FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/36856/2018   (ii). Name of Project for which Forest Land is required : Grahan Kasol Hydro Power   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Land required to generate the electricity to fulfill needs of nation and generate employment for the local people near by the Project   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 423800   (viii). Area of forest land proposed for diversion(in ha.): 1.6201   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : M/S DINESH BUTAIL   (ii). Address1 : Butail complex bundla Tea Estate palampur Distt Kangra HP   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Kangra   (vi). Pin : 176061   (vii). Landmark : NIL   (viii). Email address : grahakasolhydroproject@gmail.com   (ix). Landline Telephone No. : 1902-223510   (x). Fax No. : 1902-   (xi). Mobile No. : 9816888100   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: jitender   (ii). Middle Name: NIL   (iii). Last Name: singh   (iv). Gender: Male   (v). Designation: dricector   (vi). Address 1: vpo jibhi,teh banjar district kullu HP   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: Banjar(T)   (xi). Pin: 175123   (xii). Landmark: NIL   (xiii). Email Address: thakurjitender445@gmail.com   (xiv). Landline Telephone No.: 1902-223510   (xv). Fax No.: NIL   (xvi). Mobile No.: 7018562123   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Parbati1.62010
Total1.62010
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu1.62010
Total1.62010
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Grahan1.62010
Total 1.6201 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1diversion weir0.01986670
2Water Channel-10.016180
3Muck Dumping-10.0113260
4Desilting Tank0.0291240
5Muck Dumping-20.016180
6Water Channel-20.0396410
7Tunnel Inlet0.0070790
8Muck Dumping-30.0792820
9Tunnel0.5422320
10Adit0.0234610
11Muck Dumping-40.0792820
12Forebay Tank0.0133490
13Muck Dumping-50.0594620
14Penstock0.121350
15Muck Dumping-60.0056630
16Muck Dumping-70.0024270
17Power house /Switchyard0.046720
18Tail Race0.0060680
19Muck Dumping-80.046720
20Link road Tunnel Inlet to Adit0.2985210
21Road Muck Dumping-10.0778660
22Road muck dumping-20.07830
Total 1.6200997 0
C. Maps of forest land proposed to be diverted
Division 1. : Parbati
  (i). Area of forest land proposed to be diverted(in ha.) : 1.6201   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.1.6201    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 16   (iii). Temporary Employment(Number of person-days): 200
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 5.00   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1ALTERNATIVE STUDY
2AUTHROSIATION
3NON FOREST AREA
4Inescapebility Sertificate
5justification
6minimum use of forest land
7Undertaking for payment of Net Present value of forest area
8Undertaking for payment of Additional Net Present value of forest area if any
9Component wise breakup of the total Land
10allotment letter
11Joint Inspection
12NOC IPH
13NOC Wild life
14NOC Revnew
15Undertaking Geo-referenced Boundary
16Undertaking Net present Value
17Undertaking the proposed alignment
18Undertaking to provide fuel wood etc
19Undertaking Damage during the construction
20undertaking to Extra land diversion
21undertaking to provide Labour Camp etc
22Reclamation Plan
23Undertaking for NOC Fisheries
24Undertaking for NOC Gram Panchyat
25UNDERTAKING FOR PAYMENT OF COST OF C A
26UNDERTAKING FOR DIFFERENCE OF MEASUREMENT OF LAND
27UNDERTAKING FOR DISTANCE CERTIFICATE OF ECO SENSITIVE ZONE
28UNDERTAKING FOR INTERCONNECTION POINT WITHOUT USING CORRIDOR
29Singed acknowledgement slip is attached.
30detail of village code and population
31Undertaking and Transmission Approval of Grahan Kasol Hydro and Kasol hydro projects in joint mode
32reply of interconnection point
33proceeding of FRA
34Techno Economic Clearance
35Detail of HEPs over stream and distance of ESZs and PAs
36Reply to REC observations
37River Beas Basin Study Data
38WLMP and SMCP undertaking
39Undertaking Implementation Agreement
40Undertaking regarding comments of CWLW
41Approved capacity and detail of proposals over the stream/nallah
42EDS dated 12.10.2023 reply
43HIMURJA letter on Implementation Agreement
44EDS dated 09.11.2023 reply
45EDS dated 27.01.2024 reply
46Comments of CWLW
47Layout Plan
48Muck Management Plan a/w X-Section Detail and Reclamation Plan
49EDS dated 04.12.2024 reply