FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/AR/HYD/24836/2017   (ii). Name of Project for which Forest Land is required : Nyukcharong Chu Hydro Electric Project (96 MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Nyukcharong Chu HEP (96 MW)is proposed on Nyukcharong Chu, under S.F Division Tawang in Arunachal Pradesh. 22m high&74.20m long barrage,1271m long HRT & U.G Power House are proposed. The bare minimum Forest land required for the project is 38.46ha. The estimated annual generation is 466.12 GWh.   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 99590   (viii). Area of forest land proposed for diversion(in ha.): 38.46   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : SEW NYUKCHARONG CHU POWER CORPORATION LTD   (ii). Address1 : 6-3-871, Snehalata Building, Greenlands Road, Begumpet, Hyderabad, Telangana State.   (iii). Address2 : NIL   (iv). State : Telangana   (v). District : Hyderabad   (vi). Pin : 500016   (vii). Landmark : Near Chief Minister's Camp office   (viii). Email address : sewnyukcharongchu@sewinfra.com   (ix). Landline Telephone No. : 40-66300000   (x). Fax No. : 40-66300001   (xi). Mobile No. : 9447740422   (xii). Website (if any) : www.sewinfra.com   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Jayaprakash   (ii). Middle Name: NIL   (iii). Last Name: Natesan   (iv). Gender: Male   (v). Designation: BusinessAssociate   (vi). Address 1: 6-3-871, Snehalata Building, Greenlands Road, Begumpet, Hyderabad, Telangana State.   (vii). Address 2: NIL   (viii). State: Telangana   (ix). District: Hyderabad   (x). Tehsil: Ameerpet   (xi). Pin: 500016   (xii). Landmark: Near Chief Minister's Camp Office   (xiii). Email Address: sewnyukcharongchu@sewinfra.com   (xiv). Landline Telephone No.: 40-66300000   (xv). Fax No.: 4066300001   (xvi). Mobile No.: 9447740422   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tawang SF Division. Tawang38.460
Total38.460
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tawang38.460
Total38.460
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Rho19.9350
2Rho/Jangda18.5250
Total 38.46 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Labour colony-12.090
2Reservoir area LB0.090
3Reservoir area RB0.810
4Barrage,Head works area etc. LB3.550
5Barrage,Head works area etc. RB3.330
6Facility area-10.340
7Quarry area-1 RB0.50
8Muck dump yard-11.470
9Stack yard 11.480
10Magazine0.210
11Residential area-11.070
12Facility area-21.260
13Quarry area-2 LB0.250
14Stack yard-20.550
15Muck Dump yard-20.370
16Residential area-21.410
17Labour Colony-20.730
18Muck Dump Yard-33.320
19Approach Road to Right Bank0.760
20Approach Road to Barrage top & Labour colony-10.370
21Approach Road to Adit to Surge Shaft & HRT0.720
22Approach Road to Surge Shaft0.690
23Approach Road to Muck Dump Yard-30.890
24Approach Road to Labour Colony-20.110
25Surge Shaft,Portals of Adit to Surge Shaft & HRT1.930
26Facility area-30.80
27Residential Area-30.50
28Pot Head Yard0.450
29Approach road to Magazine0.330
30Facility area-40.630
31River portion in Reservoir0.870
32River portion in Barrage,Head works area etc.0.580
33River portion for Bridge to LB U/S0.030
34River portion for Bridge to RB D/S0.030
35Notional Under Ground area for Feeder Tunnels,DSC,3.480
36Notional Under Ground area for Power House,Adits &1.420
37Notional Under Ground area for Head Race Tunnel1.040
Total 38.46 0
C. Maps of forest land proposed to be diverted
Division 1. : Tawang SF Division. Tawang
  (i). Area of forest land proposed to be diverted(in ha.) : 38.46   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.38.46    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 75   (iii). Temporary Employment(Number of person-days): 525000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC obtained   (b). Environmental Clearance File No.: J-12011/45/2009/IA.I   (c). Copy of Environmental Clearance to the Project:   (d). Date of grant of Environmental Clearance to the Project: 03 Mar 2016
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 96   (ii). Total command area of the Project(in ha.): 0   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Project summary
2Memorandum of Agreement (MOA)
3Executive summary
4Incorporation certificate of SPV
5Permission for survey and investigation
6Note on Alternative site considered
7Salient Features
8Project layout map
9Muck Disposal Plan as provided in the approved EIA/EMP report
10Undertaking to bear the cost of Compensatory Afforestation
11Undertaking to bear the cost of NPV
12Undertaking to bear the cost of Additional NPV
13Undertaking to bear the cost of Cost of Forest Produces
14Undertaking that the project works will be commenced after getting final Forest Clearance from MoEF&CC
15Certificate under Section K of Form A regarding Settlement of Rights under FRA- 2006
16Certificate under Section L of Form A regarding Land for Compensatory Afforestation.
17List of undertakings/Certificates/documents furnished.