area
8
Undertaking for payment of Additional Net Present value of forest area if any
9
Component wise breakup of the total Land
10
allotment letter
11
Joint Inspection
12
NOC IPH
13
NOC Wild life
14
NOC Revnew
15
Undertaking Geo-referenced Boundary
16
Undertaking Net present Value
17
Undertaking the proposed alignment
18
Undertaking to provide fuel wood etc
19
Undertaking Damage during the construction
20
undertaking to Extra land diversion
21
undertaking to provide Labour Camp etc
22
Reclamation Plan
23
Undertaking for NOC Fisheries
24
Undertaking for NOC Gram Panchyat
25
UNDERTAKING FOR PAYMENT OF COST OF C A
26
UNDERTAKING FOR DIFFERENCE OF MEASUREMENT OF LAND
27
UNDERTAKING FOR DISTANCE CERTIFICATE OF ECO SENSITIVE ZONE
28
UNDERTAKING FOR INTERCONNECTION POINT WITHOUT USING CORRIDOR
29
Singed acknowledgement slip is attached.
30
detail of village code and population
31
Undertaking and Transmission Approval of Grahan Kasol Hydro and Kasol hydro projects in joint mode
32
reply of interconnection point
33
proceeding of FRA
34
Techno Economic Clearance
35
Detail of HEPs over stream and distance of ESZs and PAs
36
Reply to REC observations
37
River Beas Basin Study Data
38
WLMP and SMCP undertaking
39
Undertaking Implementation Agreement
40
Undertaking regarding comments of CWLW
41
Approved capacity and detail of proposals over the stream/nallah
42
EDS dated 12.10.2023 reply
43
HIMURJA letter on Implementation Agreement
44
EDS dated 09.11.2023 reply
45
EDS dated 27.01.2024 reply
46
Comments of CWLW
47
Layout Plan
48
Muck Management Plan a/w X-Section Detail and Reclamation Plan
49
EDS dated 04.12.2024 reply
Print