FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/AR/TRANS/145264/2021   (ii). Name of Project for which Forest Land is required : Construction of 132kV Transmission line from Changlang to Jairampur under Comprehensive Scheme for Strengthening of Transmission and Distribution System in Arunachal Pradesh   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : The Proposed 132 kV TL from Changlang to Jairampur is a Sub Project which is conceived under the Govt of India ambitious project namely Comprehensive Scheme for Strengthening of T&D system in Arunachal Pradesh ( A central sector project funded by GoI and being implemented by POWERGRID)   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Transmission Line   (vi). Shape of forest land proposed to be diverted : Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 7000   (viii). Area of forest land proposed for diversion(in ha.): 136.458   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 75
A-2. Details of User Agency
  (i). Name : DEPARTMENT OF POWER GOVT OF ARUNACHAL PRADESH   (ii). Address1 : BIDYUT BHAWAN, ZIRO POINT TINIALI,   (iii). Address2 : ITANAGAR, ARUNACHAL PRADESH   (iv). State : Arunachal Pradesh   (v). District : Papum Pare   (vi). Pin : 791111   (vii). Landmark : NEAR ZIRO POINT TINIALI   (viii). Email address : baishyasantana@gmail.com   (ix). Landline Telephone No. : 360-2257301   (x). Fax No. : 360-   (xi). Mobile No. : 9436255253   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State Government
A-3. Details of Person Making Application
  (i). First Name: NIDO   (ii). Middle Name: NIL   (iii). Last Name: TAKA   (iv). Gender: Male   (v). Designation: EE   (vi). Address 1: DEPARTMENT OF POWER, OFFICE OF THE EXECUTIVE ENGINEER, MIAO ELECTRICAL DIVISION   (vii). Address 2: NIL   (viii). State: Arunachal Pradesh   (ix). District: Changlang   (x). Tehsil: Miao Circle   (xi). Pin: 792122   (xii). Landmark: NIL   (xiii). Email Address: miao_electricaldivision1@yahoo.com   (xiv). Landline Telephone No.: 360-2257301   (xv). Fax No.: NIL   (xvi). Mobile No.: 8753993011   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Changlang S/F Division, Changlang59.84820
2.Nampong Forest Division,Jairampur76.60980
Total136.4580
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Changlang136.4580
Total136.4580
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Yantang5.570
2Waltom7.960
3Phangtip4.260
4Longchuk2.50
5Nodi par10.860
6Sohe Laktong4.420
7Longlung8.850
8Kengkhu11.170
9Jungmaisung7.170
10Chinook0.780
11Khuchep 12.780
12Khuchep 23.460
13Jonglim Pothar7.140
14Forest area13.0110
15Manmao Town6.650
16Lungsang5.130
17Old Kamlao4.570
18New Kamlao14.860
19Hetlong5.670
Total 126.811 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1ROW of 132kV (USF Changlang)59.84820
2ROW of 132kV (USF Nampong)38.19150
3ROW of 132kV (Khamtang RF)25.41780
4ROW of 132kV (Honkap RF)13.00050
Total 136.458 0
C. Maps of forest land proposed to be diverted
Division 1. : Changlang S/F Division, Changlang
  (i). Area of forest land proposed to be diverted(in ha.) : 59.8482   (ii). Nature of the Project: Linear   (b). No. of Segments : One
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.59.8482    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
Division 2. : Nampong Forest Division,Jairampur
  (i). Area of forest land proposed to be diverted(in ha.) : 76.6098   (ii). Nature of the Project: Linear   (b). No. of Segments : Three
Segment wise details
Segments Segment Area(in ha.) Kml File of Segments
(To view KML file on google the same may be downloaded and then open if in google earth install in your computer).
1.38.1915    View File
2.25.4178    View File
3.13.0005    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:   (ii). Whether a copy of map indicating location of alternative examine is required to be provided: Yes   (a). Copy of map indicating location of alternative examined:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 15   (iii). Temporary Employment(Number of person-days): 80000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : Yes
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Central Govt. Project
Additional information Details
Documents
S.No Documents
Remarks
1Undertaking for payment of NPV
2Undertaking for payment of additional NPV
3Undertaking for protection and regeneration of safety zone
4Undertaking for payment of cost of compensatory afforestation
5Undertaking for minimum use of forest land
6Undertaking for compliance of FRA
7Undertaking for survey done by TS
8Undertaking for minimum felling of trees
9Undertaking for payment of extraction cost
10Statement of forest land
11Cost benefit analysis
12Justification for selection of proposed route
13Comparative statement of three alternatives
14GoI sanction order
15MoU between POWERGRID & Department of Power
16GPS coordinates of the proposed transmission line
173D Map of the proposed transmission line
183D view of the 132kV TL (ROW & clearance)
19Proposed route map of 132kV Transmission line from Changlang to Jairampur
20Topo map of 132kV Transmission line from Changlang to Jairampur
21Geo ref map of 132kV Transmission line from Changlang to Jairampur
22Topo map of Changlang Division for 132kV Transmission line from Changlang to Jairampur
23Geo ref map of Changlang Division for 132kV Transmission line from Changlang to Jairampur
24Topo map of Nampong Division for 132kV Transmission line from Changlang to Jairampur
25Geo ref map of Nampong Division for 132kV Transmission line from Changlang to Jairampur
26Topo map of USF, Nampong Division for 132kV Transmission line from Changlang to Jairampur
27Geo ref map of USF, Nampong Division for 132kV Transmission line from Changlang to Jairampur
28Topo map of Khamtang RF, Nampong Division for 132kV Transmission line from Changlang to Jairampur
29Geo ref map of Khamtang RF, Nampong Division for 132kV Transmission line from Changlang to Jairampur
30Topo map of Honkap RF, Nampong Division for 132kV Transmission line from Changlang to Jairampur
31Geo ref map of Honkap RF, Nampong Division for 132kV Transmission line from Changlang to Jairampur