PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : WB-04/2018
1. Location of the project/Scheme : West Bengal
 (i) State / Union Territory : West Bengal  (ii) District : Darjeeling  (iii) Forest Division : Kalimpong  (iv) Area of forest land proposed for diversion (in ha.) : 1.997  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Kalimpong1.997Reserved Forest
Total 1.997
Division 1. : Kalimpong
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Darjeeling1.997
Total1.997
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
11.9970.5Eco 1
Total. 1.997


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tectona GrandisTeak000022
2Shorea Robustasal000005
3Dalburgia SisooSisum000202
4Bombox CeibaSimul000003
5Alstonia ScholarisChatian000001
6OthersLasune000003
7OthersMaling000001
Total 0 00 22 17
Sub Total (No of Trees.) 21


5. Working plan prescription for the forest land proposed for diversion : Ninth Working Plan for Kalimpong Forest Division.Vol-II Page No.71
6. Brief note on vulnerability of the forest area to erosion : The proposed site is a river bed area.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : There is no Wildlife present in and around the forest proposed for diversion.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 6.194
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
112.00RFKalimpong Rangpo-1    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 58 nos. of household are within the proposed alignment of the viaduct.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Darjeeling314900236500428.08815192.55808/06/2018192.558183.49
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
KalimpongGeneral Manager (North)DFOYesThree18/05/2018,19/05/2018,31/05/2018
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
KalimpongGeneral Manager (North)DFO RecommendedThere is no alternative route.The proposed alignment will cause the barest minimum loss of forest area.
General Manager (North)CF RecommendedYes
Nodal Officer RecommendedThe proposal is recommended and being sent to the State Government.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
West BengalState SecretaryRecommended10/07/2018 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataState GovernmentFor/O/L/10T-09/201405/07/2018
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/WB/ROAD/32306/2018ROAD3230620188602,597,400.002,597,400.002018-08-10P18081085371992Corporation BankNEFT/RTGS (Challan)2018-08-012018-08-03
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 2   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)2
  Status of CA Land so identified : Forest Area   Site Name : NIL   Location Details : Compartment: Rangpo-1 Kalimpong Range   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
RF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/WB/ROAD/32306/201809 Dec 2021No Dataverified area
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/WB/ROAD/32306/201809 Dec 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/WB/ROAD/32306/2018may kindly be forwarded to IRO kolkata17 Mar 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/WB/ROAD/32306/201808 Jun 2023APPROVED