Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
Nodal Officer
|
EDS
|
CF (Central circle, Thrissur)
|
02/12/2021
|
Verify the area required for diversion and resubmit after corrections if found necessary
|
|
2
|
Nodal Officer
|
EDS
|
CF (Social Forestry Central Region, Ernakulam)
|
02/12/2021
|
Verify the area required for diversion and resubmit after corrections if found necessary
|
|
3
|
CF (Social Forestry Central Region, Ernakulam)
|
EDS
|
DFO (Nature Study Centre, Kalady)
|
02/12/2021
|
Verify the area required for diversion and resubmit after corrections if found necessary 02/12/2021 Nodal Officer
|
|
4
|
CF (Central circle, Thrissur)
|
EDS
|
DFO (Malayattoor)
|
02/12/2021
|
Verify the area required for diversion and resubmit after corrections if found necessary.
|
|
5
|
DFO (Malayattoor)
|
REPLY
|
CF (Central circle, Thrissur)
|
03/12/2021
|
submitting the corrected required area
|
|
6
|
DFO (Nature Study Centre, Kalady)
|
REPLY
|
CF (Social Forestry Central Region, Ernakulam)
|
08/12/2021
|
As per the report submitted by the Range Forest Officer, Research Range kodanad the total length of the pipe line will be 3913m and the forest area required is 0.313040 Ha under this divsion.
|
|
7
|
CF (Central circle, Thrissur)
|
EDS
|
DFO (Malayattoor)
|
15/12/2021
|
Please update the recommendation and site inspection reports. Also correct the area recommended for diversion as per actual area required for diversion
|
|
8
|
CF (Social Forestry Central Region, Ernakulam)
|
EDS
|
DFO (Nature Study Centre, Kalady)
|
15/12/2021
|
The recommendation and site inspection report needs to be corrected. Also correct the area recommended for diversion as per actual requirement.
|
|
9
|
DFO (Malayattoor)
|
REPLY
|
CF (Central circle, Thrissur)
|
17/12/2021
|
Sight inspection report and recommendation
|
|
10
|
DFO (Nature Study Centre, Kalady)
|
REPLY
|
CF (Social Forestry Central Region, Ernakulam)
|
20/12/2021
|
Site Inspection Report
|
|
11
|
CF (Central circle, Thrissur)
|
EDS
|
DFO (Malayattoor)
|
10/01/2022
|
please upload Recommendation report
|
|
12
|
DFO (Malayattoor)
|
REPLY
|
CF (Central circle, Thrissur)
|
25/06/2022
|
we may shortly add recommendation letter
|
|
13
|
CF (Central circle, Thrissur)
|
EDS
|
DFO (Malayattoor)
|
25/06/2022
|
Upload corrected recommendation report
|
|
14
|
DFO (Malayattoor)
|
REPLY
|
CF (Central circle, Thrissur)
|
25/06/2022
|
recommendation letter is uploaded
|
|
15
|
CF (Central circle, Thrissur)
|
REPLY
|
Nodal Officer
|
25/06/2022
|
The recommendation letter from DFO and from this office are uploaded
|
|
16
|
CF (Social Forestry Central Region, Ernakulam)
|
REPLY
|
Nodal Officer
|
27/06/2022
|
0.313040 Ha diversion is necessary for the implementation of the above project. Site Inspection Report enclosed herewith.
|
|