A-1. Project Details
  (i). Proposal No. : FP/AR/TRANS/153117/2022   (ii). Name of Project for which Forest Land is required : Construction of 132 kV S/C on D/C Tower from Roing to Dambuk under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed 132kV S/C on D/C Tower from Roing to Dambuk TL is a sub-project conceived under Govt. of India’s ambitious project namely, 'Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal Pradesh.   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 319940   (viii). Area of forest land proposed for diversion(in ha.): 18.244   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 75
A-2. Details of User Agency
  (i). Name : DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH   (ii). Address1 : Vidyut Bhawan, Ziro Point Tiniali, Itanagar,791111   (iii). Address2 : NIL   (iv). State : Arunachal Pradesh   (v). District : Papum Pare   (vi). Pin : 791111   (vii). Landmark : Opposit PCCF office   (viii). Email address : compitanagar55@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9401940762   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Taduram   (ii). Middle Name: NIL   (iii). Last Name: Darang   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: EXECUTIVE ENGINNER, DIVISION-III,DEPARTMENT OF POWER, PASIGHAT, ARUNACHAL PRADESH   (vii). Address 2: NIL   (viii). State: Arunachal Pradesh   (ix). District: East Siang   (x). Tehsil: Pasighat Circle   (xi). Pin: 791102   (xii). Landmark: nil   (xiii). Email Address: compitanagar55@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9401940762   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1InprincipleFP/AR/TRANS/43326/201900
Total 0 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Dibang Forest Division18.2440
Total18.2440
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Lower Dibang Valley18.2440
Total18.2440
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Ezengo11.7530
2sukha Nala6.4910
Total 18.244 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Right of Way of 132 KV TL18.2440
Total 18.244 0
C. Maps of forest land proposed to be diverted
Division 1. : Dibang Forest Division
  (i). Area of forest land proposed to be diverted(in ha.) : 18.244   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.18.244    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Map showing details of alternative routes Examined
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 7000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: Not Applicable   (iii) . Reason for not providing Non-Forest Land: Central PSU Projects
Additional information Details
Documents
S.No Documents
Remarks
1Authorization Letter
2Justification
3Undertaking for FRA
4Undertaking for minimum use of forest land
5Undertaking for NPV
6Undertaking for bearing the cost of CA
7Undertaking for Survey done by TS
8Comparison of Alternative Route
9Undertaking for bearing Extrraction Cost
10Geo Ref of proposed Route
11MOU between POWERGRID & Dept. of Power
12Ministry of Power Approval
13Statement of RF/USF
14Diagrammatic 3D sketch of TL
15Cost Benefit Analysis
16The SOI Map indicating the proposed Transmission Line from section line 8/1 to 11/2 and AP13/0 to 18/1 along with the GPS Coordinates as required in compliance point no. 1
17The SOI Map indicating 3-Alternate Routes examination for the proposed transmission line segment 8/1 to 11/2 and AP13/0 to 18/1 is enclosed as per compliance no. 4