FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/34393/2018   (ii). Name of Project for which Forest Land is required : C/o Baada Deo Small Hydro Project (1.5 MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : There is proposal for the construction of Baada Deo Small Hydro Project (1.5 MW) is located between Elevation 1210 mtr. to Elevation 1110 mtr. on the left bank of Kandhi/Jhungi stream at Teh. Sundernagar, Distt. Mandi H.P.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1312   (viii). Area of forest land proposed for diversion(in ha.): 0.9991   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : Baada Deo Small Hydel Project Pvt. Ltd   (ii). Address1 : 162/9 Bhojpur Bazar Sundernagar Distt. Mandi H.P.   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Mandi   (vi). Pin : 175018   (vii). Landmark : Mandi   (viii). Email address : bhupraj270@gmail.com   (ix). Landline Telephone No. : 190-7267350   (x). Fax No. : 190-   (xi). Mobile No. : 9418420270   (xii). Website (if any) : N/A   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Bhup   (ii). Middle Name: NIL   (iii). Last Name: Raj   (iv). Gender: Male   (v). Designation: Owner   (vi). Address 1: R/O village Shandra, P.O. Jhungi Teh. Nihri Distt. Mandi HP Pin Code- 175031   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Mandi   (x). Tehsil: Nihri(S.T)   (xi). Pin: 175031   (xii). Landmark: Mandi   (xiii). Email Address: bhupraj270@gmail.com   (xiv). Landline Telephone No.: 1907-265350   (xv). Fax No.: NIL   (xvi). Mobile No.: 9418420270   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Suket0.99910
Total0.99910
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mandi0.99910
Total0.99910
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Kathodhar0.90810
2Gaali0.0910
Total 0.9991 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Diversion Weir0.01820
2D/Tank0.01980
3WCS0.21950
4Penstock0.01620
5Forebay0.01820
6Power House0.03040
7Switchyard0.02020
8Dumping Area0.03840
9Transmission line0.61820
Total 0.9991 0
C. Maps of forest land proposed to be diverted
Division 1. : Suket
  (i). Area of forest land proposed to be diverted(in ha.) : 0.9991   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0.9991    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 27000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 1.5   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1Joint Inspection Report
2NOC PWD
3NOC iph
4Check list serial no. 8 Non Availability of Non Forest Land DC certificate
5Check list serial no. 20 Non Availability of Non Forest Land for Compensatory Afforestation
6MOU/Consent letter
7Check list 10 certificate regarding minimum use of forest land
8Check list 11 undertaking regarding payment of CA
9Check list 12 undertaking regarding payment of NPV
10Check list 12 A undertaking regarding payment of Additional Amount of NPV
11detail of boundary in km from Wildlife
12Interconnection guidelines
13Reclamation plan
14Form A Part 1
15Undertaking TEC
16water conductor system is open pipe line mild steel
17observation 7:- APROACH ROAD POER HOUSE HPPWD ROAD IS ADJOINING PH
18observ. 4 LAND DETAIL TRANSMISSION LINE
19Forest Land For Transmission Line
20Undertaking regarding providing TEC
21EDS RO point wise Reply letter
22EDS RO point wise Reply No. 1
23EDS RO point wise Reply No. 3
24EDS Regional Office Reply Description Transmission Line