Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Sirohi Territorial)
|
EDS
|
User Agency (ashishnain1994@gmail.com)
|
29/03/2022
|
NOC From Concerned NHAI/PWD/MoRTH to lay OFC in Right of way of the Road at concerned points.
|
|
2
|
User Agency (ashishnain1994@gmail.com)
|
REPLY
|
DFO (Sirohi Territorial)
|
11/04/2022
|
The correction have been made as per the instruction received
|
|
3
|
CF (Jodhpur)
|
EDS
|
DFO (Sirohi Territorial)
|
05/05/2022
|
shortcoming found in proposal at DCF level 1- Point no 13 in part 2 is incorrect which should be change or delete
|
|
4
|
DFO (Sirohi Territorial)
|
REPLY
|
CF (Jodhpur)
|
10/05/2022
|
Shortcoming of proposal has been updated
|
|
5
|
Nodal Officer
|
EDS
|
CF (Jodhpur)
|
20/05/2022
|
Shortcomings are-
1. DCF has uploaded recommendations instead of CA scheme in part II.
2.Instead of Topo sheet and DGPS map CA DFL, DCf has uploaded the topo sheet and DGPS of land asked for diversion.
3.Recommendtaion has been uploaded in place of land suitability certificate.
4.Gazette notification of land asked for diversion is not uploaded and attached.
5. CA scheme, topo sheet, DGPS, land suitability and CA estimate for planting of 100 plants should be uploaded and attached.
|
|
6
|
CF (Jodhpur)
|
EDS
|
DFO (Sirohi Territorial)
|
20/05/2022
|
Shortcomings are- 1. DCF has uploaded recommendations instead of CA scheme in part II. 2.Instead of Topo sheet and DGPS map CA DFL, DCf has uploaded the topo sheet and DGPS of land asked for diversion. 3.Recommendtaion has been uploaded in place of land suitability certificate. 4.Gazette notification of land asked for diversion is not uploaded and attached. 5. CA scheme, topo sheet, DGPS, land suitability and CA estimate for planting of 100 plants should be uploaded and attached.
|
|
7
|
DFO (Sirohi Territorial)
|
REPLY
|
CF (Jodhpur)
|
25/05/2022
|
Please find the reply of EDS
|
|
8
|
CF (Jodhpur)
|
EDS
|
DFO (Sirohi Territorial)
|
26/05/2022
|
Compliance of EDS point No 1, 2, 3, 4 not done as per direction. Please removed irrelevant documents.
|
|
9
|
DFO (Sirohi Territorial)
|
REPLY
|
CF (Jodhpur)
|
01/06/2022
|
As Per EDS, corrections made in the proposal.
|
|
10
|
CF (Jodhpur)
|
EDS
|
DFO (Sirohi Territorial)
|
07/06/2022
|
Document related to EDS point No 4 still not uploaded
|
|
11
|
DFO (Sirohi Territorial)
|
REPLY
|
CF (Jodhpur)
|
08/06/2022
|
Documents uploaded
|
|
12
|
CF (Jodhpur)
|
REPLY
|
Nodal Officer
|
09/06/2022
|
Compliance of EDS attached
|
|