A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/25572/2017   (ii). Name of Project for which Forest Land is required : Thaltukhod Stage-I   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Thaltukhod Stage-I is 5.0 MW run of river small hydro electric project located in Teh. Padhar on Thaltukhod Nallah, Tributary of UHL River.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 4927   (viii). Area of forest land proposed for diversion(in ha.): 4.9069   (ix). Non-forest land required for this project(in ha.): 0.6638   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : CLIFF FINVEST PRIVATE LIMITED   (ii). Address1 : I-41, DLF Industrial Area, Phase-I, Faridabad, Haryana- 121003   (iii). Address2 : NIL   (iv). State : Haryana   (v). District : Faridabad   (vi). Pin : 121003   (vii). Landmark : DLF Industrial Area   (viii). Email address : cliffhydro107@gmail.com   (ix). Landline Telephone No. : 129-4113168   (x). Fax No. : 129-2270212   (xi). Mobile No. : 9816008539   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Naresh   (ii). Middle Name: NIL   (iii). Last Name: Thakur   (iv). Gender: Male   (v). Designation: Manager   (vi). Address 1: I-41, DLF Industrial Area, Phase-I, Faridabad, Haryana-121003   (vii). Address 2: NIL   (viii). State: Haryana   (ix). District: Faridabad   (x). Tehsil: Faridabad   (xi). Pin: 121003   (xii). Landmark: DLF Industrial Area   (xiii). Email Address: cliffhydro107@gmail.com   (xiv). Landline Telephone No.: 129-4113168   (xv). Fax No.: 01292270212   (xvi). Mobile No.: 9816008539   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.J/Nagar4.90690.6638
Total4.90690.6638
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mandi4.90690.6638
Total4.90690.6638
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Gramang/4501.11520.5221
2Khariyan/4572.26830.1345
3Dhamchayan/4261.450.0072
4Cheling/4250.07340
Total 4.9069 0.6638
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Trench Weir0.15650.2671
2Desliting Tank0.07340
3Pipe line from weir site to desilting tank and fro0.06270.255
4Muck dumping site0.61220
5Tunnel and adiit tunnel0.78180
6Approch road to power house00.0154
7Transmission line2.33840.0162
8Forebay0.33430
9Penstock and spilway0.16350.0501
10Power house0.38410.06
Total 4.9069 0.6638
C. Maps of forest land proposed to be diverted
Division 1. : J/Nagar
  (i). Area of forest land proposed to be diverted(in ha.) : 4.9069   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.4.9069    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 32   (iii). Temporary Employment(Number of person-days): 82000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1Detail Note of the project
2General Layout Plan
3Statement showing detail of forest area proposed for diversion.
4Statement showing detail of non-forest area involved in the proposal.
5Letter of Joint Secretary Forest regarding TEC
6undertaking for additional NPV According to Honorable high court.
7undertaking for CA Cost.
8consent latter from Himurja .
9silent feature
10certificate for non availability of non forest area for CA f
11certificate for non availability of non forest area for the contractions for the project
12NOC From gram Panchayat
13NOC From Fisheries Department.
14NOC From I&PH Department.
15NOC From HPPWD Department.
16NOC From wild life Department.
17ECO sensitive Certificate from forest Department of concern Division.
18latter from DOE for TEC
19Joint inspection report.
20Population of affected village.
21TEC of The Project.
22Reply latter to DFO J/Nager.
23observation reply letter dated 10-03-2021
24pdf forest file of Thaltukhod stage -I project
25DFO observation reply letter dated 08-07-2021
26Component of project
27transmission line detail of the project
28commpoonent wise detail of the project thaltu loth -1
29Reply latter for DFO 14/09/2021
30Undertaking for I/A.
31Dimension of Dumping of site.
32Coordinates of Dumping of site.
33reply on march month
34Latter to DFO.
35topo sheet.
36component wise khasra no detail.
37Muck management Plan.
38lyout plane.
39to sheet
40muck manajement.
41GEO refrance map
42component wise area dimension.
43complete file of objection.
44reply later on 22/03/23
45reply of objection 07/04/2023
46complete file.
47evacuation plan.
48detail of project in River basin Study
49Reply latter of the objection
50Complete list/detail of approvrd/existing/proposed project in the Nallaha/River/tributary.
51reply latter of the objection.
52Reply latter of the project.
53Revised reclamation plan.
54Reply latter of 21/09/2024.
55reply latter on 13/12/20924