Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
05/08/2020
|
Forest Land to be diverted could not be assessed during the field inspection as the proposed project alignment is not marked on the land to assess the extent of land required for the project
|
|
2
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
20/08/2020
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
05/12/2020
|
You have appllied 25 505 ha of various sy no in Tirumalapura Guddadaneralakere Mallagondanahalli and Ittigehalli villages in Hosadurga Range But actual area is 59 772 Ha of above villages is recorded as Marikanive Reserve Forest Therefore as per Forest Conservarion Act 1980 the renewal proposal which passes through the above mentioned Sy Nos area need to take prior approval as Forest Conservation Act 1980
|
|
4
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
05/01/2021
|
The correction have been made as per the instruction received
|
|
5
|
CF (Bellary)
|
EDS
|
DFO (Chitradurga)
|
08/09/2021
|
You are directed to rectify the shortcomings or discrepancies as noticed and submit the required information as per the attached letter.
|
|
6
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
17/09/2021
|
No demarcation was done in the area of Wind Fan Flat form. As per the Chapter 8 of hand book of FC guidelines, the area between the each wind mill should also be taken into account for diversion as corridor between successive wind mills which is not incorporated in the present proposal. The user agency to include this area with proper demarcation on the ground and etc
|
|
7
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
23/10/2021
|
The correction have been made as per the instruction received
|
|
8
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
08/03/2022
|
The Range Forest officer Chitradurga and Hiriyur Range have visited the above project site and inspected with reference to the documents and submitted report vide ref 4 and 5 The following observations were made during the site inspection
No demarcation was done for the electric transmission lines in above site
No demarcation was done at Vacuum Circuit Breakers VCB sites
|
|
9
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
25/03/2022
|
The correction have been made as per the instruction received
|
|
10
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
07/05/2022
|
But however you have not submitted the compliance report vide this office letter dated 08 03 2022 The following observations were made during the site inspection
No demarcation was done for the electric transmission lines in above site
No demarcation was done at Vacuum Circuit Breakers VCB sites
It is a long pending issue which has to be treated as urgent Hence the user agency has to submit compliance report for the site inspection memo with necessary justification within 15 days as sought by the Chief Conservator of forests Ballari Circle Ballari Otherwise under signed will recommended to the higher authorities for closure of file
|
|
11
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
06/08/2022
|
The correction have been made as per the instruction received
|
|
12
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
12/08/2022
|
As per UA request
|
|
13
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
15/08/2022
|
The correction have been made as per the instruction received
|
|
14
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
16/11/2022
|
As per UA request
|
|
15
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
03/12/2022
|
The correction have been made as per the instruction received
|
|
16
|
DFO (Chitradurga)
|
EDS
|
User Agency (windwindialtd@gmail.com)
|
29/12/2022
|
As per UA request
|
|
17
|
User Agency (windwindialtd@gmail.com)
|
REPLY
|
DFO (Chitradurga)
|
29/12/2022
|
The correction have been made as per the instruction received
|
|
18
|
DFO (Chitradurga)
|
REPLY
|
CF (Bellary)
|
30/12/2022
|
This revelation has surfaced because of high accuracy DGPS survey, which was not there at the time of FC approval in year 2003. The renewal proposal and diversion of 221.80 ha may be recommended subject to imposing suitable penalty/PCA for the violation of Forest (Conservation) Act, 1980
|
|
19
|
State secretary
|
EDS
|
Nodal Officer
|
14/03/2023
|
eds
|
|
20
|
Nodal Officer
|
EDS
|
CF (Bellary)
|
18/03/2023
|
please submit the information sought by GOI
|
|
21
|
CF (Bellary)
|
EDS
|
DFO (Chitradurga)
|
28/03/2023
|
Submit information
|
|
22
|
DFO (Chitradurga)
|
REPLY
|
CF (Bellary)
|
21/06/2023
|
the undersigned verified the documents with reference to the proposal the compliance executed by the user agency with reference to the conditions stipulated by the Government of India vide letter dated 02 04 2003 and 28 07 2004
Under the above circumstances and agreeing with recommendation the compliance executed by the user agency with reference to the conditions stipulated by Government of India vide letter dated 02 04 2003 and 28 07 2004
|
|
23
|
CF (Bellary)
|
REPLY
|
Nodal Officer
|
28/06/2023
|
Information submitted as sought by the GOI
|
|
24
|
Nodal Officer
|
REPLY
|
State secretary
|
12/01/2024
|
The reply is hereby submitted for your kind information and further needful action
|
|