FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/HP/HYD/123608/2021
(ii). Name of Project for which Forest Land is required :
SHANAG MIDDLE HEP 100KW
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
There is proposal for the C/o Shanag Middle Micro Hydel Electric Project (100 kw) is located between Elevation 2135 mtr. to Elevation 2100 mtr. on Halandi Stream in Distt. Kullu H.P. which is tributary of Beas River. the Shanag Middle Mircro Hydel Project is a run of the river scheme for 100 kw.
(iv). State :
Himachal Pradesh
(v). Category of the Proposal :
Hydel
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
197
(viii). Area of forest land proposed for diversion(in ha.):
0.1669
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
40
A-2.
Details of User Agency
(i). Name :
PRAKASH CHAND, VPO- SHANAG, TEHSIL- MANALI, DISTRICT- KULLU(SHANAG MIDDLE HEP 100KW)
(ii). Address1 :
VPO- Shanag, Tehsil- Maanali, District- Kullu (HP)
(iii). Address2 :
NIL
(iv). State :
Himachal Pradesh
(v). District :
Kullu
(vi). Pin :
175131
(vii). Landmark :
NIL
(viii). Email address :
charanjeetmanali@gmail.com
(ix). Landline Telephone No. :
0-
(x). Fax No. :
0-
(xi). Mobile No. :
9816801607
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
Private
A-3.
Details of Person Making Application
(i). First Name:
Prakash
(ii). Middle Name:
NIL
(iii). Last Name:
Chand
(iv). Gender:
Male
(v). Designation:
Proprietor
(vi). Address 1:
VP0-Shanag, Tehsil-Manali, District- Kullu
(vii). Address 2:
NIL
(viii). State:
Himachal Pradesh
(ix). District:
Kullu
(x). Tehsil:
Manali(T)
(xi). Pin:
175131
(xii). Landmark:
NIL
(xiii). Email Address:
charanjeetmanali@gmail.com
(xiv). Landline Telephone No.:
0-
(xv). Fax No.:
NIL
(xvi). Mobile No.:
9816801607
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.1669
0
Total
0.1669
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Kullu
0.1669
0
Total
0.1669
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Shanag
0.1669
0
Total
0.1669
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Desilting Tank Cunm Forebay
0.012
0
2
Trench Weir
0.006
0
3
Feeder channel
0.0019
0
4
Flushing Pipe
0.003
0
5
Muck Dumping site -1
0.016
0
6
Muck Dumping site -2
0.005
0
7
Muck Dumping site -3
0.016
0
8
Muck Dumping site -4
0.006
0
9
Penstock
0.0726
0
10
Power House
0.02
0
11
Transmission Line
0.005
0
12
Tail Race 17x2m
0.0034
0
Total
0.1669
0
C.
Maps of forest land proposed to be diverted
Division 1. : Kullu
(i). Area of forest land proposed to be diverted(in ha.) :
0.1669
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
0.1669
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
7
(iii). Temporary Employment(Number of person-days):
3000
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
No
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
Yes
(a). Copy of documentry evidence in support of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted:
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
Not Applicable
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
Not Applicable
(iii) . Reason for not providing Non-Forest Land:
Not Applicable
M.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project(in MW):
.1
(ii). Total command area of the Project(in ha.):
0
Additional information Details
Documents
S.No
Documents
Remarks
1
NOC from Gram Panchayat
2
NOC from Wildlife
3
Joint inspection report
4
Non availability of non forest land
5
Letter of consent
6
Certificate for the minimum use of forest land
7
Undertaking for the payment of the cost of compensatory afforestation
8
Undertaking for the payment of the Net Present Value of Forest area
9
Undertaking for the fuel wood & cooking gas/karosene oil
10
Undertaking for the carryout construction within jurisdiction under forest range
11
Undertaking for the environment loss and net forest value
12
Detail note on the project
13
Form A part -1
14
Detail of muck generation
15
Layout plan of Shanag middle HEP
16
Detail of forest area proposed for diversion for construction
17
Detail of non forest area involved in construction
18
Reclamation plan for dumping site
19
Undertaking for Implementation Agreement
20
Undertaking for Techno-economic Clearance
21
Undertaking for Payment of Additional NPV, if Any.
22
Component Wise Area Details
23
HPSEBL- Transmission Line
24
Reply on shortcomings
25
Status of TEC and IA
26
Reply to observations dated 22-09-2021 against letter from DFO dated 15-09-2021 with enclosures
27
IPH NOC
28
PWD NOC
29
TEC Shanag Middle
30
Reply to Observations dated 13-10-2022 with documents enclosed
31
Relevant details has already been made online
32
Jamabandi and tatima uploaded on 06-06-2023
33
Reply in respect to Observations from O/o Pr. CCf, H.P dated: 17-05-2023
34
Reply in respect of letter no FC/HPB/01/151/2022 dated 20-12-2024
35
Digital maps with ESZ distance
36
Distance from Nearest Eco Zone and Wildlife Sanctuary
37
Capacity of Halindi Stream declared by HIMURJA
38
Beas Basin Study
39
MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE NOTIFICATION on Manali Wildlife Sanctuary
40
Beas Basin Cpapcity- from Directorate of Energy
41
Reply to Query dated 09-07-2024
42
Reply to query dated 08-08-2024
43
Reply to online query dated 25-sep-2024 for E-flow
44
Undertaking- of 15% E-Flow downstream of Weir
45
REPLY TO ONLINE QUERY DATED 09-12-2024
Print