Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
21/09/2021
|
joint inspection letter
|
|
2
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
25/09/2021
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
15/12/2021
|
clarify the eds raised
|
|
4
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
17/01/2022
|
The correction have been made as per the instruction received
|
|
5
|
CF (Srinagar Circle)
|
EDS
|
DFO (Tangmarg Forest Division)
|
19/01/2022
|
EDS
Part 1.
1. KML file of the proposed site has not been uploaded by the User Agency.
2. Layout plan not uploaded by the User Agency.
3. Component wise break up of forest land to be diverted not given by the User Agency at B 2.4 - Part I.
Part 2
1. No trees involved under proposed diversion. However, crop density has been shown 0.7, which needs to be clarified by the DFO.
2. DFO has reported violation, but Undertaking from User Agency to pay penal NPV as worked out by the DFO has not been uploaded.
3. New rates of NPV has been incorporated in the proposal. However, in the CA plan, old rate of NPV has been shown. Necessary correction in CA plan to be done.
|
|
6
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
20/01/2022
|
KML file of the proposed site has not been uploaded. 2. Layout plan not uploaded. 3. Component wise break up of forest land to be diverted not given.
|
|
7
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
28/05/2022
|
The correction have been made as per the instruction received
|
|
8
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
28/05/2022
|
KML file of the proposed site has not been uploaded. 2. Layout plan not uploaded. 3. Component wise break up of forest land to be diverted not given.
|
|
9
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
06/06/2022
|
The correction have been made as per the instruction received
|
|
10
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
06/06/2022
|
upload the correct kml file
|
|
11
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
06/06/2022
|
The correction have been made as per the instruction received
|
|
12
|
DFO (Tangmarg Forest Division)
|
REPLY
|
CF (Srinagar Circle)
|
09/06/2022
|
All the observations below raised through EDS have been cleared.........
EDS Part 1. 1. KML file of the proposed site has not been uploaded by the User Agency. 2. Layout plan not uploaded by the User Agency. 3. Component wise break up of forest land to be diverted not given by the User Agency at B 2.4 - Part I. Part 2 1. No trees involved under proposed diversion. However, crop density has been shown 0.7, which needs to be clarified by the DFO. 2. DFO has reported violation, but Undertaking from User Agency to pay penal NPV as worked out by the DFO has not been uploaded. 3. New rates of NPV has been incorporated in the proposal. However, in the CA plan, old rate of NPV has been shown. Necessary correction in CA plan to be done.
|
|
13
|
CF (Srinagar Circle)
|
EDS
|
DFO (Tangmarg Forest Division)
|
10/06/2022
|
The above proposal is returned to DFO Special Forest Division Tangmarg for uploading following documents:
1. DPR of the project
2. As per instructions of the Nodal Officer, FCA issued vide his No. PCCF/FCA/3297/1127-29 Dated 18-05-2022, SOI toposheet & Geo-referenced map need to be authenticated by the UA.
3. Specific recommendations to be uploaded as per prescribed format as given in clause 6 of Forest Conservation (Rules) ,2003- Appendix Part-II
4. As per component wise breakup given by the UA in form- A B2 4, about 10 structures / works have been mentioned with area involved under each work/structure, but similar details have not been given in layout plan and Joint inspection report by the DFO/UA. The entire area in the proposed premises including intervening spot patches, shall be
|
|
14
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
17/06/2022
|
Upload the DPR Project, and authenticated the TOPOsheet & Geo-reference Map
|
|
15
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
22/06/2022
|
The correction have been made as per the instruction received
|
|
16
|
DFO (Tangmarg Forest Division)
|
REPLY
|
CF (Srinagar Circle)
|
09/07/2022
|
EDs raised have been cleared. However, specific recommendation as per new format has not been uploaded as site does not accept it and it can be done at nodal officer level confirmed from nodal office.pdf copy of specific recommendation uploaded here in Eds to forward it to Nodal office for needful
|
|
17
|
Nodal Officer
|
EDS
|
CF (Srinagar Circle)
|
19/07/2022
|
Please upload the requisite documents
|
|
18
|
CF (Srinagar Circle)
|
EDS
|
DFO (Tangmarg Forest Division)
|
19/07/2022
|
Please upload requisite documents
|
|
19
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
25/07/2022
|
Please upload requisite documents
|
|
20
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
26/07/2022
|
The correction have been made as per the instruction received
|
|
21
|
DFO (Tangmarg Forest Division)
|
REPLY
|
CF (Srinagar Circle)
|
26/07/2022
|
The EDS raised by Nodal Officer FCA has been cleared. However, the EDS No. 04 specific recommendation of DFO has been uploaded additional document as the Parvish site does not show the proposal at recommendation bar due to earlier recommendation document uploaded. Further ,confirmed from Nodal office now the specific recommendation as per format part-ii can be uploaded at nodal office level only. Proposal submitted for needful action.
|
|
22
|
CF (Srinagar Circle)
|
REPLY
|
Nodal Officer
|
27/07/2022
|
Resubmitted for approval after clearance of observations.
|
|
23
|
State secretary
|
EDS
|
Nodal Officer
|
24/08/2022
|
EDS
|
|
24
|
Nodal Officer
|
EDS
|
CF (Srinagar Circle)
|
25/08/2022
|
Kindly upload the requisite information please.
|
|
25
|
CF (Srinagar Circle)
|
EDS
|
DFO (Tangmarg Forest Division)
|
26/08/2022
|
Forwarded to DFO Special Forest Division, Tangmarg with the directions to address the EDS at S.No. ii & iii.In respect of EDS at S.No. i , a revised approval of CA Plan for an amount of Rs 6,76,335/ has been issued. The same may be uploaded in supersession of the previous approval.
|
|
26
|
DFO (Tangmarg Forest Division)
|
EDS
|
User Agency (phesdtangmarg@gmail.com)
|
31/08/2022
|
upload geo reference map
|
|
27
|
User Agency (phesdtangmarg@gmail.com)
|
REPLY
|
DFO (Tangmarg Forest Division)
|
31/08/2022
|
The correction have been made as per the instruction received
|
|
28
|
DFO (Tangmarg Forest Division)
|
REPLY
|
CF (Srinagar Circle)
|
31/08/2022
|
Observations raised has been cleared and necessary maps has been uploaded
|
|
29
|
CF (Srinagar Circle)
|
REPLY
|
Nodal Officer
|
02/09/2022
|
In response to Point No. 1 of EDS dated 25-08-2022, a revised CA approval for an amount of Rs 6,76,335/- has been issued vide No. 725-27 dated 26-08-2022 and uploaded by the DFO on the Portal. Regarding Point No. ii revised SOI toposheet showing exact location of CA scheme has been uploaded. III, Revised satellite map showing Geo-coordinates has also been uploaded, as desired.
|
|
30
|
Nodal Officer
|
REPLY
|
State secretary
|
10/09/2022
|
The requisite documents have been uploaded
|
|