PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : WB-04/2015
1. Location of the project/Scheme : West Bengal
 (i) State / Union Territory : West Bengal  (ii) District : Darjeeling  (iii) Forest Division : Darjeeling  (iv) Area of forest land proposed for diversion (in ha.) : 0.883  (v)

Category of the Proposal: Others
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Darjeeling0.883Reserved Forest
Total 0.883
Division 1. : Darjeeling
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Darjeeling0.883
Total0.883
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
10.88310Eco 1
Total. 0.883


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Alnus NepalensisUttis0081300
2Castanopsis TribuloidesKatus0200000
Total 0 208 130 0
Sub Total (No of Trees.) 41


5. Working plan prescription for the forest land proposed for diversion : Coniferous & Miscellaneous species development Working Circle.
6. Brief note on vulnerability of the forest area to erosion : Does not form a part of serious erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : .01
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No such endangeed unique speciesreported in the area.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): Yes
  Details of Protected Area and comments on the impact of Project on the ESZ : Senchal Wildlife Sanctuary under Darjeeling Wildlife Division within 10kms distance. No adverse impact by the project.
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 329500
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
NO Data
(ii). Copy of CA scheme details: NA (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.: (V). Copy of NOC from Competent Authority:
Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Darjeeling314900103677183.92117369.360703/02/2015302.428700
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
DarjeelingHill CircleDFOYesOne24/06/2015
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
DarjeelingHill CircleDFO RecommendedThere is no alternative route for the construction of Passenger Ropeway. There is no rare/ endangered species flora and fauna reported. the area proposed is barest minimum.
Hill CircleCF RecommendedThere is no alternative route for the construction of Passenger Ropeway. There is no rare/ endangered species flora and fauna reported. the area proposed is barest minimum. The proposed diversion will be very helpful to the poor villagers , School children and labours for Tea Garden etc residing down below at Kuhil Jhora locality
quetiapin ritalin markenavntablet.site quetiapin wirkstoff
Yes
Nodal Officer RecommendedRecommended