Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Koppa)
|
EDS
|
User Agency (babu.veerabhadre@ril.com)
|
02/12/2022
|
As per the field inspection reports of the RFO, Kalasa Range and ACF, Balehonnur Sub Division there is a difference between extent proposed by UA and actual extent identified in the field.
|
|
2
|
User Agency (babu.veerabhadre@ril.com)
|
REPLY
|
DFO (Koppa)
|
19/12/2022
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Koppa)
|
EDS
|
User Agency (babu.veerabhadre@ril.com)
|
20/12/2022
|
EDS not fulfilled
|
|
4
|
User Agency (babu.veerabhadre@ril.com)
|
REPLY
|
DFO (Koppa)
|
10/04/2023
|
The correction have been made as per the instruction received
|
|
5
|
DFO (Koppa)
|
EDS
|
User Agency (babu.veerabhadre@ril.com)
|
20/02/2024
|
Make necessary corrections in Proposed Jio fibre installation site as per this office latter dated 02-12-2023
|
|
6
|
User Agency (babu.veerabhadre@ril.com)
|
REPLY
|
DFO (Koppa)
|
22/08/2024
|
The correction have been made as per the instruction received
|
|
7
|
Nodal Officer
|
EDS
|
CF (Chikkamagalur)
|
13/02/2025
|
directed to clarify whether the proposed OFCs is being laid in the existing RoW of the diverted road or otherwise. If the existing RoW of the road is diverted, then submit the details of FC diversion through FC web portal to this office for further action.
|
|
8
|
CF (Chikkamagalur)
|
EDS
|
DFO (Koppa)
|
14/02/2025
|
EDS FROM NODAL OFFICER
directed to clarify whether the proposed OFCs is being laid in the existing RoW of the diverted road or otherwise. If the existing RoW of the road is diverted, then submit the details of FC diversion through FC web portal to this office for further action.
|
|
9
|
DFO (Koppa)
|
REPLY
|
CF (Chikkamagalur)
|
19/03/2025
|
The matter is examined and it is seen that the road is in existence even before the enactment of Forest Conservation Act, 1980 as the Toposheet clearly indicates the existence of road. There are no records to state the existing road is diverted earlier. The proposed diversion of 0.1232 Ha area for laying Jio Digital Fiber Underground Cable is passing through existing Row of the Road.
|
|
10
|
CF (Chikkamagalur)
|
REPLY
|
Nodal Officer
|
25/04/2025
|
EDS reply submitted by DCF, Koppa is submitted for your further needful action.
|
|