Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
CF (Shivalik)
|
EDS
|
DFO (Dehradun)
|
21/02/2022
|
in part 1 point C 3 and 4 the topo map and georeference map is not opening
in part 1 point E 2 there is permanent employment is marked which is usually 0
in part 1 point K A the F.R.A is not opening
in part 1 ADDITIONAL INFORMATION should be uploaded according to the checklist
|
|
2
|
DFO (Dehradun)
|
EDS
|
User Agency (sdomohanpurupcl@gmail.com)
|
22/02/2022
|
n part 1 point C 3 and 4 the topo map and georeference map is not opening in part 1 point E 2 there is permanent employment is marked which is usually 0 in part 1 point K A the F.R.A is not opening in part 1 ADDITIONAL INFORMATION should be uploaded according to the checklist
|
|
3
|
User Agency (sdomohanpurupcl@gmail.com)
|
REPLY
|
DFO (Dehradun)
|
23/02/2022
|
The correction have been made as per the instruction received
|
|
4
|
DFO (Dehradun)
|
REPLY
|
CF (Shivalik)
|
23/02/2022
|
EDS has been sought by the user agency.
|
|
5
|
CF (Shivalik)
|
EDS
|
DFO (Dehradun)
|
25/02/2022
|
in part 1 point C 3 and 4 toposheet and georefenrence there is no signature/validation of required agency
in part 1 point E 2 employment is marked as NO
part 1 point K A f.r.a is not opening
part 1 ADDITIONAL INFORMATION should be uploaded according to the checklist please refer to FP/UK/ROAD/145560/2021 for correct format
|
|
6
|
DFO (Dehradun)
|
EDS
|
User Agency (sdomohanpurupcl@gmail.com)
|
26/02/2022
|
in part 1 point C 3 and 4 toposheet and georeferenced there is no signature/validation of required agency in part 1 point E 2 employment is marked as NO part 1 point K A f.r.a is not opening part 1 ADDITIONAL INFORMATION should be uploaded according to the checklist please refer to FP/UK/ROAD/145560/2021 for correct format
|
|
7
|
User Agency (sdomohanpurupcl@gmail.com)
|
REPLY
|
DFO (Dehradun)
|
27/02/2022
|
The correction have been made as per the instruction received
|
|
8
|
DFO (Dehradun)
|
REPLY
|
CF (Shivalik)
|
28/02/2022
|
The correction have been made as per the instruction received
|
|
9
|
CF (Shivalik)
|
EDS
|
DFO (Dehradun)
|
02/03/2022
|
in part 1 point E 2
permanent employment is marked as 200 which should be 0
in additional information documents uploaded in point 1 and 3 in not opening
|
|
10
|
DFO (Dehradun)
|
EDS
|
User Agency (sdomohanpurupcl@gmail.com)
|
03/03/2022
|
Quarry has been raised by the CF, Shivalik as given bellow
in part 1 point E 2 permanent employment is marked as 200 which should be 0 in additional information documents uploaded in point 1 and 3 in not opening
|
|
11
|
User Agency (sdomohanpurupcl@gmail.com)
|
REPLY
|
DFO (Dehradun)
|
03/03/2022
|
The correction have been made as per the instruction received
|
|
12
|
DFO (Dehradun)
|
REPLY
|
CF (Shivalik)
|
04/03/2022
|
Quarry Sought as per the given instructions
|
|