Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (Hill Circle)
|
EDS
|
DFO (Kurseong)
|
03/11/2021
|
date of inspection should be 15.03.21 instead of 03.11.21.
|
|
2
|
DFO (Kurseong)
|
REPLY
|
CF (Hill Circle)
|
03/11/2021
|
The proposal has been received by this office electronically on 03.11.2021 from the nodal.
|
|