FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/AR/TRANS/152556/2022   (ii). Name of Project for which Forest Land is required : Construction of 132 kV S/C on D/C Tower from Along to Yeingkiong under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The proposed 132kV S/C on D/C Tower from Along to Yeingkiong TL is a sub-project conceived under Govt. of India’s ambitious project namely, 'Comprehensive Scheme for Strengthening of Transmission & Distribution System in Arunachal Pradesh.   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 319945   (viii). Area of forest land proposed for diversion(in ha.): 257.05   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 75
A-2. Details of User Agency
  (i). Name : DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH   (ii). Address1 : Vidyut Bhawan, Ziro Point Tiniali, Itanagar,791111   (iii). Address2 : NIL   (iv). State : Arunachal Pradesh   (v). District : Papum Pare   (vi). Pin : 791111   (vii). Landmark : Opposit PCCF office   (viii). Email address : compitanagar55@gmail.com   (ix). Landline Telephone No. : 0-   (x). Fax No. : 0-   (xi). Mobile No. : 9401940762   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: Taduram   (ii). Middle Name: NIL   (iii). Last Name: Darang   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: EXECUTIVE ENGINNER, DIVISION-III,DEPARTMENT OF POWER, PASIGHAT, ARUNACHAL PRADESH   (vii). Address 2: NIL   (viii). State: Arunachal Pradesh   (ix). District: East Siang   (x). Tehsil: Pasighat Circle   (xi). Pin: 791102   (xii). Landmark: nil   (xiii). Email Address: compitanagar55@gmail.com   (xiv). Landline Telephone No.: 0-   (xv). Fax No.: NIL   (xvi). Mobile No.: 9401940762   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
Proposal Submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
1InprincipleFP/AR/TRANS/43326/201900
Total 0 0
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Aalo Forest Division, Aalo69.960
2.Yingkiong Forest Division187.090
Total257.050
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.West Siang69.960
1.Upper Siang187.090
Total257.050
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Pakkam6.6060
2Jomlu Monku3.8010
3Aalo2.670
4Panya 14.73330
5No village5.0050
6Jogum Jini3.2480
7Jomlu Monku.2.5320
8Gebu1.3660
9Jomlu Monku..8.6610
10Mori village3.1880
11Jommo Village6.4150
12No. Village15.6920
13Lileng Forest5.7620
14lileng7.70850
15Boling3.3480
16lieng5.30280
17Dosing6.76350
18Parong16.95060
19Sitang3.02940
20Sitang.4.44150
21Dite Dim7.25490
22Kamku10.40310
23Boom3.55590
24Peram4.47390
25Sikadine25.39620
26Pangkang10.52190
27Kamku.12.98430
28Jengging5.37840
29Gobuck2.11140
30Karko10.1520
31Simong4.85730
32Riga5.73210
33Gosang Landslide13.48920
34Yeingkiong2.9430
35Moying3.78810
36Kamki2.41920
37No Village/3.85560
Total 246.5401 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Right of Way of 132 KV TL257.050
Total 257.05 0
C. Maps of forest land proposed to be diverted
Division 1. : Yingkiong Forest Division
  (i). Area of forest land proposed to be diverted(in ha.) : 187.09   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.187.09    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Aalo Forest Division, Aalo
  (i). Area of forest land proposed to be diverted(in ha.) : 69.96   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.69.96    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: No   (a). Reason for not providing such map: Map showing details of alternative routes Examined
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 8850
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Central PSU Projects
Additional information Details
Documents
S.No Documents
Remarks
1Authorization letter
2Undertaking for CBA
3Undertaking for FRA
4Undertaking for minimum use of forest land
5Undertaking for NPV
6Undertaking for Safety Zone
7Undertaking for Survey done by TS
8Comparison of Alternative Route
9Undertaking for bearing Extraction Cost
10Geo Ref of proposed Route
11Alternate Route of Proposed Route
12MOU between POWERGRID & Dept. of Power
13Ministry of Power Approval
14Diagrammatic 3D sketch of TL
15Cost Benefit Analysis
16Statement of Forest Land (RF, USF,)
17justification