PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
KL-09/2022
1.
Location of the project/Scheme :
Kerala
(i)
State / Union Territory :
Kerala
(ii)
District :
Kottayam
(iii)
Forest Division :
Kottayam
 (iv)
Area of forest land proposed for diversion (in ha.) :
0.04
 (v)
Category of the Proposal:
Transmission Line
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Kottayam
0.04
Reserved Forest
Total
0.04
Division 1. : Kottayam
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Kottayam
0.04
Total
0.04
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
0.04
0.8
Eco 1
Total.
0.04
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
NIL
5.
Working plan prescription for the forest land proposed for diversion :
The area proposed comes under Protection Working Circle where the normal forest protection activities including fire protection is prescribed.
6.
Brief note on vulnerability of the forest area to erosion :
The project involves laying of underground cable for 11 KV transmission line to a length of 1.7 km at a depth of 1.2 m along the road side. Vulnerability to erosion is minimum.
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
The forest area supports wild animals like elephant, leopard, sambar deer, mouse deer etc.
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
No
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
Yes
Details of Protected Area and comments on the impact of Project on the ESZ :
The Periyar Tiger Reserve is situated at an approximate aerial distance of four km from the proposed site. The present work proposed is laying of UG cable of 11 KV which is a very minor work with little disturbance. No trees are required to be felled in the project site. The ecological impact of the project is nil as far as the protected area is concerned.
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i).
Total Financial Outlay for C.A(lacs):
Patch Wise Details
S.no
Patch No.
Area(ha.)
Name of PF/RF
Range
Compartment No
Uploaded KML file of patch
NO Data
(ii).
Copy of CA scheme details:
NA
(iii).
Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iv).
Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
(V).
Copy of NOC from Competent Authority:
Additional information Details
S. No.
Documents
Remarks
1
Toposheet countersigned showing the route of UG line
2
Georeferenced sketch countersigned
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Kottayam
220800
8141
0.857
1
0
03/03/2022
0
0
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Kottayam
High Range Circle, Kottayam
DFO
Yes
One
17/02/2022
High Range Circle, Kottayam
CF
No
No Data
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Kottayam
High Range Circle, Kottayam
DFO
Recommended
The required area proposed is the bare minimum and would not cause much impact on the Forest eco system. The ecological impact caused due to diversion is negligible as the proposed project is underground linear with a total area requirement of 0.04 ha and no tree felling is involved. The area does not include National Park, Elephant Corridor, Tiger Reserve or Biosphere Reserve area, hence recommended. Under the above circumstances, the proposal for diversion is recommended for acceptance.
High Range Circle, Kottayam
CF
Recommended
The required area is the bare minimum and would not cause much impact on the Forest Eco system. The ecological impact caused due to diversion is negligible as the proposed project is linear along existing road with a total area requirement of 0.04Ha and no tree felling is involved. The project will help tribal and non tribal people living in interior areas to avoid fluctuation in electric supply.
Yes
Nodal Officer
Recommended
The area supports moist deciduous vegetation and the alignment of UG cable laying is such that no trees are to be felled for the project. The required area proposed is the bare minimuma and would not cause much impact on the Forest eco system.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Kerala
State Secretary
Recommended
21/05/2022
in principle approval
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Bangalore
State Government
C3/84/2022-FWLD
19/05/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/KL/TRANS/145004/2021
TRANS1450042021549
63832
63832
2022-07-21
674851
Union Bank Of India
NEFT/RTGS (Challan)
2022-06-21
2022-06-21
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details) :
No
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/KL/TRANS/145004/2021
30 Jul 2022
No Data
The land required by User Agency for diversion is less than 1 hectare, hence CA land is not mandatory.
21.
Compliance Details Submitted by User Agency
Proposal No.
Compliance Details submitted on(Date)
Uploaded Letter
FP/KL/TRANS/145004/2021
16 Aug 2022
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/KL/TRANS/145004/2021
Compliance report verified by DFO and found correct stage II clearance may be issued at the earliest.
19 Sep 2022
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/KL/TRANS/145004/2021
18 Oct 2022
APPROVED