Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Kaithal)
|
EDS
|
User Agency (bpclamb@gmail.com)
|
13/05/2021
|
Please remove eds as per attach letter
|
|
2
|
User Agency (bpclamb@gmail.com)
|
REPLY
|
DFO (Kaithal)
|
19/03/2022
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Kaithal)
|
EDS
|
User Agency (bpclamb@gmail.com)
|
21/03/2022
|
Kindly upload written letter/reply & also submit the hard copy in the Division Office Kaithal.
|
|
4
|
User Agency (bpclamb@gmail.com)
|
REPLY
|
DFO (Kaithal)
|
05/04/2022
|
The correction have been made as per the instruction received
|
|
5
|
Nodal Officer
|
EDS
|
CF (North Circle Panchkula)
|
28/07/2022
|
Case Down
|
|
6
|
CF (North Circle Panchkula)
|
EDS
|
DFO (Kaithal)
|
28/07/2022
|
Please update report as per letter attach
|
|
7
|
DFO (Kaithal)
|
EDS
|
User Agency (pawankumar006@bharatpetroleum.in)
|
02/08/2022
|
Please update report as per letter attach
|
|
8
|
User Agency (pawankumar006@bharatpetroleum.in)
|
REPLY
|
DFO (Kaithal)
|
18/11/2023
|
The correction have been made as per the instruction received
|
|
9
|
DFO (Kaithal)
|
REPLY
|
CF (North Circle Panchkula)
|
24/11/2023
|
R/Sir
EDS removed as per APCCF (FCA)Panchkula Letter.
|
|
10
|
CF (North Circle Panchkula)
|
REPLY
|
Nodal Officer
|
24/11/2023
|
case updated by DFO
|
|
11
|
Nodal Officer
|
EDS
|
CF (North Circle Panchkula)
|
12/02/2024
|
As per point No. 1 of this office letter dated 28.7.2022 of which copy is again attached, detail of earlier approved proposal has to be filled up in column B-1 of part -I online. so upload the same.
|
|
12
|
CF (North Circle Panchkula)
|
EDS
|
DFO (Kaithal)
|
12/02/2024
|
please update the case according to the instrucltion
|
|
13
|
DFO (Kaithal)
|
REPLY
|
CF (North Circle Panchkula)
|
12/02/2024
|
R/Sir
Sent back as per your mobile message on dated 12-02-2024
|
|
14
|
CF (North Circle Panchkula)
|
REPLY
|
Nodal Officer
|
12/02/2024
|
for further action
|
|
15
|
State secretary
|
EDS
|
Nodal Officer
|
25/04/2024
|
1. Uploaded map of Diverted land is without signature
2. Uploaded toposheet of CA site is without Number and Signature
3.Density of Vegetation is not Match with the Part II recommended letter by dfo pls revise recommended letter with correct Density
4.uploaded toposheet of CA site is without number and Signature
5.Fordwing letter with part III documnet which attached in part II addl information the amount is not match with the CA scheme
|
|
16
|
Nodal Officer
|
EDS
|
CF (North Circle Panchkula)
|
26/04/2024
|
1. Uploaded map of Diverted land is without signature. 2. Uploaded toposheet of CA site is without Number and Signature 3.Density of Vegetation is not Match with the Part II recommended letter by DFO pls revise recommended letter with correct Density 4.uploaded toposheet of CA site is without number and Signature 5.Forwarding letter with part III document which attached in part II Addll. information the amount is not match with the CA scheme
|
|
17
|
CF (North Circle Panchkula)
|
EDS
|
DFO (Kaithal)
|
29/04/2024
|
please update the case according to the instructions received
|
|
18
|
DFO (Kaithal)
|
REPLY
|
CF (North Circle Panchkula)
|
14/05/2024
|
R/Sir
EDS removed as per instructions received :
1) Map of diverted land uploaded in additional information with Signature.
2) Toposheet of CA site is uploaded with number and signature.
3)Density of Vegetation Recommendation has been changed in Part 2 but column16.3 has been locked due to which it cannot be uploaded in Column No. 16.3, it has been uploaded in Additional information. Please upload it in Column 16.3 at your level.
4) Part III amount of CA is revised by CCF North Ambala level.
|
|
19
|
CF (North Circle Panchkula)
|
REPLY
|
Nodal Officer
|
28/05/2024
|
case updated by DFO
|
|
20
|
Nodal Officer
|
EDS
|
CF (North Circle Panchkula)
|
13/09/2024
|
EDS by Nodal Office
|
|
21
|
CF (North Circle Panchkula)
|
EDS
|
DFO (Kaithal)
|
16/09/2024
|
forwarded case
|
|
22
|
DFO (Kaithal)
|
REPLY
|
CF (North Circle Panchkula)
|
21/11/2024
|
R/sir
Site inspection report uploaded on parivesh portal. Kindly process the case
|
|
23
|
CF (North Circle Panchkula)
|
REPLY
|
Nodal Officer
|
21/11/2024
|
forwarded take necessary action
|
|