Wild Life Report
Form for seeking recommendation of Standing Committee of NBWL/SBWL.
PART - I & II
(To be filled up by User Agency)
A.
General Details
A-1.
Project Details
(i). Forest Clearance Required?:
No
(ii). Proposal No. :
FP/UK/HYD/6201/2022
(iii). Name of Project:
JIMBAGAD SMALL HYDRO PROJECT (3X4 MW)
(iv). Short narrative of the Project :
IT IS A RUN OFF RIVER SCHEME. ANUUAL ENERGY GENERATION FROM THE PROJECT IS 62.32 M.U. PROJECT IS LOCATED ON JIMBA STREAM A TRIBUTARY OF RIVER GORIGANGA.
(v). State :
Uttarakhand
(vi). Category of the Project :
Hydel
(vii). Shape of project land :
Non Linear
(viii). Distance of the project from the boundary of the Protected Area (in km.):
4.6
(ix). Estimated cost of the Project(Rupees in lacs) :
2152.97
(x). Total period for which clearance is required (in year):
35
(xi). Total Project Area(in ha.):
8.5
(xii). Project Area under Protected Area (in ha.):
3.706
(xiii). Project Area under Non-Protected Area (in ha.):
4.794
(xviii). Project Area inside Wildlife Sanctuaries(in ha.):
0
(xiv). Project Area outside Wildlife Sanctuaries(in ha.):
0
(xv). Project Area inside Conservation Reserve(in ha.):
0
(xvi). Project Area outside Conservation Reserve(in ha.):
0
(xvii). Project Area inside National Park(in ha.):
0
(xviii). Project Area outside National Park(in ha.):
0
(xix). Project Area inside Ecologically Sensitive Zone(in ha.):
3.706
(xx). Project Area outside Ecologically Sensitive Zone(in ha.):
4.794
A-2.
Details of User Agency
(i). Name :
UJVN LTD
(ii). Address1 :
OFFICE OF EXECUTIVE ENGINEER (CIVIL), UJVN LTD.,TAMADHAR, NANASEM, MUNSYARI.
(iii). Address2 :
NIL
(iv). State :
Uttarakhand
(v). District :
Pithoragarh
(vi). Pin :
262501
(vii). Landmark :
NIL
(viii). Email address :
suringad2@gmail.com
(ix). Landline Telephone No. :
222073
(x). Fax No. :
222073
(xi). Mobile No. :
9456590210
(xii). Website (if any) :
NIL
(xiii). Legal status of User Agency :
State PSU
A-3.
Details of Person Making Application
(i). First Name:
RISHI
(ii). Middle Name:
NIL
(iii). Last Name:
SINGH
(iv). Gender:
Male
(v). Designation:
EXECUTIVE ENGINEER (CIVIL)
(vi). Address 1:
TAMADHAR, NANASEM, MUNSYARI.
(vii). Address 2:
NIL
(viii). State:
Uttarakhand
(ix). District:
Pithoragarh
(x). Pin:
262501
(xi). Landmark:
NIL
(xii). Email Address:
get2rishi@gmail.com
(xiii). Landline Telephone No.:
222073
(xiv). Fax No.:
05961222073
(xv). Mobile No.:
9456590210
(xvi). Upload a copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency:
Annexure copy of documents in support of the competence
B.
Details of Land required for the Project
B-1.
Details of Protected Area
B-1.1
No. of Divisions involved in Protected Area
Division wise details of land
S.no
Division Name
Protected Area Name
Project Area under Protected Area
1.
Pithoragarh
ECO-SENSITIVE ZONE AROUND ASKOT WILDLIFE SANCTUARY
3.706
B-1.2
Details of Districts involved
District wise breakup
S.no
District Name
Project Area under Protected Area(ha.)
Project Area under Non-Protected Area(ha.)
1.
Pithoragarh
3.706
4.794
B-1.3
Component wise breakup
Component wise breakup
S.no
Component
Project Area under Protected Area(ha.)
Project Area under Non-Protected Area(ha.)
1
Head works, Intake and protection works
0.037
0.765
2
Intake Channel
0
0.051
3
Desilting Tank
0.049
0.171
4
Tunnel and Adits
1
0.3
5
Surge Shaft
0
0.04
6
Penstock and associated structures
0
0.394
7
Power House, Switchyard and TRC
0
0.61
8
Muck Dumping Sites
1.02
0.563
9
Approach Roads
1.6
1.4
10
Project Camp and Buildings
0
0.5
C.
Maps of protected area
Division 1. : Pithoragarh
(i). Project Area under Protected Area (in ha.) :
3.706
(ii). Nature of the Project :
Non Linear
(a). No. of patches :
One
Patch wise details
Patch No.
Area of Patch(in ha.)
Kml File of Patches
1.
3.706
View File
(iv). copy of Survey of India Toposheet indicating boundary of protected area:
Annexure Survey of India Toposheet
(v). scanned copy of the Geo-referenced map of the protected area prepared by using DGPS or Total Station:
Annexure scanned copy of the Geo-referenced map
D.
Justification for locating the Project in protected area and details of alternates examined :
(i). copy of note containing justification for locating the Project in protected area:
Annexure Justification
E.
Employment likely to be generated
(i). Whether project is likely to generate employment ?:
Yes
(a). Permanent/Regular Employment(Number of persons):
40
(b). Temporary Employment(Number of person-days):
374125
F.
Displacement of People due to the project, if any
(i). Whether project involve displacement?:
No
G.
Status of Environmental clearance
(i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? :
No
H.
Whether proposal is for investigation/survey
(H-1).
Whether proposal is for investigation/survey? : No
(H-2).
Details of the Bio diversity Impact Assessment report in case the proposal involves use of more than 50 ha. NP/WLS.
(a).Copy of the Bio diversity Impact Assessment report:
Annexure Copy of Bio diversity Impact Assessment report
(H-3).
Information on the projects undertaken by the proponent agency in the past in Protected Areas
(a).Upload file:
Annexure Information on the projects undertaken by the proponent agency in the past in Protected Areas
(H-4).
Details regarding compliance of the conditions on each proposal
(a).Upload file:
Annexure Details regarding compliance of the conditions on each proposal
(H-5).Whether any matter related to the project is sub judice in any court of law?:
No
I.
Hydel/Irrigation/Multipurpose Project
(i). Installed power generation capacity of the Project:
12
(ii). Total culturable command area of the Project(in ha.):
NIL
(a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan):
Annexure of Approval CAT Plan
(b). Copy of the approved CAT plan:
Annexure of Approved CAT Plan
Additional information Details
Documents
S.No
Uploaded Additional Info. Files
Remarks
1
Additional Info.
Wildlife Mitigation Plan
2
Additional Info.
Muck Management Plan
3
Additional Info.
Joint Inspection Report
4
Additional Info.
Project Allotment Letter
5
Additional Info.
Project layout showing boundary of eco-sensitive zone
6
Additional Info.
Aerial Distance Certificate
7
Additional Info.
Duly Filled forms from Part-1 to Part - V for seeking clearance from NBWL
Communication of Sought coming to User Agency
Close(X)
Close(X)