FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/13963/2015   (ii). Name of Project for which Forest Land is required : 14 MW UHL S.H.E.P.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Forest land is required for construction of diversion weir, Desilting tank, Tunnel ,Penstock & Transmission line of 14 MW UHL SHEP.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Hybrid   (vii). Estimated cost of the Project(Rupees in lacs) : 14000   (viii). Area of forest land proposed for diversion(in ha.): 12.4332   (ix). Non-forest land required for this project(in ha.): 0.2462   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : PURI OIL MILLS LIMITED   (ii). Address1 : Puri Oil Mills Limited   (iii). Address2 : 302,Jyoti Shikhar, District Center, 8 Janak Puri, New Delhi - 110058   (iv). State : Delhi   (v). District : South West   (vi). Pin : 110058   (vii). Landmark : District Center   (viii). Email address : uhl14mwpoml@outlook.com   (ix). Landline Telephone No. : 11-64300125   (x). Fax No. : 11-   (xi). Mobile No. : 9418057556   (xii). Website (if any) : www.purioilmills.com   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Satinder   (ii). Middle Name: NIL   (iii). Last Name: Singh   (iv). Gender: Male   (v). Designation: Senior Manager(Hydro)   (vi). Address 1: Puri Oil Mills Limited   (vii). Address 2: 302, Jyoti Shikhar, District Center, 8 Janak Puri, New Delhi - 110058   (viii). State: Delhi   (ix). District: South West   (x). Tehsil: Delhi Cantonment.   (xi). Pin: 110058   (xii). Landmark: District Center   (xiii). Email Address: uhl14mwpoml@outlook.com   (xiv). Landline Telephone No.: 11-64300125   (xv). Fax No.: NIL   (xvi). Mobile No.: 9418057556   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.J/Nagar12.43320.2462
Total12.43320.2462
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Mandi12.43320.2462
Total12.43320.2462
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Mayot3.38980
2Khalel2.01460
3Jharwar1.72880
4DPF Jharwar0.16120
5Kathyaru1.89060
6Barot2.74820.2462
7Thuji0.50
Total 12.4332 0.2462
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Diversion Weir1.1310
2Tunnel1.08940
3Surge Shaft0.3660
4Penstock Line0.50660
5Power House & Switch Yard0.7010
6Road1.00360
7Muck Dumping4.00980
8Ropeway0.46140
9Retaining wall & Tail Race0.29560
10Transmission Line2.86880.2462
Total 12.4332 0.2462
C. Maps of forest land proposed to be diverted
Division 1. : J/Nagar
  (i). Area of forest land proposed to be diverted(in ha.) : 12.4332   (ii). Nature of the Project: Hybrid   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.9.5644    View File
  (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.2.8688    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 30   (iii). Temporary Employment(Number of person-days): 150
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Yes   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Yes   (a). Reason Category: Other reason   (b). Provide reasons thereof: As the total forest land area to be diverted is 12   (c). Area of non-forest or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation (in ha.): 11.3438   (iii). No. of districts involved for raising Compensatory Afforestation: 1   (iv). No. of patches: Two   (v). Scanned copy of the map of the land identified for creation of Compensatory Afforestation prepared by using GPS ot Total Station:   (vi). Copy of Survey of India Toposheet in 1:50,000 scale indicating location of the land identified for creation of Compensatory Afforestation:
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 14   (ii). Total command area of the Project(in ha.): 12.6794   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Authority letter - Ashok Khatri
2NOC HPPWD
3IPH
4Joint inspection Report
5Reply of the observation in connection with Forest case- Uhl-14 MW, On 26-5-2017.
6Reply of the observation no.4,Cost benefits Analysis.
7CA Scheme duly approved CF Hamirpur.
8Dizital Map
9land Use Map.
10SOI Topo Sheet
11Jamabandi
12Tatimas
13Reply on the observation to DFO jo-Nagar.