PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-0221/2022
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Lalitpur  (iii) Forest Division : Social Forestry Division Lalitpur  (iv) Area of forest land proposed for diversion (in ha.) : 8.161809  (v)

Category of the Proposal: Drinking Water
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Lalitpur6.13775Reserved Forest
2Social Forestry Division Lalitpur2.024059Protected Forest
Total 8.161809
Division 1. : Social Forestry Division Lalitpur
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Lalitpur8.161809
Total8.161809
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
16.137750.4Eco 3
22.0240590.4Eco 3
Total. 8.161809


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Tectona Grandissagoun953216200
2Diasporus Melanoxylontendu65160000
3Lagerstroemia Parvifloraseja13275000
4Othersdudhi910000
5Cassia Fistulaamaltas310000
6Ziayphus xylopyraghoat210000
7Anona Squamosasitafal600000
8Othersdhoo012300
9Azadirachta Indicaneem011163518
10Acacia Arabicakikad19131000
11Butea Monospermadhak1488920020
12Holoptelia integrifoliachilbil52100420
13Terminalia Arjunaarjun002050
14Madhuca indicamahua001237
15Dalburgia Sisooshisham16115410
16Feronia Elephantumketha000002
17Delonix Regiagulmohour300000
18Butea Monospermachewla013000
19Acacia Catechukheer92616410
20Cassia Fistulakasai000200
21Otherskirbaba200000
22Acacia Niloticababool200000
23Annona Reticulatakardhai001000
24Othersgounj012100
25Aegle Marmelosbel145000
26Ficus Infectoriapakad100000
27Otherskari010000
28Prosophis Juliflorajuli flora100000
29Othersawala001000
Total 447 23681 3849 27
Sub Total (No of Trees.) 878


5. Working plan prescription for the forest land proposed for diversion : The proposed area for diversion comes under the plantation working circle, tendu working circle , sagaun working circle, and bamboo working circle according to the working plan (2017-18 to 2028-2029)
6. Brief note on vulnerability of the forest area to erosion : There is no vulnerability of forest area to erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : NA
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : Yes
  (a)Details of violation(s): NIL
   (b) Period of Work done(year) : 2023
   (c) Area of forest land involved in violation (in ha.) : 0.036
S. No. Name of person responsible for violation Designation & Address of person responsible for violationAction taken against the person responsible for violation
1suneel so sobharan yadav JCB OperatorWork immediate stop and case filed
12. Whether work in violation is still in progres(Yes/No) : No
13. Details of compensatory afforestation scheme
(i). Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no District Name VillageArea(in ha.)khasraKML filePresent Owner file
1LalitpurKari pahadi6.14192/4
(ii). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iv). Copy of CA scheme details: (iv). Copy of CA scheme details: NA
Patch wise details for Degraded Area (To be earmarked by DFO)
Patch Wise Details
S.no Division Name Patch No. Area(in ha.)Name of PF/RFRangeVillage NameSurvey No.Compartment No./any identification No. KML file of patch
1Social Forestry Division Lalitpur14.04pathraiGaunapathrai00
2Social Forestry Division Lalitpur27.30pathraiGaunapathrai0nil
(i). Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (ii). Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A: (iii). Copy of CA scheme details: (iv). Total Financial Outlay for C.A: 177.05300 (v). Whether the land identified by User Agency is suitable for CA and from managementpoint of view?: Yes (vi). Copy of certificate regarding suitability of land identified for CA and from management point of view: (vii). Copy of detailed CA scheme including species to be planted,implementing agency,time schedule,cost structure etc.:
Additional information Details
S. No. DocumentsRemarks
1 Manak Rules
2 PATHRAI 4.04 DFL, pathrai 7.30 ha DFL AND Kari pahadi VAYAY PRAMAD PATRA
3 PATHRAI 4.04 DFL, pathrai 7.30 ha DFL AND Kari pahadi 2.50 ha land suitability
4 PATHRAI 4.04 DFL, pathrai 7.30 ha DFL AND Kari pahadi GEO MAP
5 PATHRAI 4.04 DFL, pathrai 7.30 ha DFL AND Kari pahadi TOPOSHEET
6 FRA
7 Muck Disposal plan
8 LOI
9 CA Afforestation payment
10 NPV RATE
11 Area calculation sheet for non forest land
12 Area calculations sheet
13 justification note
14 site inspection report
15 non start work

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Lalitpur503050.0074304.0431574.4736862120101/02/20232016144
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division LalitpurBundelkhand Circle JhansiDFOYesSeven14/11/2022,15/11/2022,16/11/2022,17/11/2022,18/11/202219/11/2022,21/11/2022
 Bundelkhand Circle JhansiCFNoNo Data
 Nodal OfficerNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division LalitpurBundelkhand Circle JhansiDFO Recommendedproposal number FP/UP/Water/155091/2022 has been received by this office from Mr.Avneesh Singh,Secretary DWSM/ Executive Engineer, Construction Unit, Uttar Pradesh Jal Nigam, Donda Ghat, Lalitpur for diversion under FCA 1980 of 8.161809 Hectares of Forest land for non forestry purpose. The Subject envisages the use of forest land for Laying of Drinking Water Distribution Pipeline total km 96.30 under Jakhlaun Birdha, Dhoora Balabehat, Kadesra Kalan and Mau Group of Village Water Supply Scheme, District Lalitpur U.P. The sites inspection of the land involved in the proposal has been done by me alongwith Mr. Avneesh Singh, Secretary DWSM/ Executive Engineer, Construction Unit, Uttar Pradesh Jal Nigam, Donda Ghat, Lalitpur and persons deputed by him on his behalf, from dated 14 11 2022 to 21.11.2022 On inspection of the sites, it is found that land required by the user agency is approx. 8.161809 hectares Protected Forest 2.024059 hectares and Reserved forest 6.137750 hectares The availability of drinking water is a major issue in Lalitpur district. Thus, the proposal is recommended for aceptance only because it is a laying of drinking water pipeline project which is in larger public interest
Bundelkhand Circle JhansiCF RecommendedRecommendedYes
Nodal Officer RecommendedRecommended for Approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended28/03/2023RecommendedState Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/08/75/2023/FC13/09/2023
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/WATER/155091/2022WATER155091202282829,978,981.0029,978,981.0021/09/2023172548Union Bank Of IndiaNEFT/RTGS (Challan)21/09/202321/09/2023
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 6.14   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)6.14
  Status of CA Land so identified : Non Forest Area   Site Name : kari pahadi   Location Details : kari pahadi   Uploaded GPS File :   Uploaded Scanned copy of Map :   Mutation Status : Mutated
Mutation Status
Circle Name. Name of Division. Name of Range. Mutation Order No. Mutation Date How Much Area of Mutated Land Received Mutation Letter
Bundelkhand Circle JhansiSocial Forestry Division LalitpurTalbehatdm letter no- 645 date-28-12-202228 Dec 20226.14
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/WATER/155091/202224 Feb 2025No DataVerify.
Compliance Details Submitted by User Agency(old)
Proposal No.Compliance Details submitted on(Date)Reject RemarksReject DateUploaded Letter
FP/UP/WATER/155091/202210 Mar 2025EDS: EDS letter Attached.17 Jun 2025
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/WATER/155091/202211 Mar 2025
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/WATER/155091/2022Approved In-PrincipleNo Data