Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
Nodal Officer
|
EDS
|
CF (Central Forest Circle)
|
05/08/2020
|
1. Verify the location and map in kml and topo-sheet
2. Re-submission of the verified kml file map and Topo-sheet of the said location
|
|
2
|
CF (Central Forest Circle)
|
EDS
|
DFO (Central Forest Division,Imphal)
|
05/08/2020
|
Please Verify the location of proposed site vis a vis actual construction and resubmit
|
|
3
|
DFO (Central Forest Division,Imphal)
|
EDS
|
User Agency (ayushdirector.man@gmail.com)
|
21/08/2020
|
The actual site of construction does not match with the proposed site for obtaining clearance. Please verify
|
|
4
|
User Agency (ayushdirector.man@gmail.com)
|
REPLY
|
DFO (Central Forest Division,Imphal)
|
01/09/2022
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Central Forest Division,Imphal)
|
REPLY
|
CF (Central Forest Circle)
|
21/09/2022
|
necessary correction has been made by the user agency and also revised NPV and revised CA estimates has been submitted by this Office
|
|
6
|
CF (Central Forest Circle)
|
REPLY
|
Nodal Officer
|
20/05/2024
|
The necessary correction has been made and submitted
|
|