FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/150023/2021   (ii). Name of Project for which Forest Land is required : Sajla SHEP (2.00 MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Sajla SHEP 2.00 MW located near Khakhnal Village of Tehsil Manali in Distt. Kullu (HP)   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 2000   (viii). Area of forest land proposed for diversion(in ha.): 0.7995   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : SERAJ HYDRO POWER DEVELOPERS   (ii). Address1 : House No. 123 ,Ward No. 4 Raghunathpur Kullu (H.P.)   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Kullu   (vi). Pin : 175101   (vii). Landmark : Near Raghunathpur LKullu   (viii). Email address : rajumahantkullu@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9816090030   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Tilak   (ii). Middle Name: Raj   (iii). Last Name: Thakur   (iv). Gender: Male   (v). Designation: Project incharge   (vi). Address 1: VPO Bhuthi Tehsil & Distt. Kullu HP   (vii). Address 2: Himachal Pradesh   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: Kullu(T)   (xi). Pin: 175102   (xii). Landmark: Lugvalley   (xiii). Email Address: 1973anujmahant@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9816650267   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.79950
Total0.79950
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.79950
Total0.79950
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Muhal Gojra (20/20)0.79950
Total 0.7995 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Interconnection Point0.0080
2Underground Transmission Line-10.02310
3MD-10.0250
4Road to Power House0.1230
5MD-20.0150
6Underground Transmission Line-20.00020
7Penstock-10.40080
8MD-30.0160
9MD-40.020
10D- Tank0.0150
11Score Pipe0.00050
12Feeder Pipe0.00150
13Gravel Taper0.00150
14Weir Site0.0150
15Tail Race0.0050
16Underground Transmission Line-30.00220
17MD-50.030
18Power House & Switchyard0.080
19Road to Power House Site0.00450
20Penstock-20.01320
Total 0.7995 0
C. Maps of forest land proposed to be diverted
Division 1. : Kullu
  (i). Area of forest land proposed to be diverted(in ha.) : 0.7995   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.7995    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 8   (iii). Temporary Employment(Number of person-days): 180000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 2.0   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1undertaking for additional NPV
2Allotment Latter
3undertaking for CA
4certificate for approval of the proposal
5certificate for not change the alignment
6Component wise detail
7Detail note of the project
8ECO Zone certificate
9Field Book
10NOC of Fisheries Department
11check list no. 7 forest land detail
12FRA undertaking
13Gram Panchayat NOC
14IPH NOC
15Joint Inspection Report
16Layout Plan
17Muck Estimate
18Muck Management Plan
19non availability of non forest land for ca
20non availability of non forest land certificate
21check list no. 8 non forest land
22NPV undertaking
23PWD NOC
24TEC & IA undertaking
25undertaking for fuel/ gas, etc.
26undertaking for labour camp etc
27Voilation certificate
28Wild Life NOC
29undertaking for population certificate
30Population Detail of Gojra Village
31Sajla reply to nodal officer
32Reply Letter to the DFO
33Sajla Reply Letter to DFo on dated 01 August 2022
34HPPTCL Letter to Sajla
35Impacts of Sajla SHEP
36TEC of Sajla SHEP
37Undertaking for IA
38undertaking for MD Site
39undertaking for wildlife management Plan
40River Basin Study of Beas River
41Revised Layout Plan
42Tatima Sajal Shep
43upstream and downstream projects Digital map
44Sajla FCA in Single PDF
45Reply to DFO Kullu 08 May 2023
46Power Generation Capacity
47Undertaking for WLMP
48Undertaking for SMP
49Reply Letter to The DFO 29 June 2023
50Himurja Power Generation of Sajla
51DoE letter
52Reply to The DFO Kullu 8 Jan. 2024
53Reply Letter to DFO 19 March 2024
54Reply Letter to the DFO 9 April 2024