Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Khasi Hills)
|
EDS
|
User Agency (neepcoplanning@yahoo.co.in)
|
15/04/2016
|
kindly do the following corrections
1. kindly resub submit Part I after making correction about installed capacity on line
2. Kindly submit GPS map showing forest and non Forest areas
|
|
2
|
User Agency (neepcoplanning@yahoo.co.in)
|
REPLY
|
DFO (Khasi Hills)
|
28/06/2016
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Khasi Hills)
|
EDS
|
User Agency (neepcoplanning@yahoo.co.in)
|
29/09/2016
|
pl submit information as asked for
|
|
4
|
User Agency (neepcoplanning@yahoo.co.in)
|
REPLY
|
DFO (Khasi Hills)
|
30/09/2016
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Khasi Hills)
|
EDS
|
User Agency (neepcoplanning@yahoo.co.in)
|
08/03/2018
|
This office could not provide degraded forest land for raising Compensatory Afforestation,hence you are requested to provide equivalent area of diverted forest land for the said purpose.
|
|
6
|
User Agency (neepcoplanning@yahoo.co.in)
|
REPLY
|
DFO (Khasi Hills)
|
10/06/2021
|
The correction have been made as per the instruction received
|
|
7
|
DFO (Khasi Hills)
|
EDS
|
User Agency (neepcoplanning@yahoo.co.in)
|
02/05/2022
|
Please correct the Form A part-I seriel No L regarding Details of lands identified for CA as you have already identified at Nongumiang
|
|
8
|
User Agency (neepcoplanning@yahoo.co.in)
|
REPLY
|
DFO (Khasi Hills)
|
05/05/2022
|
The correction have been made as per the instruction received
|
|
9
|
DFO (Khasi Hills)
|
EDS
|
User Agency (neepcoplanning@yahoo.co.in)
|
16/05/2022
|
The correction made by you on 05/05/2020 is not sufficient, as this division has to upload the details of CA land in Part II and without the details it cannot be proceed further, kindly take necessary action from your end.
|
|
10
|
User Agency (neepcoplanning@yahoo.co.in)
|
REPLY
|
DFO (Khasi Hills)
|
26/05/2022
|
The correction have been made as per the instruction received
|
|
11
|
DFO (Khasi Hills)
|
EDS
|
User Agency (neepcoplanning@yahoo.co.in)
|
28/06/2022
|
Please upload the correct KML file in a polygon format showing the diverted area of 22 ha.
|
|
12
|
User Agency (neepcoplanning@yahoo.co.in)
|
REPLY
|
DFO (Khasi Hills)
|
02/08/2022
|
The correction have been made as per the instruction received
|
|
13
|
Nodal Officer
|
EDS
|
CF (Khasi&Jaintia Hills)
|
09/09/2022
|
1. User Agency may be requested to resubmit all details of Component-wise breakup, georeferenced map indicating geocoordinates of all vertices of each component, A2-size toposheet indicating area in ha with a clearer picture of the proposed area, and a detailed justification note with supporting documents such as 1. no. of trees saved, maps of alternate sites, i.e. 2. toposheets, 3. georeferenced map, etc.
2. DFO may be requested to resubmit CA estimate as there are discrepancies in the calculations and typographical errors. KML file for CA may also be resubmitted as the area is found to be lesser than what is indicated in form-II, maps and site inspection documents.
|
|
14
|
CF (Khasi&Jaintia Hills)
|
EDS
|
DFO (Khasi Hills)
|
14/10/2022
|
1. User Agency may be requested to resubmit all details of Component-wise breakup, georeferenced map indicating geocoordinates of all vertices of each component, A2-size toposheet indicating area in ha with a clearer picture of the proposed area, and a detailed justification note with supporting documents such as 1. no. of trees saved, maps of alternate sites, i.e. 2. toposheets, 3. georeferenced map, etc. 2. DFO may be requested to resubmit CA estimate as there are discrepancies in the calculations and typographical errors. KML file for CA may also be resubmitted as the area is found to be lesser than what is indicated in form-II, maps and site inspection documents.
|
|
15
|
DFO (Khasi Hills)
|
EDS
|
User Agency (neepcoplanning@yahoo.co.in)
|
17/10/2022
|
Please resubmit the following information as requested by the Conservator of Forest. 1. User Agency may be requested to resubmit all details of Component-wise breakup, georeferenced map indicating geocoordinates of all vertices of each component, A2-size toposheet indicating area in ha with a clearer picture of the proposed area, and a detailed justification note with supporting documents such as 1. no. of trees saved, maps of alternate sites, i.e. 2. toposheets, 3. georeferenced map, etc.
|
|
16
|
User Agency (neepcoplanning@yahoo.co.in)
|
REPLY
|
DFO (Khasi Hills)
|
18/10/2022
|
The correction have been made as per the instruction received
|
|
17
|
DFO (Khasi Hills)
|
REPLY
|
CF (Khasi&Jaintia Hills)
|
14/11/2022
|
The KML File of the CA Land at Nongumiang has been corrected and uploaded. Whereas with regard to the CA Plantation Norms, the same has been re-check and reuploaded.
|
|
18
|
CF (Khasi&Jaintia Hills)
|
REPLY
|
Nodal Officer
|
20/01/2023
|
The KML File of the CA Land at Nongumiang has been corrected and uploaded. Whereas with regard to the CA Plantation Norms, the same has been re-check and reuploaded.
|
|
19
|
Regional Office
|
EDS
|
State secretary
|
27/07/2023
|
The State Govt. is requested to provide following additional information for further processing of the case: -
1) Component wise break-up of all the details and their location along with the land requirement may be submitted.
2) The number of trees at FRL:-4 being Nil may be clarified.
3) As per CAT Plan 42.24 % of the Catchment area is barren land. Whether the State Govt has any
plan to rehabilitate the same considering potential adverse impact on the life of the project.
4) The Cumulative Impact study, if any has been carried out. If yes the same may be furnished.
5) The compensatory afforestation scheme is to be technically approved by the Competent Authority.
6) Current status of Environmental Clearance.
7) The details of muck generated and to be disposed, whether on forest or
|
|
20
|
Nodal Officer
|
EDS
|
|
17/03/2025
|
Please furnish the additional information sought by the IRO.
|
|