FORM - A
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
PART - I
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Proposal No. : FP/AR/HYD/17213/2015   (ii). Name of Project for which Forest Land is required : Mago Chu Hydro Electric Project (96MW)   (iii). Short narrative of the proposal and Project/scheme for which the forest land is required : Mago Chu HEP(96MW) is proposed on Mago Chu, under SF Division Tawang in Arunachal Pradesh. 20.5m high & 47.8m long barrage, 2773m long HRT, & underground PH are proposed.The bare minimum Forest land required for the project is 37.35ha.The Project can generate an annual energy of 404.42GWh   (iv). State : Arunachal Pradesh   (v). Category of the Proposal : Hydel   (vi). Shape of forest land proposed to be diverted : Non Linear   (vii). Estimated cost of the Project(Rupees in lacs) : 87912   (viii). Area of forest land proposed for diversion(in ha.): 37.35   (ix). Non-forest land required for this project(in ha.): 0   (x). Total period for which the forest land is proposed to be diverted(in years): 40
A-2. Details of User Agency
  (i). Name : SEW MAGOCHU POWER CORPORATION LTD   (ii). Address1 : 6-3-871 SNEHALATHA BUILDING GREENLANDS ROAD BEGUMPET   (iii). Address2 : HYDERABAD   (iv). State : Telangana   (v). District : Hyderabad   (vi). Pin : 500016   (vii). Landmark : NEAR CM CAMP OFFICE   (viii). Email address : Jayaprakash.natesan@sewinfra.com   (ix). Landline Telephone No. : 40-66300000   (x). Fax No. : 40-66300001   (xi). Mobile No. : 9447740422   (xii). Website (if any) : www.sewinfra.com   (xiii). Legal status of User Agency : Private
A-3. Details of Person Making Application
  (i). First Name: Jayaprakash   (ii). Middle Name: NIL   (iii). Last Name: Natesan   (iv). Gender: Male   (v). Designation: Business Associate   (vi). Address 1: 6-3-871,Snehalatha Building, Green lands Road, Begmpet, Hyderabad   (vii). Address 2: NIL   (viii). State: Telangana   (ix). District: Hyderabad   (x). Tehsil: Ameerpet   (xi). Pin: 500016   (xii). Landmark: Near CM camp Office   (xiii). Email Address: jayaprakash.natesan@sewinfra.com   (xiv). Landline Telephone No.: 40-66300000   (xv). Fax No.: 04066300001   (xvi). Mobile No.: 9447740422   (xvii). Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
B. Details of land required for the Project
B-1. Details of proposal seeking prior approval of Central Government under the Act for diversion of forest land for the Project already submitted in the past
List of proposal submitted in Past
S.no Proposal Status. Proposal No. Moef File No. Area Proposed for Diversion(Ha.) Area Diverted(Ha.) Date of In-Principle Approval Date of Final Approval
NIL
B-2. Details of forest land proposed to be diverted
B-2.1 Details of Divisions involved
Details of Divisions involved
S.no Division Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tawang SF Division. Tawang37.350
Total37.350
B-2.2 Details of Districts involved
District wise breakup
S.no District Name Forest Land(ha.) Non-Forest Land(ha.)
1.Tawang37.350
Total37.350
B-2.3 Village wise breakup
Villages wise breakup
S.no Village Forest Land(ha.) Non-Forest Land(ha.)
1Rho23.3650
2Yuthembu13.9850
Total 37.35 0
B-2.4 Component wise breakup
Component wise breakup
S.no Component Forest Land(ha.) Non-Forest Land(ha.)
1Labour Colony-10.510
2Reservoir area-LB0.510
3Reservoir area-RB0.730
4Barrage,Head works etc - LB1.540
5Barrage,Head works,Intake,DS basin,Feeder tunnels3.750
6Replacement Road near Barrage RB0.390
7Abutment for Bridge to Barrage site Left Bank-LB0.020
8Abutment for Bridge to Barrage Left bank-RB0.020
9Facility area-11.580
10Portal of Adit to HRT0.150
11Muck Dump Yard-11.950
12Stack Yard-11.520
13Approach road to Stack yard-10.140
14Approach road to Surge Shaft0.650
15Approach road to Adit to SS & HRT0.260
16Labour Colony-20.780
17Facility area-20.20
18Quarry area-10.250
19Facility area-30.730
20Pot Head Yard0.160
21Approach road to MAT,TRT&Adit to portal of valve c0.560
22Surge Shaft area2.20
23Approach road to Magazine0.150
24Magazine0.250
25Facility area-40.150
26Abutment for Bridge to Right Bank near PH-LB0.020
27Abutment for Bridge to Right Bank near PH-RB0.020
28Quarry area-20.50
29Stack yard-20.860
30Muck Dump Yard-20.90
31Approach road to Muck dump yard-30.830
32Labour colony-30.10
33Labour colony-40.660
34Stack yard-30.470
35Muck dump yard-33.240
36Permanent Colony-11.50
37Head works,Feeder Tunnels,Adit to HRt,GOC etc3.230
38River portion in Reservoir area1.250
39River portion in Barrage,Head works,Intake,DS basi0.830
40River portion for Bridge to Barrage site Left Bank0.060
41River portion for Bridge to RB near PH0.030
42River portion for Bridge to MAT near PH0.040
43Notional Under ground area for HRT2.120
44Notional Under ground area for Adit to HRT0.080
45Notional Under ground area for PH,PS,Penstock,MAT,1.460
Total 37.35 0
C. Maps of forest land proposed to be diverted
Division 1. : Tawang SF Division. Tawang
  (i). Area of forest land proposed to be diverted(in ha.) : 37.35   (ii). Nature of the Project: Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of PatchesTo view KML file on google the same may be downloaded and then open if in google earth install in your computer.
1.37.35    View File
  (iii). Copy of Survey of India Toposheet indicating boundary of forest land proposed to be diverted:   (iv). Scanned copy of the Geo-referenced map of the forest land proposed to be diverted prepared by using GPS or Total Station:
D. Justification for locating the Project in forest land and details of alternatives examined:
  (i). Copy of note containing justification for locating the Project in forest land:
E. Employment likely to be generated
  (i). Whether the Project is likely to generate employment ?: Yes   (ii). Permanent/Regular Employment(Number of persons): 75   (iii). Temporary Employment(Number of person-days): 525000
F. Displacement of People due to the Project, if any
  (i). Whether Project involves displacement?: No
G. Details of Cost-Benefit analysis for the Project
  (i). Whether the Project requires Cost-Benefit analysis?: Yes   (a). Copy of Cost-Benefit analysis:
H. Status of Environmental Clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project: EC obtained   (b). Environmental Clearance File No.: J-12011/46/2009-IA.I   (c). Copy of Environmental Clearance to the Project:   (d). Date of grant of Environmental Clearance to the Project: 03 Mar 2016
I. Status of Wildelife Clearance
  (i). Whether the Project or a part thereof is located in any Protected Area or their Eco sensitive zone? : No
J. Applicability of special provisions governing Scheduled Areas
  (i).Whether the Project or a part thereof is located in a Scheduled Area? : No
K. Status of settlement of rights under the Forest Rights Act,2006 on the forest land proposed to be diverted
  (i). Whether the process for settlement of Rights under the Forest Rights Acts 2006 on the forest land proposed to be diverted has been completed? : No
L. Details of land identified for Compensatory Afforestation
  (i). Whether non-forest or Revenue forest land is required to be provided by User Agency?: No   (ii). Whether the area of non-forest land or Revenue forest land required to be provided by User Agency for raising Compensatory Afforestation is less than area of forest land proposed to be diverted ?: No   (iii) . Reason for not providing Non-Forest Land: Others
M. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project(in MW): 96   (ii). Total command area of the Project(in ha.): 0   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):   (b). Copy of the approved CAT plan:
Additional information Details
Documents
S.No Documents
Remarks
1Project Summary
2Memorandum of Agreement
3Executive Summary
4Incorporation Certificate of SPV
5Permission for Survey and Investigation.
6Note on Alternate site considered
7Salient Features
8Project Layout Map
9Copy of Muck Disposal Plan as provided in the approved EIA/EMP report
10Undertaking to bear the cost of Compensatory Afforestation
11Undertaking to bear the cost of NPV
12Undertaking to bear the cost of Additional NPV
13Undertaking to bear the cost of Forest produces
14Undertaking that the work will be commenced after getting final Forest Clarence from MOEF&CC
15Certificate under section K of Form A regarding Settlement of Rights under FRA- 2006
16Certificate under section L of Form A regarding land for Compensatory Afforestation
17List of undertakings/certificates /Documents furnished.