FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/14396/2015   (ii). Name of Project for which Forest Land is required : MANIMAHESH ENTERPRISES   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Diversion of forest land measuring 0.7649 hac. For Construction of small hydro project0.40MW at Bithri Distt Mandi HP   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 365   (viii). Area of forest land proposed for diversion(in ha.): 0.7649   (ix). Non-forest land required for this project(in ha.): 0.1014   (x). Total period for which the forest land is proposed to be diverted(in years): 50
A-2. Details of User Agency
  (i). Name : M/S MANIMAHESH ENTERPRISES   (ii). Address1 : #123/6 SAMKHETAR MANDI HP   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Mandi   (vi). Pin : 175001   (vii). Landmark : NEAR TOWN HALL   (viii). Email address : manimahesh.group@gmail.com   (ix). Landline Telephone No. : 1905-223752   (x). Fax No. : 1905-235752   (xi). Mobile No. : 9418043752   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: ASHWANI   (ii). Middle Name: KUMAR   (iii). Last Name: WALIA   (iv). Gender: Male   (v). Designation: PROPRITER   (vi). Address 1: 63/11 TARNA HILL MANDI HP   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Mandi   (x). Tehsil: Sadar   (xi). Pin: 175001   (xii). Landmark: NEAR SHIV TAMPLE   (xiii). Email Address: manimahesh.group@gmail.com   (xiv). Landline Telephone No.: 1905-223752   (xv). Fax No.: 01905235752   (xvi). Mobile No.: 9805043752   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Karsog0.76490.1014
Total0.76490.1014
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mandi0.76490.1014
Total0.76490.1014
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1KUTHACHI (BITHRI)0.76490.1014
Total 0.7649 0.1014
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1WIER SITE0.0299920
2CONVENYANCE CHANEL0.0300160
3DESILTING TANK0.0788190
4DUMPING SITE10.0218860
5DUMPING SITE 20.0155820
6PENSTOCK0.0100050
7FORBAY0.0219760
8POWER HOUSE0.0499950
9SWITCH YARD AND TRANSMISSION LINE0.039990
10DUMPING SITE 30.0361140
11WATER CONDUCTOR SYSTEM0.43047350
Total 0.7648485 0
C. Maps of forest land proposed to be diverted
Division 1. : Karsog
  (i). Area of forest land proposed to be diverted(in ha.) : 0.7649   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.0.7649    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 10   (iii). Temporary Employment(Number of person-days): 73000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0.40   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1NOC GRAM PANCHAYAT
2NOC FISHRIES DEPARTMENT
3NAC DEPUTY COMMISIONER
4CHEK LIST SERIAL NO.11
5CHEK LIST SERIAL NO.12
6CHEK LIST SERIAL NO.13
7CONSENT LETTER BY HIMURJA
8POWER EVACUTION LETTER FROM HPTCL
9TEC GOVT NOTIFICATION
10PROJECT LAYOUT PLAN
11PROJECT DETAIL COMPONENTS
12GEO REFERENCE MARKING OF PROJECT
13GOOGLE EARTH MAPING OF PROJECT
14TOPO SHEET
15DGPS SIGNED MAP OF PROJECT SITE
16DGPS SIGNED MAP OF PROJECT SITE
17FOREST LAND RECORD OF PROJECT1
18FOREST LAND RECORD OF PROJECT2
19FOREST LAND RECORD OF PROJECT3
20FRA
21DGPS MAPING
22NSA CERTIFICATE
23Divisional Forest Office Karsog
24Divisional Forest Office Karsog
25short coming reply
26REPLY OF SHORTCOMING
27REPLY FOR REFRENCE EDS DATED 08//12/2017
28justification of project
29COMPLIANCE OF POINT NO 4 & 3 WITH REFRENCE EDS DATED 8/12/2017