| Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
|
1
|
DFO (Darjeeling)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
10/12/2020
|
As described in the pdf file uploaded
|
|
|
2
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Darjeeling)
|
25/12/2020
|
The correction have been made as per the instruction received
|
|
|
3
|
DFO (Kalimpong Forest Division)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
02/02/2021
|
kindly go through the letter no 272/9-39 dated 02/02/2021
|
|
|
4
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Kalimpong Forest Division)
|
24/02/2021
|
The correction have been made as per the instruction received
|
|
|
5
|
CF (Hill Circle)
|
EDS
|
DFO (Kalimpong Forest Division)
|
02/03/2021
|
minor correction to be made in the proposal of kalimpong Division
|
|
|
6
|
DFO (Kalimpong Forest Division)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
02/03/2021
|
Necessary corrections were done and details uploaded
|
|
|
7
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Kalimpong Forest Division)
|
03/03/2021
|
The correction have been made as per the instruction received
|
|
|
8
|
DFO (Kalimpong Forest Division)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
04/03/2021
|
Necessary corrections done
|
|
|
9
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Kalimpong Forest Division)
|
04/03/2021
|
The correction have been made as per the instruction received
|
|
|
10
|
DFO (Kalimpong Forest Division)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
04/03/2021
|
Necessary corrections done
|
|
|
11
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Kalimpong Forest Division)
|
04/03/2021
|
The correction have been made as per the instruction received
|
|
|
12
|
DFO (Kalimpong Forest Division)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
04/03/2021
|
Necessary rectifications done
|
|
|
13
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Kalimpong Forest Division)
|
04/03/2021
|
The correction have been made as per the instruction received
|
|
|
14
|
DFO (Kalimpong Forest Division)
|
REPLY
|
CF (Hill Circle)
|
04/03/2021
|
Corrections were made as instructed
|
|
|
15
|
DFO (Kalimpong Forest Division)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
04/03/2021
|
Necessary corrections done
|
|
|
16
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Kalimpong Forest Division)
|
04/03/2021
|
The correction have been made as per the instruction received
|
|
|
17
|
CF (Hill Circle)
|
EDS
|
DFO (Darjeeling)
|
05/03/2021
|
DFO KPg div. kindly upload the corrected copy in eds section.
|
|
|
18
|
CF (Hill Circle)
|
EDS
|
DFO (Kurseong)
|
05/03/2021
|
DFO KPg div. kindly upload the corrected copy in eds section.
|
|
|
19
|
DFO (Kurseong)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
05/03/2021
|
Upload signed CA location shown in toposheet
|
|
|
20
|
DFO (Darjeeling)
|
EDS
|
User Agency (dyceconnjp@gmail.com)
|
05/03/2021
|
As described in the pdf file uploaded along with reply from User Agency,
|
|
|
21
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Kurseong)
|
05/03/2021
|
The correction have been made as per the instruction received
|
|
|
22
|
User Agency (dyceconnjp@gmail.com)
|
REPLY
|
DFO (Darjeeling)
|
05/03/2021
|
The correction have been made as per the instruction received
|
|
|
23
|
DFO (Kurseong)
|
REPLY
|
CF (Hill Circle)
|
05/03/2021
|
Singed CA earmarked toposheet has been uploaded for necessary action
|
|
|
24
|
DFO (Darjeeling)
|
REPLY
|
CF (Hill Circle)
|
05/03/2021
|
As described in the pfd file uploaded with reply from the User Agency.
|
|
|
25
|
Nodal Officer
|
EDS
|
CF (Hill Circle)
|
08/03/2021
|
Please send the hard copy of all the divisions involved, immediately , treat this as most urgent.
|
|
|
26
|
CF (Hill Circle)
|
EDS
|
DFO (Kalimpong Forest Division)
|
10/03/2021
|
As per Nodal Officer query the proposal is returned herewith for necessary correction as desired.
|
|
|
27
|
CF (Hill Circle)
|
EDS
|
DFO (Darjeeling)
|
10/03/2021
|
As per Nodal Officer query the proposal is returned herewith for necessary correction as desired.
|
|
|
28
|
CF (Hill Circle)
|
EDS
|
DFO (Kurseong)
|
10/03/2021
|
As per Nodal Officer query the proposal is returned herewith for necessary correction as desired.
|
|
|
29
|
DFO (Kurseong)
|
REPLY
|
CF (Hill Circle)
|
11/03/2021
|
The necessary rectification has been done from this end as per the queries.
|
|
|
30
|
DFO (Kalimpong Forest Division)
|
REPLY
|
CF (Hill Circle)
|
15/03/2021
|
Correction has been done
|
|
|
31
|
DFO (Darjeeling)
|
REPLY
|
CF (Hill Circle)
|
15/03/2021
|
RECTIFIED
|
|
|
32
|
CF (Hill Circle)
|
REPLY
|
Nodal Officer
|
15/03/2021
|
the necessary rectification has been done in DFO's proposal in hard copy of all divisions.
|
|
|
33
|
Nodal Officer
|
EDS
|
CF (Hill Circle)
|
17/03/2021
|
Please upload the Geo coordinates for CA land under DFO Kurseong Division
|
|
|
34
|
CF (Hill Circle)
|
EDS
|
DFO (Kurseong)
|
17/03/2021
|
Please upload the coordinates for CA area under DFO Kurseong Division
|
|
|
35
|
DFO (Kurseong)
|
REPLY
|
CF (Hill Circle)
|
17/03/2021
|
Forwarding herewith the geo coordinates of CA land over 1.1 Ha
|
|
|
36
|
CF (Hill Circle)
|
REPLY
|
Nodal Officer
|
17/03/2021
|
as per query Geo-coordinate for CA land necessary correction has been done from Kurseong Division.
|
|
|
37
|
Nodal Officer
|
EDS
|
CF (Hill Circle)
|
18/03/2021
|
Please upload the Geo coordinates for CA land under DFO Kurseong Division
|
|
|
38
|
CF (Hill Circle)
|
EDS
|
DFO (Kurseong)
|
18/03/2021
|
Please upload the coordinates for CA area under DFO Kurseong Division
|
|
|
39
|
DFO (Kurseong)
|
REPLY
|
CF (Hill Circle)
|
18/03/2021
|
Forwarding herewith the geo coordinates of CA land over 1.1 Ha
|
|
|
40
|
CF (Hill Circle)
|
REPLY
|
Nodal Officer
|
18/03/2021
|
as per query Geo-coordinate for CA land necessary correction has been done from Kurseong Division.
|
|
|
41
|
Regional Office
|
EDS
|
State secretary
|
16/04/2021
|
1. Hard copy of SoI map file showing 12 individual proposed areas for diversion along with GPS Coordinates duly signed/Seal by competent authorities.
2. Soft copy of KML/Shape file showing proposed area for diversion and CA area along with GPS coordinated.
2. Map showing aerial distance from the proposed project sites to the nearby protected forest area or wildlife sanctuary with duly singed by competent authority.
3. The proposed area is very near to river bed a detail of muck dump should be provided with all the plans of gabion structures and terraces.
|
|
|
42
|
State secretary
|
REPLY
|
Regional Office
|
23/04/2021
|
reply of additional information sought by IRO Kolkata in 13.512 ha Sivok-Rangpo BG Rail Line case
Letter No. 331/L</2M-27/2021 dated 19/04/2021
|
|