Wild Life Report
Form for seeking recommendation of Standing Committee of NBWL/SBWL.
PART - I & II
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Forest Clearance Required?: No   (ii). Proposal No. : FP/UK/HYD/6201/2022   (iii). Name of Project: JIMBAGAD SMALL HYDRO PROJECT (3X4 MW)   (iv). Short narrative of the Project : IT IS A RUN OFF RIVER SCHEME. ANUUAL ENERGY GENERATION FROM THE PROJECT IS 62.32 M.U. PROJECT IS LOCATED ON JIMBA STREAM A TRIBUTARY OF RIVER GORIGANGA.   (v). State : Uttarakhand   (vi). Category of the Project : Hydel   (vii). Shape of project land : Non Linear   (viii). Distance of the project from the boundary of the Protected Area (in km.): 4.6   (ix). Estimated cost of the Project(Rupees in lacs) : 2152.97   (x). Total period for which clearance is required (in year): 35   (xi). Total Project Area(in ha.): 8.5   (xii). Project Area under Protected Area (in ha.): 3.706   (xiii). Project Area under Non-Protected Area (in ha.): 4.794   (xviii). Project Area inside Wildlife Sanctuaries(in ha.): 0   (xiv). Project Area outside Wildlife Sanctuaries(in ha.): 0   (xv). Project Area inside Conservation Reserve(in ha.): 0   (xvi). Project Area outside Conservation Reserve(in ha.): 0   (xvii). Project Area inside National Park(in ha.): 0   (xviii). Project Area outside National Park(in ha.): 0   (xix). Project Area inside Ecologically Sensitive Zone(in ha.): 3.706   (xx). Project Area outside Ecologically Sensitive Zone(in ha.): 4.794
A-2. Details of User Agency
  (i). Name : UJVN LTD   (ii). Address1 : OFFICE OF EXECUTIVE ENGINEER (CIVIL), UJVN LTD.,TAMADHAR, NANASEM, MUNSYARI.   (iii). Address2 : NIL   (iv). State : Uttarakhand   (v). District : Pithoragarh   (vi). Pin : 262501   (vii). Landmark : NIL   (viii). Email address : suringad2@gmail.com   (ix). Landline Telephone No. : 222073   (x). Fax No. : 222073   (xi). Mobile No. : 9456590210   (xii). Website (if any) : NIL   (xiii). Legal status of User Agency : State PSU
A-3. Details of Person Making Application
  (i). First Name: RISHI   (ii). Middle Name: NIL   (iii). Last Name: SINGH   (iv). Gender: Male   (v). Designation: EXECUTIVE ENGINEER (CIVIL)   (vi). Address 1: TAMADHAR, NANASEM, MUNSYARI.   (vii). Address 2: NIL   (viii). State: Uttarakhand   (ix). District: Pithoragarh   (x). Pin: 262501   (xi). Landmark: NIL   (xii). Email Address: get2rishi@gmail.com   (xiii). Landline Telephone No.: 222073   (xiv). Fax No.: 05961222073   (xv). Mobile No.: 9456590210   (xvi). Upload a copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure copy of documents in support of the competence
B. Details of Land required for the Project
B-1. Details of Protected Area
B-1.1 No. of Divisions involved in Protected Area
Division wise details of land
S.no Division Name Protected Area Name Project Area under Protected Area
1.PithoragarhECO-SENSITIVE ZONE AROUND ASKOT WILDLIFE SANCTUARY3.706
B-1.2 Details of Districts involved
District wise breakup
S.no District Name Project Area under Protected Area(ha.) Project Area under Non-Protected Area(ha.)
1.Pithoragarh3.7064.794
B-1.3 Component wise breakup
Component wise breakup
S.no Component Project Area under Protected Area(ha.) Project Area under Non-Protected Area(ha.)
1Head works, Intake and protection works0.0370.765
2Intake Channel00.051
3Desilting Tank0.0490.171
4Tunnel and Adits10.3
5Surge Shaft00.04
6Penstock and associated structures00.394
7Power House, Switchyard and TRC00.61
8Muck Dumping Sites1.020.563
9Approach Roads1.61.4
10Project Camp and Buildings00.5
C. Maps of protected area
Division 1. : Pithoragarh
  (i). Project Area under Protected Area (in ha.) : 3.706   (ii). Nature of the Project : Non Linear   (a). No. of patches : One
Patch wise details
Patch No. Area of Patch(in ha.) Kml File of Patches
1.3.706    View File
  (iv). copy of Survey of India Toposheet indicating boundary of protected area: Annexure Survey of India Toposheet   (v). scanned copy of the Geo-referenced map of the protected area prepared by using DGPS or Total Station: Annexure scanned copy of the Geo-referenced map
D. Justification for locating the Project in protected area and details of alternates examined :
  (i). copy of note containing justification for locating the Project in protected area: Annexure Justification
E. Employment likely to be generated
  (i). Whether project is likely to generate employment ?: Yes   (a). Permanent/Regular Employment(Number of persons): 40   (b). Temporary Employment(Number of person-days): 374125
F. Displacement of People due to the project, if any
  (i). Whether project involve displacement?: No
G. Status of Environmental clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : No
H. Whether proposal is for investigation/survey
(H-1). Whether proposal is for investigation/survey? : No
(H-2). Details of the Bio diversity Impact Assessment report in case the proposal involves use of more than 50 ha. NP/WLS.
  (a).Copy of the Bio diversity Impact Assessment report: Annexure Copy of Bio diversity Impact Assessment report
(H-3). Information on the projects undertaken by the proponent agency in the past in Protected Areas
  (a).Upload file: Annexure Information on the projects undertaken by the proponent agency in the past in Protected Areas
(H-4). Details regarding compliance of the conditions on each proposal
  (a).Upload file: Annexure Details regarding compliance of the conditions on each proposal   (H-5).Whether any matter related to the project is sub judice in any court of law?: No
I. Hydel/Irrigation/Multipurpose Project
  (i). Installed power generation capacity of the Project: 12   (ii). Total culturable command area of the Project(in ha.): NIL   (a). Copy of the approval of competent authority to the Catchment Area Treatment Plan (CAT Plan): Annexure of Approval CAT Plan   (b). Copy of the approved CAT plan: Annexure of Approved CAT Plan
Additional information Details
Documents
S.No Uploaded Additional Info. Files
Remarks
1Additional Info.Wildlife Mitigation Plan
2Additional Info.Muck Management Plan
3Additional Info.Joint Inspection Report
4Additional Info.Project Allotment Letter
5Additional Info.Project layout showing boundary of eco-sensitive zone
6Additional Info.Aerial Distance Certificate
7Additional Info.Duly Filled forms from Part-1 to Part - V for seeking clearance from NBWL