| Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
|
1
|
Nodal Officer
|
EDS
|
CF (Meerut Circle Meerut)
|
12/06/2015
|
1. In sl no 4 No trees in proposed area then density should be zero not 0.4. Correct it.
2 In sl no. 5 and 7 Give appropriate information.
3. In sl no. 13 CA should be on double the area proposed for diversion that is 0.044 ha. not 0.022 ha. accordingly upload revised CA scheme as well as kml file, Geo-Ref map, Toposheet.
|
|
|
2
|
CF (Meerut Circle Meerut)
|
EDS
|
DFO (Social Forestry Division Meerut)
|
13/06/2015
|
In sl no 4 No trees in proposed area then density should be zero not 0.4. Correct it. 2 In sl no. 5 and 7 Give appropriate information. 3. In sl no. 13 CA should be on double the area proposed for diversion that is 0.044 ha. not 0.022 ha. accordingly upload revised CA scheme as well as kml file, Geo-Ref map, Toposheet.
|
|
|
3
|
DFO (Social Forestry Division Meerut)
|
REPLY
|
CF (Meerut Circle Meerut)
|
07/07/2015
|
Sir,
The objections raised on the mentioned online proposal are here by complied with point with by Letter no. 93/14-1 dt. 7.7.2015-
1. In serial no. 4 of part II of the proposal the density is changed to zero as directed instead of 0.4
2. In serial no. 5 of part II of the proposal the forest block plantation circle has been amended
3. In serial no. 7 of part II of the proposal has been amended with appropriate information.
4. In serial no. 13 of part II of the proposal, the land area for CA has been doubled initial 0.022 ha. to 0.044 ha. and the CA scheme, Kml, Geo Ref. map and Toposheet has been up lode online.
|
|
|
4
|
CF (Meerut Circle Meerut)
|
EDS
|
DFO (Social Forestry Division Meerut)
|
23/07/2015
|
1. In sl no 4 No trees in proposed area then density should be zero not 0.4. Correct it. 2 In sl no. 5 and 7 Give appropriate information. 3. In sl no. 13 CA should be on double the area proposed for diversion that is 0.044 ha. not 0.022 ha. accordingly upload revised CA scheme as well as kml file, Geo-Ref map, Toposheet.
|
|
|
5
|
DFO (Social Forestry Division Meerut)
|
REPLY
|
CF (Meerut Circle Meerut)
|
04/08/2015
|
Reply to cf meerut
|
|
|
6
|
CF (Meerut Circle Meerut)
|
REPLY
|
Nodal Officer
|
06/08/2015
|
Reply to ccf nodal
|
|
|
7
|
Nodal Officer
|
EDS
|
CF (Meerut Circle Meerut)
|
06/08/2015
|
Find the attachment. Do the needful.
|
|
|
8
|
CF (Meerut Circle Meerut)
|
EDS
|
DFO (Social Forestry Division Meerut)
|
07/08/2015
|
Find the attachment. Do the needful.
|
|
|
9
|
DFO (Social Forestry Division Meerut)
|
REPLY
|
CF (Meerut Circle Meerut)
|
23/09/2015
|
Resolve the problem
|
|
|
10
|
CF (Meerut Circle Meerut)
|
REPLY
|
Nodal Officer
|
23/09/2015
|
Resolve the Problem
|
|