FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/HP/HYD/123608/2021   (ii). Name of Project for which Forest Land is required : SHANAG MIDDLE HEP 100KW   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : There is proposal for the C/o Shanag Middle Micro Hydel Electric Project (100 kw) is located between Elevation 2135 mtr. to Elevation 2100 mtr. on Halandi Stream in Distt. Kullu H.P. which is tributary of Beas River. the Shanag Middle Mircro Hydel Project is a run of the river scheme for 100 kw.   (iv). State : Himachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 197   (viii). Area of forest land proposed for diversion(in ha.): 0.1669   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : PRAKASH CHAND, VPO- SHANAG, TEHSIL- MANALI, DISTRICT- KULLU(SHANAG MIDDLE HEP 100KW)   (ii). Address1 : VPO- Shanag, Tehsil- Maanali, District- Kullu (HP)   (iii). Address2 : NIL   (iv). State : Himachal Pradesh   (v). District : Kullu   (vi). Pin : 175131   (vii). Landmark : NIL   (viii). Email address : charanjeetmanali@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9816801607   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Prakash   (ii). Middle Name: NIL   (iii). Last Name: Chand   (iv). Gender: Male   (v). Designation: Proprietor   (vi). Address 1: VP0-Shanag, Tehsil-Manali, District- Kullu   (vii). Address 2: NIL   (viii). State: Himachal Pradesh   (ix). District: Kullu   (x). Tehsil: Manali(T)   (xi). Pin: 175131   (xii). Landmark: NIL   (xiii). Email Address: charanjeetmanali@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9816801607   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.16690
Total0.16690
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Kullu0.16690
Total0.16690
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Shanag0.16690
Total 0.1669 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Desilting Tank Cunm Forebay0.0120
2Trench Weir0.0060
3Feeder channel0.00190
4Flushing Pipe0.0030
5Muck Dumping site -10.0160
6Muck Dumping site -20.0050
7Muck Dumping site -30.0160
8Muck Dumping site -40.0060
9Penstock0.07260
10Power House0.020
11Transmission Line0.0050
12Tail Race 17x2m0.00340
Total 0.1669 0
C. Maps of forest land proposed to be diverted
Division 1. : Kullu
  (i). Area of forest land proposed to be diverted(in ha.) : 0.1669   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.0.1669    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 7   (iii). Temporary Employment(Number of person-days): 3000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: No
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : Yes   (a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: Not Applicable   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Not Applicable
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): .1   (ii). Total command area of the Project(in ha.): 0
Additional information Details
Documents
S.No Documents
Remarks
1NOC from Gram Panchayat
2NOC from Wildlife
3Joint inspection report
4Non availability of non forest land
5Letter of consent
6Certificate for the minimum use of forest land
7Undertaking for the payment of the cost of compensatory afforestation
8Undertaking for the payment of the Net Present Value of Forest area
9Undertaking for the fuel wood & cooking gas/karosene oil
10Undertaking for the carryout construction within jurisdiction under forest range
11Undertaking for the environment loss and net forest value
12Detail note on the project
13Form A part -1
14Detail of muck generation
15Layout plan of Shanag middle HEP
16Detail of forest area proposed for diversion for construction
17Detail of non forest area involved in construction
18Reclamation plan for dumping site
19Undertaking for Implementation Agreement
20Undertaking for Techno-economic Clearance
21Undertaking for Payment of Additional NPV, if Any.
22Component Wise Area Details
23HPSEBL- Transmission Line
24Reply on shortcomings
25Status of TEC and IA
26Reply to observations dated 22-09-2021 against letter from DFO dated 15-09-2021 with enclosures
27IPH NOC
28PWD NOC
29TEC Shanag Middle
30Reply to Observations dated 13-10-2022 with documents enclosed
31Relevant details has already been made online
32Jamabandi and tatima uploaded on 06-06-2023
33Reply in respect to Observations from O/o Pr. CCf, H.P dated: 17-05-2023
34Reply in respect of letter no FC/HPB/01/151/2022 dated 20-12-2024
35Digital maps with ESZ distance
36Distance from Nearest Eco Zone and Wildlife Sanctuary
37Capacity of Halindi Stream declared by HIMURJA
38Beas Basin Study
39MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE NOTIFICATION on Manali Wildlife Sanctuary
40Beas Basin Cpapcity- from Directorate of Energy
41Reply to Query dated 09-07-2024
42Reply to query dated 08-08-2024
43Reply to online query dated 25-sep-2024 for E-flow
44Undertaking- of 15% E-Flow downstream of Weir
45REPLY TO ONLINE QUERY DATED 09-12-2024