Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Ariyalur)
|
EDS
|
User Agency (aer2sendurai@gmail.com)
|
23/08/2021
|
The proposed forest land required by TANGEDGO Sendurai on online application for 0.3996 Ha. the actual forest land required by TANGEDGO as per DFO site inspection 0.4168 Ha.
Hence the User Agency i.e the Assistant Engineer, Sendurai is requested to submit the revised proposal for 0.4168 Ha including GPS readings, KML file Geo referenced map, SI sheet map and related to all documents.
|
|
2
|
User Agency (aer2sendurai@gmail.com)
|
REPLY
|
DFO (Ariyalur)
|
01/09/2021
|
The correction have been made as per the instruction received
|
|
3
|
Nodal Officer
|
EDS
|
CF (Trichy)
|
28/10/2021
|
The Circle officer is requested to upload the details vide PCCF ref. No. TS4-13227-2020, dt. 25.10.2021 for further process
|
|
4
|
CF (Trichy)
|
EDS
|
DFO (Ariyalur)
|
02/11/2021
|
The District Forest Officer is requested to rectify the defects pointed out by the Principal Chief Conservator of Forests reference cited
|
|
5
|
DFO (Ariyalur)
|
REPLY
|
CF (Trichy)
|
17/11/2021
|
The diversion is proposed for a project which may arrest low voltage complaints and frequent the power cut problems in 8 No. of rural villages in over exploited blocks of Andimadam Union in Ariyalur District
|
|
6
|
CF (Trichy)
|
REPLY
|
Nodal Officer
|
24/11/2021
|
The defects were rectified and submitted. Hence I recommend the proposal.
|
|