FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/26220/2017   (ii). Name of Project for which Forest Land is required : Tranh-Charoli SHP -2 MW   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Tranh-Charoli SHP -2 MW kupvi, tehsil kupvi Distt shimla diversion of 02.8573 hect. is essential for the project.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 1898   (viii). Area of forest land proposed for diversion(in ha.): 2.8573   (ix). Non-forest land required for this project(in ha.): 1.4121   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : HYDRO MORE POWER PVT. LTD.   (ii). Address1 : T.R.V. Building, Sector -II, New Shimla H.P.   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Shimla   (vi). Pin : 171009   (vii). Landmark : NIL   (viii). Email address : ankaushal888@gmail.com   (ix). Landline Telephone No. : 177-2672888   (x). Fax No. : 177-   (xi). Mobile No. : 9459657388   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Amar   (ii). Middle Name: Nath   (iii). Last Name: Kaushal   (iv). Gender: Male   (v). Designation: Director   (vi). Address 1: T.R.V. Building, Sector-II, New Shimla H.P.   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Shimla   (x). Tehsil: Shimla   (xi). Pin: 171009   (xii). Landmark: NIL   (xiii). Email Address: ankaushal888@gmail.com   (xiv). Landline Telephone No.: 177-2672888   (xv). Fax No.: NIL   (xvi). Mobile No.: 9816414248   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Chopal2.85731.4121
Total2.85731.4121
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Shimla2.85731.4121
Total2.85731.4121
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1BANAH0.1290
2CHAROLLI1.5290.5362
3DIMMI0.15710.118
4HIDAH0.55490.6322
5TRANH0.48730.1257
Total 2.8573 1.4121
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Dumping Site0.65860
2Intake/Diversion wire0.0720
3Water Conductor/ Desalting Chamber00.0702
4Water Conductor0.42280.0555
5Power House00.135
6DT/Feeder Channel0.06450
7Forebay/Spill Bay0.0750
8Pen-stock0.13740.0316
9Transmission1.4271.1198
Total 2.8573 1.4121
C. Maps of forest land proposed to be diverted
Division 1. : Chopal
  (i). Area of forest land proposed to be diverted(in ha.) : 2.8573   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.8573    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 0   (iii). Temporary Employment(Number of person-days): 27000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 2   (ii). Total command area of the Project(in ha.): 2.8573
Additional information Details
Documents
S.No Documents
Remarks
1Joint Inspection Report
2MOU
3GRAM Panchayat
4Undertaking for Area
5Check List 10
6Check List 11
7Check List 12
8Check List 12A
9PWD NOC
10NOC Wild life
11NOC IPH
12component wise breakup
13Line Plan
14Justification for Population certificate
15Undertaking to Provide IA Certificate
16Reply letter
17Muck Management Plan
18NAC
19CombinedPDF1
20CombinedPDF2
21Reply Letter 15.07.2023
22Reclamation Plan
23Detail of HEPs on Yamuna Basin
24Power MAP of HP
25TEC Tranh Charoli HEP
26Reply Letter 23.01.2024
27Consent of HPSEB for Power Evacuation 10.05.2024
28Reply Letter 13.07.2024
29Distance MAP for ESZ & PAs
30Reply Letter 28.08.2024
31Digital Distance Map ESZ and PAs
32Yamuna Basin Hydro Potential Detail
33Detail Project Report
34Revised reply 03.12.2024
35DPR
36Reply 18.02.2025
37Hydrology Tranh Charoli
38Reply 03.06.2025
39Length and Width with Voltage capacity of Transmission Line