Wild Life Report
Form for seeking recommendation of Standing Committee of NBWL/SBWL.
PART - I & II
(To be filled up by User Agency)
A. General Details
A-1. Project Details
  (i). Forest Clearance Required?: Yes   (a).Forests Clearance Type : Fresh   (ii). Proposal No. : FP/TR/IND/15234/2015   (iii). Name of Project: Gojalia-GCS to OTPC-Palatana Pipeline   (iv). Short narrative of the Project : The project envisages to create facilities for collection of gas at Gojalia GCS and laying pipeline to transport gas from GCS Gojalia to OTPC Palatana. OTPC Palatana is designed to generate 726.6 MW of Power.   (v). State : Tripura   (vi). Category of the Project : Industry   (vii). Shape of project land : Linear   (viii). Distance of the project from the boundary of the Protected Area (in km.): 0   (ix). Estimated cost of the Project(Rupees in lacs) : 2990.67   (x). Total period for which clearance is required (in year): 20   (xi). Total Project Area(in ha.): 116   (xii). Area of Forest Land required for this Project(in ha.): 11.693913   (xiii). Non-Forest Land required for this Project (in ha.): 104.306087   (xiv). Forest Land within Protected Area(in ha.): 0.646371   (xv). Non-forest Land within Protected Area (in ha.): 0   (xvi). Project Area under Protected Area(in ha.): 0.646371   (xvii). Project Area under Non-Protected Area (in ha.): 115.353629   (xviii). Project Area inside Wildlife Sanctuaries(in ha.): 0.646371   (xiv). Project Area outside Wildlife Sanctuaries(in ha.): 115.353629   (xv). Project Area inside Conservation Reserve(in ha.): 0   (xvi). Project Area outside Conservation Reserve(in ha.): 116   (xvii). Project Area inside National Park(in ha.): 0   (xviii). Project Area outside National Park(in ha.): 116   (xix). Project Area inside Ecologically Sensitive Zone(in ha.): 56.218087   (xx). Project Area outside Ecologically Sensitive Zone(in ha.): 59.781913
A-2. Details of User Agency
  (i). Name : ONGC   (ii). Address1 : ONGC Tripura Asset Badharghat, Agartala Tripura   (iii). Address2 : ONGC Tripura Asset Badharghat, Agartala Tripura   (iv). State : Tripura   (v). District : District West   (vi). Pin : 799014   (vii). Landmark : Badharghat Area   (viii). Email address : 78672@ongc.co.in   (ix). Landline Telephone No. : 2378884   (x). Fax No. : 2374288   (xi). Mobile No. : 9485190578   (xii). Website (if any) : www.ongc.co.in   (xiii). Legal status of User Agency : Central PSU
A-3. Details of Person Making Application
  (i). First Name: PANKOJ   (ii). Middle Name: ROY   (iii). Last Name: MONDAL   (iv). Gender: Male   (v). Designation: CGM-LOGISTIC   (vi). Address 1: ONGC Tripura Asset Badharghat, Agartala Tripura   (vii). Address 2: ONGC Tripura Asset Badharghat, Agartala Tripura   (viii). State: Tripura   (ix). District: District West   (x). Pin: 799014   (xi). Landmark: OPPOSITE DUKLI R.D. BLOCK OFFICE   (xii). Email Address: am_tripura@ongc.co.in   (xiii). Landline Telephone No.: 2363418   (xiv). Fax No.: 03812374288   (xv). Mobile No.: 9432020456   (xvi). Upload a copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: Annexure copy of documents in support of the competence
B. Details of Land required for the Project
B-1. Details of Protected Area
B-1.1 No. of Divisions involved in Protected Area
Division wise details of land
S.no Division Name Protected Area Name Project Area under Protected Area
1.Trishna Wildlife Sanctuarytrishna wls0.646371
B-1.2 Details of Districts involved
District wise breakup
S.no District Name Project Area under Protected Area(ha.) Project Area under Non-Protected Area(ha.)
1.Gomati0.09416531.924298
1.South Tripura0.55220683.429331
B-1.3 Component wise breakup
Component wise breakup
S.no Component Project Area under Protected Area(ha.) Project Area under Non-Protected Area(ha.)
1Pipeline0.646371115.353629
C. Maps of protected area
Division 1. : Trishna Wildlife Sanctuary
  (i). Project Area under Protected Area (in ha.) : 0.646371   (ii). Nature of the Project : Linear   (iii). No. of Segments : One
Patch/Segment wise details
Segments Protected Area of segment(in ha.) KML file of protected area of segment
1.0.646371    View File
  (iv). copy of Survey of India Toposheet indicating boundary of protected area: Annexure Survey of India Toposheet   (v). scanned copy of the Geo-referenced map of the protected area prepared by using DGPS or Total Station: Annexure scanned copy of the Geo-referenced map
D. Justification for locating the Project in protected area and details of alternates examined :
  (i). copy of note containing justification for locating the Project in protected area: Annexure Justification   (ii). Whether a copy of map indicating location of alternative examined is required to be provided: Yes   (a). copy of map indicating location of alternative examined: Annexure alternative examined
E. Employment likely to be generated
  (i). Whether project is likely to generate employment ?: Yes   (a). Permanent/Regular Employment(Number of persons): NIL   (b). Temporary Employment(Number of person-days): 1300
F. Displacement of People due to the project, if any
  (i). Whether project involve displacement?: No
G. Status of Environmental clearance
  (i). Whether the Project requires Clearance under the Environment (Protection) Act 1986 ? : Yes   (a). Status of the Environmental Clearance to the Project : EC under process   (ii).Environmental Clearance File No.: J-11011/234/2012- IA II (I)
H. Whether proposal is for investigation/survey
  (H-1).Whether proposal is for investigation/survey? : Yes
Division wise details of land
S.no Time Required (in Days) physical disturbance needed within the PA like(tree cutting,earth work etc.)
1.120A few trees are likely to be removed along the edges of RoU. Earthwork will be involved
2.120A few trees are likely to be removed along the edges of RoU. Earthwork will be involved
(H-2). Details of the Bio diversity Impact Assessment report in case the proposal involves use of more than 50 ha. NP/WLS.
  (a).Copy of the Bio diversity Impact Assessment report: Annexure Copy of Bio diversity Impact Assessment report
(H-3). Information on the projects undertaken by the proponent agency in the past in Protected Areas
  (a).Upload file: Annexure Information on the projects undertaken by the proponent agency in the past in Protected Areas
(H-4). Details regarding compliance of the conditions on each proposal
  (a).Upload file: Annexure Details regarding compliance of the conditions on each proposal   (H-5).Whether any matter related to the project is sub judice in any court of law?: No
Documents
S.No Uploaded Additional Info. Files
Remarks
1Additional Info.TOR
2Additional Info.Cadastral map
3Additional Info.Toposheet ESZ
Communication of Sought coming to User Agency
Close(X)
Close(X)