FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/145089/2021   (ii). Name of Project for which Forest Land is required : Pakhnoj-II SHEP (5.00 MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The Proposed Pakhnoj-II SHEP (5.00 MW) is a run of river scheme on Pakhnoj Nallah/river tributary of Beas River located in Nearby Village Soil of Tehsil Manali in Distt. Kullu (HP)   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 5400   (viii). Area of forest land proposed for diversion(in ha.): 2.4957   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : BHOLENATH POWER CONSTRUCTION COMPANY PVT. LTD.   (ii). Address1 : Main Bazar Bhuntar Tehsil Bhuntar   (iii). Address2 : Distt. Kullu HP 175125   (iv). State : Himachal Pradesh   (v). District : Kullu   (vi). Pin : 175125   (vii). Landmark : Near Post Office   (viii). Email address : bholenathpower@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9736501111   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Krishan   (ii). Middle Name: Chand   (iii). Last Name: Verma   (iv). Gender: Male   (v). Designation: Project incharge   (vi). Address 1: Krishan Verma Village Sarabai, Near HPSEB Rest House Post Office Bhuntar,   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: Kullu(T)   (xi). Pin: 175125   (xii). Landmark: Near HPSEB Rest House Sarabai   (xiii). Email Address: bholenathpower@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9736501111   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu2.49570
Total2.49570
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu2.49570
Total2.49570
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Soil2.49570
Total 2.4957 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Weir Site0.0160
2Feeder Pipe0.080
3Desilting Tank0.0250
4Power Pipe0.1750
5Forebay Tank0.020
6Penstock0.28740
7Power House Cum Switchyard0.080
8Tail Race0.0050
9Underground Cable (UTC)0.12130
10Approach Road to Power House Site0.64370
11MD-10.0150
12MD-20.030
13MD-30.080
14MD-40.0080
15MD-50.0240
16MD-60.030
17MD-70.040
18Approach Road to Weir Site Cum Forebay0.81530
Total 2.4957 0
C. Maps of forest land proposed to be diverted
Division 1. : Kullu
  (i). Area of forest land proposed to be diverted(in ha.) : 2.4957   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.4957    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 8   (iii). Temporary Employment(Number of person-days): 180000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 5.0   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1Allotment Latter
2certificate of approval
3certificate for minimum use of forest land
4check list no. 32
5detail note of the project
6detailed report of violation
7eco zone certificate
8Field book
9Fisheries NOC
10Check List no. 7
11IPH NOC
12Joint Inspection Report
13Justification
14Layout Plan
15Muck Dumping Site and Plan
16Muck Dumping Site Estimate
17Non availability of non forest land for compensatory afforestation
18Non availability of non forest land
19Population Detail of the Village
20PWD NOC
21Undertaking for not change the alignment
22Undertaking for TEC & IA
23Undertaking for cooking gas etc
24Undertaking for not establishment any labour camps etc
25Undertaking for additional NPV
26Undertaking for CA
27Undertaking for FRA
28Undertaking for NPV
29Undertaking for submission Gram Panchayat NOC
30Wild Life NOC
31Power Evacuation undertaking
32Reply latter to the Nodal officer
33Reply to the nodal officer 2 May 2022
34reply to The DFO 05 August 2022
35Evacuation Plan
36Tartima Part-1
37Tartima Part-II
38reply to DFO
39Reply letter to DFO Feb. 2023