PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : WB-010/2021
1. Location of the project/Scheme : West Bengal
 (i) State / Union Territory : West Bengal  (ii) District : Purulia  (iii) Forest Division : Kangsabati (North),Purulia  (iv) Area of forest land proposed for diversion (in ha.) : 5.7333  (v)

Category of the Proposal: Pipeline
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Kangsabati (North)1.3195Protected Forest
2Kangsabati (North)1.1497Unclassed Forests
3Purulia3.2641Protected Forest
Total 5.7333
Division 1. : Kangsabati (North)
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Purulia2.4692
Total2.4692
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
12.46920.1Eco 3
Total. 2.4692


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Albzzia Spp.Siris011000
2Acacia AuricuiformisAkasmoni (Sonajuri)3341100
3Syzigium CuminiJamun330000
4Butea MonospermaPalash801810402
5Borasis FlebiliferTad0012015
6Prosophis SpicigeraKhejur013500
7Anthocephalus CadambaKadam010000
8Mangifera IndicaAam100000
9Ficus Religiosapipal010000
10Azadirachta IndicaNeem130000
11Zizyphus JujubaBer100000
12Jatropa CurcasJatropha(Diesel)100000
Total 120 3216 120 17
Sub Total (No of Trees.) 197


5. Working plan prescription for the forest land proposed for diversion : Most of the areas belong to Development circle. Few areas are under Sal working Circle.
6. Brief note on vulnerability of the forest area to erosion : washing out during rainy season and wind during summer season, gully erosion is prominent.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0.00
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Fox and Jackal, Mongoose, Civet Cat, Snakes. etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 75.50
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1112Pundag PFJOYPURPlot No. 2911    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL
Division 2. : Purulia
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Purulia3.2641
Total3.2641
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
13.26410.3Eco 3
Total. 3.2641


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Butea MonospermaPALASH1484925300
2Azadirachta IndicaNEEM801110
3Pongamia PinnataKARANJ020310
4Albizzia lebbeckSIRIS410000
5Cassia SiameaMINJIRI16121000
6Terminalia ArjunaARJUN801110
7Ficus RacemosaGULAR110100
8Acacia AuricuiformisSONAJURI85151000
9Bambusa BambooBANS2600000
10Syzigium CuminiJAM700110
11Gmelina ArboreaGAMAR001100
12Alstonia ScholarisCHATIM600000
13Holoptelia integrifoliaCHALLA600000
14Borasis FlebiliferTAL000071
Total 315 8030 1111 1
Sub Total (No of Trees.) 448


5. Working plan prescription for the forest land proposed for diversion : Proposed diverted lands fall under Development and Sal Working Circle
6. Brief note on vulnerability of the forest area to erosion : Area vulnerable to Soil erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : Elephants, Barking Deers, Pangolin, Small animals like Fox, Jackal, Porcupine, Rabbits, Snakes etc.
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : Yes
  Details and comments on the impact of Project on such areas : Sometimes Elephants pass through these areas.
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : Yes
  Details and comments on the impact of Project on such areas : Elephants pass through these areas sometimes. No impact as Pipeline would go underground only.
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : Yes
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 75.50
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1112Pundag PFJOYPURPlot No. 2911    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
NIL

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Purulia625900119857.44438.892961.6514/06/202161.65434.975
2Purulia625900119857.44438.892961.6530/07/202161.65434.975
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 South WestCFYesOne09/09/2021
Kangsabati (North)South WestDFOYesOne20/08/2021
PuruliaSouth WestDFOYesOne19/08/2021
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Kangsabati (North)South WestDFO RecommendedThis underground Pipeline Project shall be crucial for development of the area . Moreover It shall not hamper environment. Also, forest land being diverted is bare minimum. Hence, the land diversion proposal may be recommended.
PuruliaSouth WestDFO RecommendedProject shall help in sustainable development of the area. Area being diverted is bare minimum. No. of trees to be felled are also very less. As, its an underground pipeline project, movement of wild animals shall not be hampered as well. Therefore the proposed land diversion may be approved.
South WestCF RecommendedYes fully justifiedYes
Nodal Officer Recommendedthe project is crucial for development of the area
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
West BengalState SecretaryRecommended30/09/2021RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
KolkataRegional OfficeWB/PFO-81/2021/FC25/04/2022
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/WB/Pipeline/141208/2021PIPELINE141208202123613,761,199.0013,761,199.002022-05-27SBIN222147563086Union Bank Of IndiaNEFT/RTGS (Challan)2022-04-302022-05-05
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 12   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)12
  Status of CA Land so identified : Forest Area   Site Name : CGS Jamshedpur Spurline   Location Details : Village: Pundag Thana: Joypur District: Purulia   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Pundag Protected ForestPF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/WB/Pipeline/141208/202106 Dec 2022No DataCA on degraded forest land
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/WB/Pipeline/141208/202108 Dec 2022
FP/WB/Pipeline/141208/202108 Dec 2022
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/WB/Pipeline/141208/2021may kindly be forwarded to IRO Kolkata30 Jan 2023
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/WB/Pipeline/141208/202113 Feb 2023APPROVED