PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
KL-066/2017
1.
Location of the project/Scheme :
Kerala
(i)
State / Union Territory :
Kerala
(ii)
District :
Thrissur
(iii)
Forest Division :
Peechi Wildlife Sanctuary,Thrissur
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.244
 (v)
Category of the Proposal:
Transmission Line
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Peechi Wildlife Sanctuary
0.098
Reserved Forest
2
Thrissur
0.146
Reserved Forest
Total
0.244
Division 1. : Peechi Wildlife Sanctuary
3.
District wise area to be diverted in the division
S. No.
District
Area(in ha.)
NIL
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.098
0.5
Eco 1
Total.
0.098
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Terminalia Paniculata
Maruthu
0
0
0
0
0
0
Total
0
0
0
0
0
0
Sub Total (No of Trees.)
0
5.
Working plan prescription for the forest land proposed for diversion :
NIL
6.
Brief note on vulnerability of the forest area to erosion :
No tree felling required hence susceptibility to soil erosion is nill
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Already Diverted Area for NH 544,No wildlife present
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
Yes
Details and comments on the impact of Project on such areas :
The Proposed Under Ground Power Cable in passing through the land already bee diverted to NH. The proposed cable is laying along side of the existing NH 544. This land id devoid of any vegetation hence no tree felling is required. More over the proposed cable is laying only 2 metre below ground level for a length of 490 metre with a width of 2 metre, covering an area of only 0.098 Ha. hence it is reported that there would not be any impact upon animals to the proposed project. so the impact is nil or barest minimum.
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
Yes
Details of Protected Area and comments on the impact of Project on the ESZ :
Since the power line is passing through already diverted area and is also an under ground cable there is no adverse impact on ESZ
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
0
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
1
1
0.098
Peechi-Vazhani Wildlife Sanctuary
Peechi
Paravattani Mala Under Vellani Section
View file
(ii).
Copy of CA scheme details:
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority :
Additional information Details
S. No.
Documents
Remarks
NIL
Division 2. : Thrissur
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Thrissur
0.146
Total
0.146
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.146
0
Eco 1
Total.
0.146
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
Protection of forest land is only proposed
6.
Brief note on vulnerability of the forest area to erosion :
The proposed area is not/least vulner
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Nil
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
Yes
Details and comments on the impact of Project on such areas :
Least vulnerable
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
NO Data
(ii).
Copy of CA scheme details:
NA
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority:
Additional information Details
S. No.
Documents
Remarks
NIL
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Thrissur
303200
29805.7
549.162
5
698.6
17/08/2017
0698.6
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Peechi Wildlife Sanctuary
Palakkad Field Director Parambikulam Tiger Reseve
DFO
Yes
Two
07/08/2017,12/08/2017
Thrissur
Central circle, Thrissur
DFO
Yes
One
12/08/2017
Palakkad Field Director Parambikulam Tiger Reseve
CF
Yes
One
31/08/2017
Central circle, Thrissur
CF
Yes
One
07/10/2017
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Peechi Wildlife Sanctuary
Palakkad Field Director Parambikulam Tiger Reseve
DFO
Recommended
DFO
Thrissur
Central circle, Thrissur
DFO
Recommended
The forest land as proposed by the User agency is unavoidable and is the barest minimum for the scheme.
Palakkad Field Director Parambikulam Tiger Reseve
CF
Recommended
The requirement of Forest Land as proposed by the user agency is unavoidable and is the barest minimum for the project.
Yes
Central circle, Thrissur
CF
Recommended
Laying of 320 KV HVDC underground cable from Wadakkenchery to Thrissur in the utility corridor of NH 544.
Yes
Nodal Officer
Recommended
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Kerala
State Secretary
Recommended
07/04/2018
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Bangalore
Regional Office
No.4-KLB1153/2018-BAN
09/10/2018
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/KL/TRANS/27023/2017
TRANS270232017887
663348
663348
2019-04-29
SBIN319119540126
Corporation Bank
NEFT/RTGS (Challan)
2019-02-26
2019-04-13
FP/KL/TRANS/27023/2017
TRANS270232017887
663348
40000000
2019-08-22
SBINR52019082200113663
Corporation Bank
NEFT/RTGS (Challan)
NA
NA
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details) :
No
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/KL/TRANS/27023/2017
14 May 2019
No Data
CA land is not required as the extent of forest land needed is less than one ha.
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/KL/TRANS/27023/2017
14 May 2019
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/KL/TRANS/27023/2017
06 Jul 2019
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/KL/TRANS/27023/2017
24 Sep 2019
APPROVED