FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/25572/2017
(ii). Name of Project for which Forest Land is required :
Thaltukhod Stage-I
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Thaltukhod Stage-I is 5.0 MW run of river small hydro electric project located in Teh. Padhar on Thaltukhod Nallah, Tributary of UHL River.
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Non Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
4927
(viii). Area of forest land proposed for diversion(in ha.):
4.9069
(ix). Non-forest land required for this project(in ha.):
0.6638
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
CLIFF FINVEST PRIVATE LIMITED
(ii). Address1 :
I-41, DLF Industrial Area, Phase-I, Faridabad, Haryana- 121003
(iii). Address2 :
NIL
(iv). State :
Haryana
(v). District :
Faridabad
(vi). Pin :
121003
(vii). Landmark :
DLF Industrial Area
(viii). Email address :
cliffhydro107@gmail.com
(ix). Landline Telephone No. :
129-4113168
(x). Fax No. :
129-2270212
(xi). Mobile No. :
9816008539
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Naresh
(ii). Middle Name:
NIL
(iii). Last Name:
Thakur
(iv). Gender:
Male
(v). Designation:
Manager
(vi). Address 1:
I-41, DLF Industrial Area, Phase-I, Faridabad, Haryana-121003
(vii). Address 2:
NIL
(viii). State:
Haryana
(ix). District:
Faridabad
(x). Tehsil:
Faridabad
(xi). Pin:
121003
(xii). Landmark:
DLF Industrial Area
(xiii). Email Address:
cliffhydro107@gmail.com
(xiv). Landline Telephone No.:
129-4113168
(xv). Fax No.:
01292270212
(xvi). Mobile No.:
9816008539
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
J/Nagar
4.9069
0.6638
Total
4.9069
0.6638
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Mandi
4.9069
0.6638
Total
4.9069
0.6638
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Gramang/450
1.1152
0.5221
2
Khariyan/457
2.2683
0.1345
3
Dhamchayan/426
1.45
0.0072
4
Cheling/425
0.0734
0
Total
4.9069
0.6638
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Trench Weir
0.1565
0.2671
2
Desliting Tank
0.0734
0
3
Pipe line from weir site to desilting tank and fro
0.0627
0.255
4
Muck dumping site
0.6122
0
5
Tunnel and adiit tunnel
0.7818
0
6
Approch road to power house
0
0.0154
7
Transmission line
2.3384
0.0162
8
Forebay
0.3343
0
9
Penstock and spilway
0.1635
0.0501
10
Power house
0.3841
0.06
Total
4.9069
0.6638
C.
Maps of forest land proposed to be diverted
Division 1. : J/Nagar
(i). Area of forest land proposed to be diverted(in ha.) :
4.9069
(ii). Nature of the Project:
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
To view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.
4.9069
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
32
(iii). Temporary Employment(Number of person-days):
82000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Others
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Detail Note of the project
2
General Layout Plan
3
Statement showing detail of forest area proposed for diversion.
4
Statement showing detail of non-forest area involved in the proposal.
5
Letter of Joint Secretary Forest regarding TEC
6
undertaking for additional NPV According to Honorable high court.
7
undertaking for CA Cost.
8
consent latter from Himurja .
9
silent feature
10
certificate for non availability of non forest area for CA f
11
certificate for non availability of non forest area for the contractions for the project
12
NOC From gram Panchayat
13
NOC From Fisheries Department.
14
NOC From I&PH Department.
15
NOC From HPPWD Department.
16
NOC From wild life Department.
17
ECO sensitive Certificate from forest Department of concern Division.
18
latter from DOE for TEC
19
Joint inspection report.
20
Population of affected village.
21
TEC of The Project.
22
Reply latter to DFO J/Nager.
23
observation reply letter dated 10-03-2021
24
pdf forest file of Thaltukhod stage -I project
25
DFO observation reply letter dated 08-07-2021
26
Component of project
27
transmission line detail of the project
28
commpoonent wise detail of the project thaltu loth -1
29
Reply latter for DFO 14/09/2021
30
Undertaking for I/A.
31
Dimension of Dumping of site.
32
Coordinates of Dumping of site.
33
reply on march month
34
Latter to DFO.
35
topo sheet.
36
component wise khasra no detail.
37
Muck management Plan.
38
lyout plane.
39
to sheet
40
muck manajement.
41
GEO refrance map
42
component wise area dimension.
43
complete file of objection.
44
reply later on 22/03/23
45
reply of objection 07/04/2023
46
complete file.
47
evacuation plan.
48
detail of project in River basin Study
49
Reply latter of the objection
50
Complete list/detail of approvrd/existing/proposed project in the Nallaha/River/tributary.
51
reply latter of the objection.
52
Reply latter of the project.
53
Revised reclamation plan.
54
Reply latter of 21/09/2024.
55
reply latter on 13/12/20924
Print