Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Chitradurga)
|
EDS
|
User Agency (jayavel.g@vedanta.co.in)
|
01/09/2018
|
1. Length of the proposed Project in forest land is 6800 Mtrs and Width is 15 Mtrs for 6300 Mtrs Length.
Width of proposed project in Tanigehalli Sy. No. 35 is 36 Mtrs and the length is 500 Mtrs.
2. The project has not indicated any provisions for service/approach road to the Conveyor Pipe line.
3. The proposed line starts at an elevation of 800 Mtrs MSL and the end point is almost at the same elevation.
|
|
2
|
User Agency (jayavel.g@vedanta.co.in)
|
REPLY
|
DFO (Chitradurga)
|
15/09/2018
|
The correction have been made as per the instruction received
|
|
3
|
CF (Bellary)
|
EDS
|
DFO (Chitradurga)
|
09/10/2018
|
Due to non receipt of essential details from the DCF Chitradurga, the online proposal has been returned.
|
|
4
|
DFO (Chitradurga)
|
REPLY
|
CF (Bellary)
|
11/10/2018
|
All essential details were uploaded on 01.10.2018 hard copies submitted to CCf Ballari on 09.10.2018
|
|
5
|
Head Office
|
EDS
|
State secretary
|
02/07/2019
|
EDS
|
|
6
|
State secretary
|
REPLY
|
Head Office
|
14/10/2019
|
clarification issued pls do the needful
|
|