FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/138838/2021
(ii). Name of Project for which Forest Land is required :
Construction of Chaned Small Hydro Project (1 MW) in District Chamba
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Chaned Small Hydro Project (1 MW) is a run of the river scheme which has been envisaged to utilize the water of Kohlari Nala at EL 935 m and Power House on left bank of Kohlari Nala at EL 839.5 m near village Bhanota in District Chamba. Water from the Power House shall be released into the Kohlari N
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
929
(viii). Area of forest land proposed for diversion(in ha.):
0.5684
(ix). Non-forest land required for this project(in ha.):
0.1024
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
O.H.P PROJECT PVT.LTD.
(ii). Address1 :
Village Tadoli Chamba (H.P)
(iii). Address2 :
-Do-
(iv). State :
Himachal Pradesh
(v). District :
Chamba
(vi). Pin :
176310
(vii). Landmark :
Opp. PWD Store
(viii). Email address :
ohpprojects@gmail.com
(ix). Landline Telephone No. :
0-
(x). Fax No. :
0-
(xi). Mobile No. :
9419275411
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Yuvraj
(ii). Middle Name:
NIL
(iii). Last Name:
Thukral
(iv). Gender:
Male
(v). Designation:
Project Manager
(vi). Address 1:
Chamba tadoli village , P.O Saru chamba
(vii). Address 2:
-Do-
(viii). State:
Himachal Pradesh
(ix). District:
Chamba
(x). Tehsil:
Chamba(T)
(xi). Pin:
176310
(xii). Landmark:
NIL
(xiii). Email Address:
yuvraj028@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9915553895
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Dalhousie
0.5684
0.1024
Total
0.5684
0.1024
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Chamba
0.5684
0.1024
Total
0.5684
0.1024
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Bhanota
0.5684
0.1024
Total
0.5684
0.1024
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Weir Site
0.0444
0
2
Conveyance Channel
0.014
0
3
Desilting Tank
0.0085
0
4
Pipeline
0.2252
0.1024
5
Spillway
0.017
0
6
Forebay Tank
0.0065
0
7
Penstock
0.012
0
8
Power House and Switchyard
0.1068
0
9
Tail Race
0.003
0
10
Raod
0.0398
0
11
Road cum Transmission
0.0566
0
12
Dumping Site I
0.0202
0
13
Dumping Site II
0.0064
0
14
Dumping Site III
0.008
0
Total
0.5684
0.1024
C.
Maps of forest land proposed to be diverted
Division 1. : Dalhousie
(i). Area of forest land proposed to be diverted(in ha.) :
0.5684
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.5684
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
12
(iii). Temporary Employment(Number of person-days):
24500
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
1
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Form A Part I
2
Detail Note
3
Check List 6 Detail of Forest Land
4
Check List 7 Detail of Non Forest Land
5
Check List 8 DC Certificate No Alternative
6
Check List 10 Certificate Minimum Use
7
Check List 10 Alternative Details
8
Check List 11 Undertaking to Pay Cost of CA
9
Check List 12 Undertaking to Pay Cost of NPV
10
Check List 12 Undertaking to Pay Cost of Additional NPV
11
Check List 19 Undertaking Non Violation
12
Check List 20 DC Certificate Non Availability of CA Land
13
NOC PWD
14
NOC Panchayat
15
Check List 23 Detail of Road and Transmission
16
Check List 24 Component wise Detail of Land
17
Check List 24 Consent Letter
18
Check List 24 Copy of TEC
19
Check List 24 Copy of IA
20
Check List 24 Copy of Tripartite Agreement
21
Check List 24 NOC IPH Department
22
Check List 24 NOC Fisheries Department
23
NOC Wildlife
24
Certificate Beneficiaries
25
Certificate Eco Sensitive Zone
26
Check List 32 Reclamation Plan
27
Reply to EDS Regional Office
28
Scanned Proposal I
29
Scanned Proposal I
30
Scanned Proposal II
31
Scanned Proposal III
32
Scanned Proposal IV
33
Scanned Proposal V
34
Aerial Distance Map of Projects in Landscape
35
Action Plan for preventing Soil Erosion
36
Reply to EDS
37
Reply to the Observations raised in REC Meeting
Print