| Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
|
1
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
04/09/2020
|
1- Hard copy of proposal has not been submitted to CF office. 2- Copy of layout plan has not been uploaded at additional information of online part I.3- Date of site inspection mentioned in SIR of DFO is different from the date filled at para 15 of online part II.
|
|
|
2
|
DFO (Mussoorie)
|
EDS
|
User Agency (jalnigam.forestmussoorie@gmail.com)
|
05/09/2020
|
The shortcoming has raised by Cf Office that copy of layout plan has not been uploaded at additional information in par I. Please rectify accordingly.
|
|
|
3
|
User Agency (jalnigam.forestmussoorie@gmail.com)
|
REPLY
|
DFO (Mussoorie)
|
08/09/2020
|
The correction have been made as per the instruction received
|
|
|
4
|
DFO (Mussoorie)
|
REPLY
|
CF (Yamuna)
|
10/09/2020
|
Sir, the correction have been made as per the instruction received.
|
|
|
5
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
22/09/2020
|
As per the direction of CCF Garwal, DSS analysis of CA land/ site selected for plantation is required. Hence DFO upload the DSS report of the land where the plantation has been proposed.
|
|
|
6
|
DFO (Mussoorie)
|
REPLY
|
CF (Yamuna)
|
27/10/2020
|
Please find the letter attached.
|
|
|
7
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
06/11/2020
|
Reply provided by DFO is not satisfactory. As google map of site selected for plantation shown in polygon shape has been attached in hard copy of proposal. To ensure the suitability of the site for plantation, DSS report is required. DFO may upload the DSS analysis report of the site selected for plantation.
|
|
|
8
|
DFO (Mussoorie)
|
REPLY
|
CF (Yamuna)
|
21/11/2020
|
Please find the letter attched.
|
|
|
9
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
26/11/2020
|
Instruction of CF Yamuna given on the date 25-11-2020 is as follows. In case of DSS analysis not getting carried out successfully, DFO to ensure upload the site inspection report of the land selected for CA till the technical problem is resolved. Site inspection must be carried out by the forest officer not below the rank of ACF/SDO.
|
|
|
10
|
DFO (Mussoorie)
|
REPLY
|
CF (Yamuna)
|
27/01/2021
|
The correction have been made as per the instruction received.
|
|
|
11
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
02/02/2021
|
As per the letter of FSI dated 23-12-2020 attached herewith, DSS system in FSI portal is working perfectly. Hence, DFO kindly upload online the DSS analysis report of the area selected for plantation .
|
|
|
12
|
DFO (Mussoorie)
|
REPLY
|
CF (Yamuna)
|
24/02/2021
|
please find the letter attached.
|
|
|
13
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
24/02/2021
|
Technical instructions regarding DSS services received from Forest Survey of India have already been forwarded to your official e-mail on 02-02-2021. kindly take the reference to the said and act accordingly.
|
|
|
14
|
DFO (Mussoorie)
|
REPLY
|
CF (Yamuna)
|
19/04/2021
|
Kindly refer to the attached file.
|
|
|
15
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
03/05/2021
|
Layer information of MDF is not given in DSS report uploaded online. Kindly include the information of MDF in DSS report also.
|
|
|
16
|
DFO (Mussoorie)
|
REPLY
|
CF (Yamuna)
|
31/05/2021
|
Please find the attached letter.
|
|
|
17
|
Nodal Officer
|
EDS
|
CF (Yamuna)
|
17/06/2021
|
find the letter attached
|
|
|
18
|
CF (Yamuna)
|
EDS
|
DFO (Mussoorie)
|
18/06/2021
|
find the letter attached
|
|
|
19
|
DFO (Mussoorie)
|
EDS
|
User Agency (jalnigam.forestmussoorie@gmail.com)
|
22/06/2021
|
Find the letter attached.
|
|