PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : WB-03/2021
1. Location of the project/Scheme : West Bengal
 (i) State / Union Territory : West Bengal  (ii) District : paschim Bardhaman,Barddhaman  (iii) Forest Division : Burdwan  (iv) Area of forest land proposed for diversion (in ha.) : 2.131  (v)

Category of the Proposal: Transmission Line
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Burdwan2.131Protected Forest
Total 2.131
Division 1. : Burdwan
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Barddhaman2.131
Total2.131
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.1310.8Eco 3
Total. 2.131


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Syzigium CuminiJam002000
2OthersKashmula020000
3OthersKayet Bel001000
4Mangifera IndicaAam000100
5Shorea RobustaSal003000
6Butea MonospermaPalash000100
7Azadirachta IndicaNeem010000
8Albizzia lebbeckSirish010000
9Borasis FlebiliferTal000020
Total 0 46 22 0
Sub Total (No of Trees.) 14


5. Working plan prescription for the forest land proposed for diversion : NIL
6. Brief note on vulnerability of the forest area to erosion : Forest floor will be required to minor damage in the process of construction of 220 KV double circuit transmission line in the forest area proposed for diversion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.02
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Wild boar, Monkey, Langur, Civet cat, Fox, Pangolin, Squirrel, Mongoose, Wood packer, Common Kingfisher, Jungle Owl, Dove, Python, Common Rat & Snake, Common Krait, Cobra, Chandrabora are present in the area.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 26.191
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
111.203BarachatraGuskaraBarachatra    View file
223.059RamchandrapurGuskaraRamchandrapur    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Site Inspection Report
2 NPV Calculation
3 Recommendation Report of Divisional Forest Officer, Burdwan Division

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Barddhaman70240025385311.12930.4626/08/201930.46232.74
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
BurdwanSouth- East CircleDFOYesTwo10/06/2021,25/06/2021
 South- East CircleCFYesOne19/08/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
BurdwanSouth- East CircleDFO RecommendedAll alternatives in the field were examined and found that there is hardly any scope for laying transmission lines entirely through private land and accordingly the user agency has no alternative but to apply for diversion of forest land for their project activities.
South- East CircleCF RecommendedIn compliance with the Rule 6 of the Forest Conservation Rule, 2003, the proposal received Proposal No FP/WB/TRANS/51250/2020 for diversion of forest land project in favour of DVC Damodar Valley Corporation . Laying of Transmission line is hereby recommended provided the rules and guidelines/ conditions are followed and fund for protective measures and stipulated items is allotted.Yes
Nodal Officer Recommendedin public interest, minimal forest land used, no tree felling
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
West BengalState SecretaryRecommended13/12/2021RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataRegional OfficeWB/TRANS-86/2021/FC04/02/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/WB/TRANS/51250/2020TRANS5125020205175,237,286.005,237,286.002022-02-22SBIN205268513856Union Bank Of IndiaNEFT/RTGS (Challan)2022-02-182022-02-21
FP/WB/TRANS/51250/2020TRANS5125020207773,749,341.003,749,341.002022-10-29758936Union Bank Of IndiaNEFT/RTGS (Challan)2022-10-122022-10-12
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 4.262   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 2
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)1.203
  Status of CA Land so identified : Forest Area   Site Name : Bara Chatra Mouza   Location Details : Bara Chatra Mouza , Ausgram Beat , Guskara Range   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Ausgram Beat Guskara RangePF
  No. of patches : 2
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
2Block(Polygon)3.059
  Status of CA Land so identified : Forest Area   Site Name : Ramchandrapur Mouza   Location Details : Ramchandrapur Mouza, Ausgram Beat, Guskara Range   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Ausgram Beat Guskara RangePF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/WB/TRANS/51250/202026 Apr 2022No DataCA area verified
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/WB/TRANS/51250/202007 Nov 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/WB/TRANS/51250/2020may kindly be forwarded to IRO Kolkata for final approval02 Feb 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/WB/TRANS/51250/202003 Mar 2023APPROVED