Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
04/11/2020
|
sr attched file
|
|
2
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
09/02/2021
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
12/02/2021
|
eds reply plz
|
|
4
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
18/09/2022
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
28/09/2022
|
land is not acquired in the proposal
|
|
6
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
10/11/2022
|
The correction have been made as per the instruction received
|
|
7
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
17/11/2022
|
Bhumi Aavntn nhi huva h
|
|
8
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
25/01/2023
|
The correction have been made as per the instruction received
|
|
9
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
20/02/2023
|
EDS Reply plz
|
|
10
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
21/02/2023
|
The correction have been made as per the instruction received
|
|
11
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
24/04/2023
|
eds reply plz
|
|
12
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
29/04/2023
|
The correction have been made as per the instruction received
|
|
13
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
04/05/2023
|
Dimarcation not Corrected by user agency.
|
|
14
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
19/05/2023
|
The correction have been made as per the instruction received
|
|
15
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
26/05/2023
|
Kindly send hard copy.
|
|
16
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
27/05/2023
|
eds reply plz
|
|
17
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
14/06/2023
|
Kindly provide information as per attached document.
|
|
18
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
19/06/2023
|
eds reply
|
|
19
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
08/07/2023
|
The correction have been made as per the instruction received
|
|
20
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
19/07/2023
|
eds reply
|
|
21
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
24/07/2023
|
Please upload detailed CA scheme and resend.
|
|
22
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
24/07/2023
|
eds reply sr
|
|
23
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
27/07/2023
|
Kindly Correct CA Scheme detail upload
|
|
24
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
27/07/2023
|
eds reply sr
|
|
25
|
Nodal Officer
|
EDS
|
CF (Kota)
|
23/08/2023
|
Kindly provide information as per attached document
|
|
26
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
24/08/2023
|
Kindly provide information as per attached document
|
|
27
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
28/08/2023
|
eds reply
|
|
28
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
07/09/2023
|
The correction have been made as per the instruction received
|
|
29
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
11/09/2023
|
eds reply plz
|
|
30
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
21/09/2023
|
The correction have been made as per the instruction received
|
|
31
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
11/10/2023
|
eds reply sr
|
|
32
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
17/10/2023
|
Kindly provide information as per attached document
|
|
33
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
03/11/2023
|
eds reply sr
|
|
34
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
08/03/2024
|
The correction have been made as per the instruction received
|
|
35
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
01/04/2024
|
The design and detailed estimate of the underpass is not submitted. Please provide the location details and detailed estimate of the each underpass proposed to be constructed for free movement of the wildlife. Also it is requested to revise the cost of project based upon all the levies imposed by the forest department as per the guidelines issued time to time.
|
|
36
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
24/04/2024
|
The correction have been made as per the instruction received
|
|
37
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
03/05/2024
|
eds reply sr
|
|
38
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
07/05/2024
|
kindly provide information as per attached document
|
|
39
|
Nodal Officer
|
EDS
|
CF (Kota)
|
29/05/2024
|
Kindly provide information as per attached document
|
|
40
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
30/05/2024
|
Kindly provide information as per attached document
|
|
41
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
30/05/2024
|
eds reply sir
|
|
42
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
13/06/2024
|
The correction have been made as per the instruction received
|
|
43
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
21/06/2024
|
eds plz
|
|
44
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
04/07/2024
|
kindly provide information as per attached.
|
|
45
|
Nodal Officer
|
EDS
|
CF (Kota)
|
09/07/2024
|
The proposal has not been recommended by CCF & DCF but the portal is not showing so. Kindly upload your recommendation online.
|
|
46
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
09/07/2024
|
Agree with comments by dcf Baran hence the proposal as not recommended
|
|
47
|
Nodal Officer
|
EDS
|
CF (Kota)
|
10/07/2024
|
The proposal has not been recommended by CCF & DCF but the portal is not showing so. Kindly upload your recommendation online.
|
|
48
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
12/07/2024
|
The proposal may be accepted after imposing penal CA for violation of FCA.
|
|
49
|
Nodal Officer
|
EDS
|
CF (Kota)
|
29/07/2024
|
Kindly provide information as per attached document.
|
|
50
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
31/07/2024
|
send compliance report of observations by Nodal Officers
|
|
51
|
DFO (Baran Territorial)
|
EDS
|
User Agency (pwd_shahabad@rediffmail.com)
|
31/07/2024
|
Eds reply sir
|
|
52
|
User Agency (pwd_shahabad@rediffmail.com)
|
REPLY
|
DFO (Baran Territorial)
|
13/09/2024
|
The correction have been made as per the instruction received
|
|
53
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
26/09/2024
|
A site inspection of the proposed road was conducted by the DCF Baran, which revealed that the road passes through dense forest and is unnecessary, as an alternative route already exists. This was communicated via letter number 5485, dated 03.05.2024. Through his letter 1366, dated 29.05.2024, the Nodal Officer has now requested comments from the CCF regarding the feasibility of this proposal. Therefore, it is kindly requested that the CCF provide comments on the feasibility of the proposed road.
|
|
54
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
26/09/2024
|
POINTWISE REPLY OF LETTER NO 2069 DT 29.07.24 FROM NODAL OFFICER NOT COMPLIED. YET
|
|
55
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
10/10/2024
|
A site inspection of the proposed road was conducted by the DCF Baran, which revealed that the road passes through dense forest and is unnecessary, as an alternative route already exists. This was communicated via letter number 5489, dated 03.05.2024. Through his letter 1366, dated 29.05.2024, the Nodal Officer has now requested comments from the CCF regarding the feasibility of this proposal. As per the inspection report of the Chief conservator of Forest Kota , the road is not recommended. So please forward the proposal to the nodal officer as per your own comments.
|
|
56
|
CF (Kota)
|
EDS
|
DFO (Baran Territorial)
|
14/10/2024
|
POINTWISE REPLY OF LETTER NO 2069 DT 29.07.24 FROM NODAL OFFICER NOT COMPLIED. YET
|
|
57
|
DFO (Baran Territorial)
|
REPLY
|
CF (Kota)
|
14/10/2024
|
I do not recommend the proposal because there is already a route available.
Protected Forest block is Santora and Rajpur- C .
This area is part of Shashabad Conservation Resrve.
Road is NOT RECOMMENDED
|
|
58
|
CF (Kota)
|
REPLY
|
Nodal Officer
|
16/10/2024
|
Agree with comments by dcf Baran hence the proposal as not recommended and provide information all points as per attached documents.
|
|