FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/150023/2021
(ii). Name of Project for which Forest Land is required :
Sajla SHEP (2.00 MW)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Sajla SHEP 2.00 MW located near Khakhnal Village of Tehsil Manali in Distt. Kullu (HP)
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
2000
(viii). Area of forest land proposed for diversion(in ha.):
0.7995
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
SERAJ HYDRO POWER DEVELOPERS
(ii). Address1 :
House No. 123 ,Ward No. 4 Raghunathpur Kullu (H.P.)
(iii). Address2 :
NIL
(iv). State :
Himachal Pradesh
(v). District :
Kullu
(vi). Pin :
175101
(vii). Landmark :
Near Raghunathpur LKullu
(viii). Email address :
rajumahantkullu@gmail.com
(ix). Landline Telephone No. :
0-
(x). Fax No. :
0-
(xi). Mobile No. :
9816090030
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Tilak
(ii). Middle Name:
Raj
(iii). Last Name:
Thakur
(iv). Gender:
Male
(v). Designation:
Project incharge
(vi). Address 1:
VPO Bhuthi Tehsil & Distt. Kullu HP
(vii). Address 2:
Himachal Pradesh
(viii). State:
Himachal Pradesh
(ix). District:
Kullu
(x). Tehsil:
Kullu(T)
(xi). Pin:
175102
(xii). Landmark:
Lugvalley
(xiii). Email Address:
1973anujmahant@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9816650267
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.7995
0
Total
0.7995
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.7995
0
Total
0.7995
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Muhal Gojra (20/20)
0.7995
0
Total
0.7995
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Interconnection Point
0.008
0
2
Underground Transmission Line-1
0.0231
0
3
MD-1
0.025
0
4
Road to Power House
0.123
0
5
MD-2
0.015
0
6
Underground Transmission Line-2
0.0002
0
7
Penstock-1
0.4008
0
8
MD-3
0.016
0
9
MD-4
0.02
0
10
D- Tank
0.015
0
11
Score Pipe
0.0005
0
12
Feeder Pipe
0.0015
0
13
Gravel Taper
0.0015
0
14
Weir Site
0.015
0
15
Tail Race
0.005
0
16
Underground Transmission Line-3
0.0022
0
17
MD-5
0.03
0
18
Power House & Switchyard
0.08
0
19
Road to Power House Site
0.0045
0
20
Penstock-2
0.0132
0
Total
0.7995
0
C.
Maps of forest land proposed to be diverted
Division 1. : Kullu
(i). Area of forest land proposed to be diverted(in ha.) :
0.7995
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.7995
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
8
(iii). Temporary Employment(Number of person-days):
180000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
2.0
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
undertaking for additional NPV
2
Allotment Latter
3
undertaking for CA
4
certificate for approval of the proposal
5
certificate for not change the alignment
6
Component wise detail
7
Detail note of the project
8
ECO Zone certificate
9
Field Book
10
NOC of Fisheries Department
11
check list no. 7 forest land detail
12
FRA undertaking
13
Gram Panchayat NOC
14
IPH NOC
15
Joint Inspection Report
16
Layout Plan
17
Muck Estimate
18
Muck Management Plan
19
non availability of non forest land for ca
20
non availability of non forest land certificate
21
check list no. 8 non forest land
22
NPV undertaking
23
PWD NOC
24
TEC & IA undertaking
25
undertaking for fuel/ gas, etc.
26
undertaking for labour camp etc
27
Voilation certificate
28
Wild Life NOC
29
undertaking for population certificate
30
Population Detail of Gojra Village
31
Sajla reply to nodal officer
32
Reply Letter to the DFO
33
Sajla Reply Letter to DFo on dated 01 August 2022
34
HPPTCL Letter to Sajla
35
Impacts of Sajla SHEP
36
TEC of Sajla SHEP
37
Undertaking for IA
38
undertaking for MD Site
39
undertaking for wildlife management Plan
40
River Basin Study of Beas River
41
Revised Layout Plan
42
Tatima Sajal Shep
43
upstream and downstream projects Digital map
44
Sajla FCA in Single PDF
45
Reply to DFO Kullu 08 May 2023
46
Power Generation Capacity
47
Undertaking for WLMP
48
Undertaking for SMP
49
Reply Letter to The DFO 29 June 2023
50
Himurja Power Generation of Sajla
51
DoE letter
52
Reply to The DFO Kullu 8 Jan. 2024
53
Reply Letter to DFO 19 March 2024
54
Reply Letter to the DFO 9 April 2024
Print