Sno. | From | Status | To | EDS Date | EDS sought/Replied | EDS Letter |
1
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
28/11/2020
|
this for information and further necessary action
|
|
2
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
20/03/2021
|
The correction have been made as per the instruction received
|
|
3
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
04/06/2021
|
eds
|
|
4
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
04/06/2021
|
The correction have been made as per the instruction received
|
|
5
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
07/06/2021
|
Shortcomings noticed as per attachment. Please attend the same at the earliest possible.
|
|
6
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
11/06/2021
|
The case sent for information and necessary action please.
|
|
7
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
19/04/2022
|
The correction have been made as per the instruction received
|
|
8
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
09/05/2022
|
The correction have been made as per the instruction received
|
|
9
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
10/05/2022
|
as per attachment
|
|
10
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
10/05/2022
|
The correction have been made as per the instruction received
|
|
11
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
28/05/2022
|
EDS
|
|
12
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
28/05/2022
|
EDS as per attachment
|
|
13
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
03/06/2022
|
EDS as per attachment
|
|
14
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
18/10/2022
|
The correction have been made as per the instruction received
|
|
15
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
04/11/2022
|
Original copy of reply not received in this office.
|
|
16
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
01/02/2023
|
The correction have been made as per the instruction received
|
|
17
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
29/03/2023
|
The correction have been made as per the instruction received
|
|
18
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
01/04/2023
|
Point No. 1 has not found attended .
related document of Point no.12 does not open and Point no. 7 certificate not found in additional information
|
|
19
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
01/04/2023
|
Point No. 1 cost of project as mentioned as 18-98 crore and online mention 18.98 lakh and Poit No. 12 related document does not open.
|
|
20
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
03/04/2023
|
The correction have been made as per the instruction received
|
|
21
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
03/04/2023
|
The correction have been made as per the instruction received
|
|
22
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
04/04/2023
|
Reply given as per attachment
|
|
23
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
04/05/2023
|
EDS
|
|
24
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
04/05/2023
|
EDS
|
|
25
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
10/05/2023
|
EDS
|
|
26
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
16/08/2023
|
The correction have been made as per the instruction received
|
|
27
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
24/08/2023
|
The correction have been made as per the instruction received
|
|
28
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
25/08/2023
|
The correction have been made as per the instruction received
|
|
29
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
25/08/2023
|
The correction have been made as per the instruction received
|
|
30
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
31/08/2023
|
Reply given as per attachment
|
|
31
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
11/09/2023
|
1. The alternative sites, Private land and all components has still not been marked in different colour in KML file.
2. CA scheme has still not been prepared on current wages rate i.e. 2023-24.
3. Reclamation Plan be prepared on current wages rate.
|
|
32
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
12/09/2023
|
. The alternative sites, Private land and all components has still not been marked in different colour in KML file. 2. CA scheme has still not been prepared on current wages rate i.e. 2023-24. 3. Reclamation Plan be prepared on current wages rate
|
|
33
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
15/09/2023
|
The alternative sites, Private land and all components has still not been marked in different colour in KML file.
|
|
34
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
22/09/2023
|
The correction have been made as per the instruction received
|
|
35
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
25/09/2023
|
The correction have been made as per the instruction received
|
|
36
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
29/09/2023
|
Necessary correction has been done now as per instruction received.
|
|
37
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
16/10/2023
|
EDS
|
|
38
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
17/10/2023
|
EDS
|
|
39
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
18/10/2023
|
EDS
|
|
40
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
23/01/2024
|
The correction have been made as per the instruction received
|
|
41
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
16/03/2024
|
The correction have been made as per the instruction received
|
|
42
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
28/03/2024
|
Reply given as per attached
|
|
43
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
22/04/2024
|
The following observations has still not been attended
1. The power is to be evacuated through the 22 KV line of HPSEB but the consent of the HPSEB has not been found uploaded online.
2. Area wise legal status of the of forest land be mentioned in online Part-II.
3. The point No. 4 has not been attended in complete.
|
|
44
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
24/04/2024
|
The following observations has still not been attended 1. The power is to be evacuated through the 22 KV line of HPSEB but the consent of the HPSEB has not been found uploaded online. 2. Area wise legal status of the of forest land be mentioned in online Part-II. 3. The point No. 4 has not been attended in complete.
|
|
45
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
26/04/2024
|
The following observations has still not been attended 1. The power is to be evacuated through the 22 KV line of HPSEB but the consent of the HPSEB has not been found uploaded online. 2. Area wise legal status of the of forest land be mentioned in online Part-II. 3. The point No. 4 has not been attended in complete.
|
|
46
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
10/05/2024
|
The correction have been made as per the instruction received
|
|
47
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
04/06/2024
|
The correction have been made as per the instruction received
|
|
48
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
04/06/2024
|
Necessary correction has been made as per the instruction received.
|
|
49
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
04/07/2024
|
1. As per the letter of Chief Engineer S&OP the power will be evacuated in 33 KV line upto Sub Station, whereas, the detail mentioned in check list of 31, 18 meter Row is proposed which is not as per the guidelines as 15 meter RoW can be proposed for 33 KV T/line. Further, the legal status of proposed area has still not been bifurcated in part-II. Secondly, the point No. 4 has still not been attended properly, the KML file showing the detail / T/line and power capacity of proposed / commissioned project still not been provided.
|
|
50
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
04/07/2024
|
. As per the letter of Chief Engineer S&OP the power will be evacuated in 33 KV line upto Sub Station, whereas, the detail mentioned in check list of 31, 18 meter Row is proposed which is not as per the guidelines as 15 meter RoW can be proposed for 33 KV T/line. Further, the legal status of proposed area has still not been bifurcated in part-II. Secondly, the point No. 4 has still not been attended properly, the KML file showing the detail / T/line and power capacity of proposed / commissioned project still not been provided.
|
|
51
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
09/07/2024
|
As per the letter of Chief Engineer S&OP the power will be evacuated in 33 KV line upto Sub Station, whereas, the detail mentioned in check list of 31, 18 meter Row is proposed which is not as per the guidelines as 15 meter RoW can be proposed for 33 KV T/line. Further, the legal status of proposed area has still not been bifurcated in part-II. Secondly, the point No. 4 has still not been attended properly, the KML file showing the detail / T/line and power capacity of proposed / commissioned project still not been provided.
|
|
52
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
13/07/2024
|
The correction have been made as per the instruction received
|
|
53
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
20/07/2024
|
The correction have been made as per the instruction received
|
|
54
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
20/07/2024
|
The correction have been made as per the instruction received
|
|
55
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
02/08/2024
|
EDS
|
|
56
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
02/08/2024
|
EDS
|
|
57
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
16/08/2024
|
EDS
|
|
58
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
29/08/2024
|
The correction have been made as per the instruction received
|
|
59
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
02/09/2024
|
The correction have been made as per the instruction received
|
|
60
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
03/09/2024
|
Observation no. 1 is not found attended and documents are not downloading.
|
|
61
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
03/09/2024
|
Observation no. 1 is not found attended and documents are not downloading.
|
|
62
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
03/09/2024
|
The correction have been made as per the instruction received
|
|
63
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
03/09/2024
|
The correction have been made as per the instruction received
|
|
64
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
10/10/2024
|
The reply is given as per attachment
|
|
65
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
24/10/2024
|
The reply submitted on 10th October, 2024 is still found incomplete furthermore, it has been observed that the information/ documents as asked in EDS dated 16th October 2023 is missing from the portal. The proposal may be scrutinized in view of EDS dated 16th October 2023. The old/ irrelevant documents may be removed from the portal .
|
|
66
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
26/10/2024
|
The reply submitted on 10th October, 2024 is still found incomplete furthermore, it has been observed that the information/ documents as asked in EDS dated 16th October 2023 is missing from the portal. The proposal may be scrutinized in view of EDS dated 16th October 2023. The old/ irrelevant documents may be removed from the portal
|
|
67
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
16/11/2024
|
As per DES
|
|
68
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
03/12/2024
|
The correction have been made as per the instruction received
|
|
69
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
05/12/2024
|
The correction have been made as per the instruction received
|
|
70
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
09/12/2024
|
The correction has been made as per the instruction received
|
|
71
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
01/01/2025
|
EDS
|
|
72
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
02/01/2025
|
EDS
|
|
73
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
03/01/2025
|
EDS
|
|
74
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
24/01/2025
|
The correction have been made as per the instruction received
|
|
75
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
13/02/2025
|
Point No. 4 and 5 is not found attended and document are not uploaded in Part-I
|
|
76
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
18/02/2025
|
The correction have been made as per the instruction received
|
|
77
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
21/02/2025
|
The correction have been made as per the instruction received
|
|
78
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
15/03/2025
|
Reply given as per attachment.
|
|
79
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
26/03/2025
|
In response to point No. 1 Voltage of Tr.line has not been given instead of this capacity of the project may be reviewed. Further unsigned copy of Hydrology has been uploaded, detail comments of user agency regarding Approved capacity in terms of hydroelectricity generation duly signed documents may be provided.
|
|
80
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
26/03/2025
|
In response to point No. 1 Voltage of Tr.line has not been given instead of this capacity of the project may be reviewed. Further unsigned copy of Hydrology has been uploaded, detail comments of user agency regarding Approved capacity in terms of hydroelectricity generation duly signed documents may be provided.
|
|
81
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
27/03/2025
|
In response to point No. 1 Voltage of Tr.line has not been given instead of this capacity of the project may be reviewed. Further unsigned copy of Hydrology has been uploaded, detail comments of user agency regarding Approved capacity in terms of hydroelectricity generation duly signed documents may be provided.
|
|
82
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
19/04/2025
|
The correction have been made as per the instruction received
|
|
83
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
24/04/2025
|
In response to point No. 1 Voltage of Tr.line has not been given instead of this capacity of the project may be reviewed. Further unsigned copy of Hydrology has been uploaded, detail comments of user agency regarding Approved capacity in terms of hydroelectricity generation duly signed documents may be provided.
|
|
84
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
03/06/2025
|
The correction have been made as per the instruction received
|
|
85
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
10/06/2025
|
The correction have been made as per the instruction received
|
|
86
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
16/06/2025
|
The correction have been made as per the instruction received
|
|
87
|
Nodal Officer
|
EDS
|
CF (Shimla)
|
20/06/2025
|
The documents regarding length and width of Transmission line is not downloadable format please re-upload the same.
|
|
88
|
CF (Shimla)
|
EDS
|
DFO (Chopal)
|
21/06/2025
|
The documents regarding length and width of Transmission line is not downloadable format please re-upload the same.
|
|
89
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
23/06/2025
|
The documents regarding length and width of Transmission line is not downloadable format please re-upload the same.
|
|
90
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
30/06/2025
|
The correction have been made as per the instruction received
|
|
91
|
DFO (Chopal)
|
EDS
|
User Agency (ankaushal888@gmail.com)
|
01/07/2025
|
The documents regarding length and width of Transmission line is not downloadable format please re-upload the same.
|
|
92
|
User Agency (ankaushal888@gmail.com)
|
REPLY
|
DFO (Chopal)
|
01/07/2025
|
The correction have been made as per the instruction received
|
|
93
|
DFO (Chopal)
|
REPLY
|
CF (Shimla)
|
03/07/2025
|
The correction have been made as per the instruction received
|
|
94
|
CF (Shimla)
|
REPLY
|
Nodal Officer
|
07/07/2025
|
The documents regarding length and width of Transmission line have been re-submitted Now & it is downloadable now.
|
|