FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Proposal No. :
FP/AR/TRANS/40560/2019
(ii). Name of Project for which Forest Land is required :
Construction of 132 KV S/C on D/C Transmission line from Naharlagun to Gerukamukh under Comp.Scheme T & D in Arunachal Pradesh.
(iii). Short narrative of the proposal and Project/scheme for which the forest land is required :
The proposed 132 Kv S/C on D/C transmission line from Naharlagun to Gerukamukh is a sub project which is conceived under the Govt.of India ambitious project"Comprehensive Scheme for strengthening of T & D in Arunachal Pradesh"
(iv). State :
Arunachal Pradesh
(v). Category of the Proposal :
Transmission Line
(vi). Shape of forest land proposed to be diverted :
Linear
(vii). Estimated cost of the Project(Rupees in lacs) :
675
(viii). Area of forest land proposed for diversion(in ha.):
230.44
(ix). Non-forest land required for this project(in ha.):
0
(x). Total period for which the forest land is proposed to be diverted(in years):
75
A-2.
Details of User Agency
(i). Name :
DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH
(ii). Address1 :
BIDYUT BHAWAN, ZIRO POINT TINIALI,
(iii). Address2 :
ITANAGAR, ARUNACHAL PRADESH
(iv). State :
Arunachal Pradesh
(v). District :
Papum Pare
(vi). Pin :
791111
(vii). Landmark :
NEAR ZIRO POINT TINIALI
(viii). Email address :
baishyasantana@gmail.com
(ix). Landline Telephone No. :
360-2257301
(x). Fax No. :
360-
(xi). Mobile No. :
9436255253
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State Government
A-3.
Details of Person Making Application
(i). First Name:
Janu
(ii). Middle Name:
NIL
(iii). Last Name:
Taying
(iv). Gender:
Male
(v). Designation:
EE
(vi). Address 1:
Naharlagun Electrical Division, Yupia, Papum Pare
(vii). Address 2:
Arunachal Pradesh
(viii). State:
Arunachal Pradesh
(ix). District:
Papum Pare
(x). Tehsil:
Naharlagun Circle
(xi). Pin:
791110
(xii). Landmark:
DC Papum Pare Office
(xiii). Email Address:
dopcompnrj@gmail.com
(xiv). Landline Telephone No.:
360-2257301
(xv). Fax No.:
NIL
(xvi). Mobile No.:
6909297316
(xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B.
Details of land required for the Project
B-1.
Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no
Proposal Status.
Proposal No.
Moef File No.
Area Proposed for Diversion(Ha.)
Area Diverted(Ha.)
Date of In-Principle Approval
Date of Final Approval
NIL
B-2.
Details of forest land proposed to be diverted
B-2.1
Details of Divisions involved
Details of Divisions involved
S.no
Division Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Banderdewa Forest Division,Banderdewa
202.31
0
2.
Sagalee Forest Division, Sagalee
28.13
0
Total
230.44
0
B-2.2
Details of Districts involved
District wise breakup
S.no
District Name
Forest Land(ha.)
Non-Forest Land(ha.)
1.
Papum Pare
230.44
0
Total
230.44
0
B-2.3
Village wise breakup
Villages wise breakup
S.no
Village
Forest Land(ha.)
Non-Forest Land(ha.)
1
Midpu
7.292
0
2
Tumru
5.567
0
3
Ross
5.127
0
4
Lekhi
14.771
0
5
Hoj
18.133
0
6
Appa
6.782
0
7
Potin
23.994
0
8
Upper Lichi
8.448
0
9
Lower Lichi
12.914
0
10
Upper Sher
8.966
0
11
Lower Sher
5.248
0
12
Hawa Camp
12.46
0
13
Lower Jhumi
6.069
0
14
Upper Jhumi
4.735
0
15
Kakoi 1
8.248
0
16
Kakoi 2
13.049
0
17
Siya July
7.732
0
18
NEFA Basti
16.769
0
19
Shullung Basti
9.096
0
20
Lalii Basti
5.737
0
21
Bogi Nadi
7.47
0
22
Lungshi
12.554
0
23
Paro Basti
4.047
0
24
Rigyu
2.017
0
25
Gerukamukh
3.215
0
Total
230.44
0
B-2.4
Component wise breakup
Component wise breakup
S.no
Component
Forest Land(ha.)
Non-Forest Land(ha.)
1
Right of way of 132 kv TL under Banderdewa Forest
202.311
0
2
Right of way of 132 kv TL under Sagalee Forest Div
28.08
0
Total
230.391
0
C.
Maps of forest land proposed to be diverted
Division 1. : Sagalee Forest Division, Sagalee
(i). Area of forest land proposed to be diverted(in ha.) :
28.13
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
28.13
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Banderdewa Forest Division,Banderdewa
(i). Area of forest land proposed to be diverted(in ha.) :
202.31
(ii). Nature of the Project:
Linear
(b). No. of Segments :
One
Segment wise details
Segments
Segment Area(in ha.)
Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.
202.31
View File
(iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:
(iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D.
Justification for locating the Project in forest land and details of alternatives examined:
(i). Copy of note containing justification for locating the Project in forest land:
(ii). Whether a copy of map indicating location of alternative examine is required to be provided:
Yes
(a). Copy of map indicating location of alternative examined:
E.
Employment likely to be generated
(i). Whether the Project is likely to generate employment ?:
Yes
(ii). Permanent/Regular Employment(Number of persons):
30
(iii). Temporary Employment(Number of person-days):
6500
F.
Displacement of People due to the Project, if any
(i). Whether Project involves displacement?:
No
G.
Details of Cost-Benefit analysis for the Project
(i). Whether the Project requires Cost-Benefit analysis?:
Yes
(a). Copy of Cost-Benefit analysis:
H.
Status of Environmental Clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
I.
Status of Wildelife Clearance
(i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? :
No
J.
Applicability of special provisions governing Scheduled Areas
(i).Whether the Project or a part thereof is located in a Scheduled Area? :
No
K.
Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
(i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? :
No
L.
Details of land identified for Compensatory Afforestation
(i). Whether non-forest or Revenue forest land is required to be provided by User Agency?:
No
(ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?:
No
(iii) . Reason for not providing Non-Forest Land:
Central Govt. Project
Additional information Details
Documents
S.No
Documents
Remarks
1
Undertaking For Additional NPV
2
Authorization
3
Undertaking for CBA
4
Undertaking for survey done by TS
5
Undertaking for Compliance of FRA
6
Undertaking for Justification
7
Undertaking for minimum use of forest land
8
Undertaking for statement of Forest land
9
Undertaking to bear CA
10
Undertaking to bear CBA
11
Undertaking to bear cost of protection and generation.
12
Tower diagram
13
Certificate from Ministry of Power
14
Certificate from MoU
15
Comparitive Statement of line
16
Basic component of TL
Print