FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/12958/2015   (ii). Name of Project for which Forest Land is required : LINGTI SMALL HYDRO PROJECT   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Lingti Small Hydro Project 500 kW is a run of the river scheme which has been envisaged to utilize the water of Lingti khad, a tributary of Neugal Khad in Beas Basin for power generation. The scheme involves construction of Weir structure at EL 1710 m on Lingti khad, near village Rakh. The De-siltin   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 420   (viii). Area of forest land proposed for diversion(in ha.): 1.1163   (ix). Non-forest land required for this project(in ha.): 0.0014   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : PRASHANTI HYDRO ENERGIES PRIVATE LIMITED   (ii). Address1 : SAI SANKALP, NEAR PNB BAGHER ROAD,   (iii). Address2 : PANCHRUKHI, TEHSIL PALAMPUR   (iv). State : Himachal Pradesh   (v). District : Kangra   (vi). Pin : 176103   (vii). Landmark : NEAR PNB   (viii). Email address : parshanti.hydro@gmail.com   (ix). Landline Telephone No. : 1892-260089   (x). Fax No. : 1892-0   (xi). Mobile No. : 9910039880   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: NEERAJ   (ii). Middle Name: NIL   (iii). Last Name: VASHISTH   (iv). Gender: Male   (v). Designation: DIRECTOR   (vi). Address 1: SAI SANKALP, NEAR PNB BAGHER ROAD,   (vii). Address 2: PANCHRUKHI, TEHSIL PALAMPUR   (viii). State: Himachal Pradesh   (ix). District: Kangra   (x). Tehsil: Palampur(T)   (xi). Pin: 176103   (xii). Landmark: NIL   (xiii). Email Address: parshanti.hydro@gmail.com   (xiv). Landline Telephone No.: 1892-260089   (xv). Fax No.: NIL   (xvi). Mobile No.: 9910039880   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Palampur1.11630.0014
Total1.11630.0014
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kangra1.11630.0014
Total1.11630.0014
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1RAKH1.11630.0014
Total 1.1163 0.0014
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1WEIR SITE0.0150
2CONVEYANCE CHANNEL TO D TANK0.0030
3SILT FLUSHING0.0010
4POWER PPE0.19880
5DUMPING SITE I TO VI0.08490
6POWER HOUSE COMPLEX0.10090
7ROAD0.0070
8ROAD AND TRANSMISSION0.39550.0014
9STAFF QUARTERS0.0750
10DESILTING TANK0.020
11TRANSMISSION LINE0.21520
Total 1.1163 0.0014
C. Maps of forest land proposed to be diverted
Division 1. : Palampur
  (i). Area of forest land proposed to be diverted(in ha.) : 1.1163   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.1.1163    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 45000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Certificate from Chief Secretary regarding non-availability of suitable non-forest/ revenue forest land
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 0.5   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1Allotment Letter of the Project
2Certificate from DC regarding Non Availability of Non Forest Land for CA and for location of the Project
3NOC from Panchayat and other departments
4TEC of the Project from DOE
5Implementation Agreement`
6Reply to EDS
7Certificate Beneficiary
8FRA along with proceeding
9Joint Inspection report
10Site Inspection report
11observations attended and forwarded for your necessary action please
12FRA With SDm proceeding As per requried by your good office Also Uploaded Against K(i) of part -1
13Detail Note on project
14Lay out Plan of project
15Details of lenght ,Width of ROW
16NOc From Dept of Fisheries
17Detail of forest area Involved
18Detail of non-forest area Involved
19justification of location of the project in forest area
20Certificate of minumum use of forest land
21alternatives examined and reasons for rejections
22undertaking to bear cost of CA
23undertaking to bear cost of NPV & additional NPV
24Land suitability certificate for 2.5 Hac
25certificate for no tree felling .
26forwarding letter on 13/10/2023
27Project Field book
28Project Field book/Parcha
29All the required documents are uploaded as desired by your good office and the case is resubmitted again for yours furthers persuals..
30Map showing the project area is uploaded and all the other requried certificates are uploadad in additional information this is for your information and necessary actiion please
31
32GEO REFERENCE MAP
33Land Use MaP lingti
34all the neccessary obsorbation at user agency end are attended and case is re submitted for further action at your end please
35all the necessary observation at user agency end are attended and case is re submitted for further action at your end please
36
37All the necessary observation are attended and case is re submitted for taking necessary action.