FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/AR/TRANS/40560/2019   (ii). Name of Project for which Forest Land is required : Construction of 132 KV S/C on D/C Transmission line from Naharlagun to Gerukamukh under Comp.Scheme T & D in Arunachal Pradesh.   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed 132 Kv S/C on D/C transmission line from Naharlagun to Gerukamukh is a sub project which is conceived under the Govt.of India ambitious project"Comprehensive Scheme for strengthening of T & D in Arunachal Pradesh"   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 675   (viii). Area of forest land proposed for diversion(in ha.): 230.44   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 75
A-2. Details of User Agency
  (i). Name : DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH   (ii). Address1 : BIDYUT BHAWAN, ZIRO POINT TINIALI,   (iii). Address2 : ITANAGAR, ARUNACHAL PRADESH   (iv). State : Arunachal Pradesh   (v). District : Papum Pare   (vi). Pin : 791111   (vii). Landmark : NEAR ZIRO POINT TINIALI   (viii). Email address : baishyasantana@gmail.com   (ix). Landline Telephone No. : 360-2257301   (x). Fax No. : 360-   (xi). Mobile No. : 9436255253   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Janu   (ii). Middle Name: NIL   (iii). Last Name: Taying   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: Naharlagun Electrical Division, Yupia, Papum Pare   (vii). Address 2: Arunachal Pradesh   (viii). State: Arunachal Pradesh   (ix). District: Papum Pare   (x). Tehsil: Naharlagun Circle   (xi). Pin: 791110   (xii). Landmark: DC Papum Pare Office   (xiii). Email Address: dopcompnrj@gmail.com   (xiv). Landline Telephone No.: 360-2257301   (xv). Fax No.: NIL   (xvi). Mobile No.: 6909297316   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Banderdewa Forest Division,Banderdewa202.310
2.Sagalee Forest Division, Sagalee28.130
Total230.440
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Papum Pare230.440
Total230.440
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Midpu7.2920
2Tumru5.5670
3Ross5.1270
4Lekhi14.7710
5Hoj18.1330
6Appa6.7820
7Potin23.9940
8Upper Lichi8.4480
9Lower Lichi12.9140
10Upper Sher8.9660
11Lower Sher5.2480
12Hawa Camp12.460
13Lower Jhumi6.0690
14Upper Jhumi4.7350
15Kakoi 18.2480
16Kakoi 213.0490
17Siya July7.7320
18NEFA Basti16.7690
19Shullung Basti9.0960
20Lalii Basti5.7370
21Bogi Nadi7.470
22Lungshi12.5540
23Paro Basti4.0470
24Rigyu2.0170
25Gerukamukh3.2150
Total 230.44 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Right of way of 132 kv TL under Banderdewa Forest202.3110
2Right of way of 132 kv TL under Sagalee Forest Div28.080
Total 230.391 0
C. Maps of forest land proposed to be diverted
Division 1. : Sagalee Forest Division, Sagalee
  (i). Area of forest land proposed to be diverted(in ha.) : 28.13   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.28.13    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Banderdewa Forest Division,Banderdewa
  (i). Area of forest land proposed to be diverted(in ha.) : 202.31   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.202.31    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 30   (iii). Temporary Employment(Number of person-days): 6500
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Central Govt. Project
Additional information Details
Documents
S.No Documents
Remarks
1Undertaking For Additional NPV
2Authorization
3Undertaking for CBA
4Undertaking for survey done by TS
5Undertaking for Compliance of FRA
6Undertaking for Justification
7Undertaking for minimum use of forest land
8Undertaking for statement of Forest land
9Undertaking to bear CA
10Undertaking to bear CBA
11Undertaking to bear cost of protection and generation.
12Tower diagram
13Certificate from Ministry of Power
14Certificate from MoU
15Comparitive Statement of line
16Basic component of TL