FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/148892/2021
(ii). Name of Project for which Forest Land is required :
Small Hydel Project kandha (0.40MW)
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Proposed Khanda small Hydroelectric Project is a run-of-river type project on Kau khad ,Chainra Nallah in Satluj Basin.The scheme envisages diversion of Kau Nallah inflows by constructing a diversion weir.
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
329
(viii). Area of forest land proposed for diversion(in ha.):
0.74
(ix). Non-forest land required for this project(in ha.):
0.0696
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
BHAGWATI HYDRO POWER PROJECT (OPC) PRIVATE LIMITED
(ii). Address1 :
H.O. Village mumail P.O. & Teh. Karsog Distt. Mandi HP -175011
(iii). Address2 :
NIL
(iv). State :
Himachal Pradesh
(v). District :
Mandi
(vi). Pin :
175011
(vii). Landmark :
Karsog
(viii). Email address :
bhagwatihydropowerproject@gmail.com
(ix). Landline Telephone No. :
0-
(x). Fax No. :
0-
(xi). Mobile No. :
8580535400
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Mohan
(ii). Middle Name:
Singh
(iii). Last Name:
Negi
(iv). Gender:
Male
(v). Designation:
Managing Director
(vi). Address 1:
Vllage mumail PO. Teh Karsog Distt. mandi HP 175011
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Mandi
(x). Tehsil:
Karsog(T)
(xi). Pin:
175011
(xii). Landmark:
Karsog
(xiii). Email Address:
msnegiksg@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9418855351
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Karsog
0.74
0.0696
Total
0.74
0.0696
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Mandi
0.74
0.0696
Total
0.74
0.0696
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Sanog/Doghri
0.074
0.0696
Total
0.074
0.0696
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Weir Site
0.0055
0
2
Conveyance Channel
0
0.0211
3
MD-1
0.0156
0
4
Water Conductor System, Forebay Tank & Penstock
0.1205
0
5
MD-2
0.0113
0
6
MD-3
0.0113
0
7
MD-4
0.0157
0
8
MD-5
0.0156
0
9
Power House, Switchyard & Tail Race
0.0198
0
10
Transmission Line-1
0.2508
0
11
MD-6 Near Approach Road to PH
0.0113
0
12
Road to Power House Site
0.1635
0
13
MD-7 Near Approach Road to PH
0.0113
0
14
Transmission Line-2 & Interconnection Point
0.0609
0
15
Desilting Tank, Spilway and WCS
0.0269
0
16
WCS
0
0.0485
Total
0.74
0.0696
C.
Maps of forest land proposed to be diverted
Division 1. : Karsog
(i). Area of forest land proposed to be diverted(in ha.) :
0.74
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.74
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
4
(iii). Temporary Employment(Number of person-days):
10800
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0.40
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Allotment letter
2
Check List 8 NAC DC certificate of NO alternate
3
Check List 10 Certificate of minimum use of Forest Land
4
Check List 11 Undertaking of CA
5
Check List 12 Undertaking NPV
6
Check List 12 Undertaking additional NPV
7
Joint Inspection Report
8
Check list 19 Undertaking of Non Violation
9
Check list 20 DC Certificate non avalability of non forest land
10
Check list 21 approval of fegibility Report
11
Check list 22 NOC PWD
12
Check list 24 Consent letter
13
Check list 24 TEC
14
Check list 24 NOC IPH
15
NOC Eco Senstive Zone
16
certificate of population benefits
17
NOC Gram Panchayat
18
Undertaking not to change allignment of projrct
19
NOC Wildlife
20
IA
21
Certificate no tree falling in allignment
22
undertaking tree falling under the corridor
23
Undertaking no extra land will be affected.
24
cost reclamaition pla
25
Undertaking Muck to be Dumped At Dumping Site
26
Undertaking for any Damage due to any Land Slide At Site
27
FRA
28
Revenue papers
29
Permanent Employment Detail
30
Project Details
31
Justification of project locating in forest Area
32
Reasons Regarding Acceptance and rejection of allignments
33
NOC PWD
34
Reply to DFO
35
Forest Land Detail
36
non forest land detail
37
component wise breakup
38
Environment and ecological impact
39
Layout Plan Kandha
40
Reclaimation Plan
41
Transmission Line justification
42
undertaking for smc plan
43
up and down with aerial distance map
44
power generation kandha
45
interconnection approval letter
46
Demarcation Report
47
Reply letter to DFO 15 Jan. 2024
48
Reply letter to the DFO Feb. 2024
49
Reply letter to the DFO 2 March 2024
50
Revised Layout Plan Kandha
51
Maps
52
Reply Letter to DFO May 2024
Print