FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/12958/2015
(ii). Name of Project for which Forest Land is required :
LINGTI SMALL HYDRO PROJECT
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
Lingti Small Hydro Project 500 kW is a run of the river scheme which has been envisaged to utilize the water of Lingti khad, a tributary of Neugal Khad in Beas Basin for power generation. The scheme involves construction of Weir structure at EL 1710 m on Lingti khad, near village Rakh. The De-siltin
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
420
(viii). Area of forest land proposed for diversion(in ha.):
1.1163
(ix). Non-forest land required for this project(in ha.):
0.0014
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
PRASHANTI HYDRO ENERGIES PRIVATE LIMITED
(ii). Address1 :
SAI SANKALP, NEAR PNB BAGHER ROAD,
(iii). Address2 :
PANCHRUKHI, TEHSIL PALAMPUR
(iv). State :
Himachal Pradesh
(v). District :
Kangra
(vi). Pin :
176103
(vii). Landmark :
NEAR PNB
(viii). Email address :
parshanti.hydro@gmail.com
(ix). Landline Telephone No. :
1892-260089
(x). Fax No. :
1892-0
(xi). Mobile No. :
9910039880
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
NEERAJ
(ii). Middle Name:
NIL
(iii). Last Name:
VASHISTH
(iv). Gender:
Male
(v). Designation:
DIRECTOR
(vi). Address 1:
SAI SANKALP, NEAR PNB BAGHER ROAD,
(vii). Address 2:
PANCHRUKHI, TEHSIL PALAMPUR
(viii). State:
Himachal Pradesh
(ix). District:
Kangra
(x). Tehsil:
Palampur(T)
(xi). Pin:
176103
(xii). Landmark:
NIL
(xiii). Email Address:
parshanti.hydro@gmail.com
(xiv). Landline Telephone No.:
1892-260089
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9910039880
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Palampur
1.1163
0.0014
Total
1.1163
0.0014
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kangra
1.1163
0.0014
Total
1.1163
0.0014
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Rakh
1.1163
0
Total
1.1163
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Weir Site
0.015
0
2
Conveyance Channel
0.003
0
3
Desilting cum forebay
0.02
0
4
Silt flushing pipe
0.001
0
5
Pen Stock
0.1988
0
6
Tail Race
0.001
0
7
Power House and switch yard
0.1009
0
8
Transmission Line
0.615
0
9
Dumping-1
0.015
0
10
Dumping-2
0.015
0
11
Dumping-3
0.0153
0
12
Dumping-4
0.0221
0
13
Dumping-5
0.0075
0
14
Dumping-6
0.0141
0
Total
1.0437
0
C.
Maps of forest land proposed to be diverted
Division 1. : Palampur
(i). Area of forest land proposed to be diverted(in ha.) :
1.1163
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
1.1163
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
15
(iii). Temporary Employment(Number of person-days):
45000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
0.5
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
Allotment Letter of the Project
2
Certificate from DC regarding Non Availability of Non Forest Land for CA and for location of the Project
3
NOC from Panchayat and other departments
4
TEC of the Project from DOE
5
Implementation Agreement`
6
Certificate Beneficiary
7
FRA along with proceeding
8
Joint Inspection report
9
Site Inspection report
10
FRA With SDm proceeding As per requried by your good office Also Uploaded Against K(i) of part -1
11
Detail Note on project
12
Details of lenght ,Width of ROW
13
NOc From Dept of Fisheries
14
Detail of forest area Involved
15
Detail of non-forest area Involved
16
justification of location of the project in forest area
17
Certificate of minumum use of forest land
18
alternatives examined and reasons for rejections
19
undertaking to bear cost of CA
20
undertaking to bear cost of NPV & additional NPV
21
Land suitability certificate for 2.5 Hac
22
certificate for no tree felling .
23
Project Field book
24
IRO observations reply
25
Component wise breakup
26
Justification for CIA and CCS study
27
Layout Plan
28
Muck Management Plan
29
Power evacuation plan
30
Reclamation Plan
31
Toposheet
32
Undertaking for adherence stipulated eflow
33
Undertaking for SMCP
34
Schedule-III certificate
35
Zero tree certificate
36
tatima
Print