PART-II
Form for seeking prior approval of Central Government under section 2 of the Forest(Conservation) Act,1980 for Diversion of fresh forest area
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal :
UP-0156/2021
1.
Location of the project/Scheme :
Uttar Pradesh
(i)
State / Union Territory :
Uttar Pradesh
(ii)
District :
Sonbhadra
(iii)
Forest Division :
Kaimur Wild Life Division Mirzapur
 (iv)
Area of forest land proposed for diversion (in ha.) :
6.4325
 (v)
Category of the Proposal:
Drinking Water
2.
Legal status of forest land proposed for diversion
S. No.
Division
Forest Land(ha.)
Legal Status
1
Kaimur Wild Life Division Mirzapur
6.4325
Reserved Forest
Total
6.4325
Division 1. : Kaimur Wild Life Division Mirzapur
3.
District wise area to be diverted in the division
S. No.
District
Area(ha.)
1
Sonbhadra
6.4325
Total
6.4325
4.
Details of Vegetation available in the forest land proposed for diversion
(i)
Density of vegetation
S. No.
Area(in ha.)
Density
Eco-Class
1
6.4325
0.1
Eco 3
Total.
6.4325
(ii)
Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No.
Scientific Name
Local Name
(0-30)cm.
(31-60)cm.
(61-90)cm.
(91-120)cm.
(121-150)cm.
(>150)cm.
1
Others
Jigna
0
0
4
26
4
2
2
Madhuka Indica
Mahua
0
0
0
0
0
1
3
Others
Bharuhi
0
0
0
2
2
0
4
Others
Khair
1
0
0
4
0
0
5
Misc. Species
Salai
0
0
0
3
0
0
6
Others
dhavra
0
0
0
1
1
0
7
Misc. Species
kulhi
0
0
0
1
0
0
8
Others
Kahua
0
0
0
0
0
1
9
Misc. Species
Papad
0
0
0
1
0
0
10
Others
Bel
1
0
0
0
0
0
Total
2
0
4
38
7
4
Sub Total (No of Trees.)
55
5.
Working plan prescription for the forest land proposed for diversion :
The area is covered in Wildlife Management plan of Kaimur Wildlife Sanctuary
6.
Brief note on vulnerability of the forest area to erosion :
Proposed area in non Vulnerable to Soil erosion
7.
Approximate distance of the proposed site for diversion from boundary of forest(in km.) :
0
8.
Significance of the forest land proposed for diversion from wildlife point of view
(i).
Details of wildlife present in and around the forest land proposed for diversion :
Sambhar Deer, Jungle cat, Monkey, Indian Hare, Palm Squirrel, Black Rat, Jackel, Snake
(ii).
Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. :
Yes
Details and comments on the impact of Project on such areas :
The proposed area is located within Kaimur Wildlife Sanctuary. The project will have effect of Wildlife present in the area.
(iii).
Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ):
No
(iv).
Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion :
No
(v).
Whether any rare/endangered/unique species of flora and fauna found in the area :
No
9.
Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
(i).
Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area :
No
10.
Comment as to the reasonability of the extent of the forest land proposed for diversion
(i).
Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project :
Yes
11.
Details of violation(s), if any ,committed
(i).
Whether any work in violation of the Act or guidelines issued under the Act has been carried out :
No
12.
Whether work in violation is still in progres(Yes/No) :
NIL
13.
Details of compensatory afforestation scheme
(i).
Patch wise details of non-forest or Revenue forest land to be provided by User Agency for CA
Patch Wise Details
S.no
District Name
Village
Area(in ha.)
khasra
KML file
Present Owner file
1
Mirzapur
Sagara
6.4325
28/1mi
(ii).
Upload a scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station:
(iii).
Upload a copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A:
(iv).
Copy of CA scheme details:
(iv).
Copy of CA scheme details:
NA
Additional information Details
S. No.
Documents
Remarks
1
NPV
2
Site picture
3
Joint Site inspection
4
Van Swarup
5
Protected area
6
Tree Enumeration
14.
District Profile
S.no
District Name
Geographical area of the district (in ha.)
Forest area of the district (in ha.)
Total forest area diverted since 1980 (in ha.)
No. of Approved Cases
Forest Land including penal C.A. (in ha.)
Progress of compensatory afforestation as on(date)
A) Forest land (in ha.)
B) Non-forest land (in ha.)
1
Sonbhadra
678800
378286
212.69
9
774.80
31/07/2021
774.80
377.3026
15.
Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division Name
Circle
Site inspected By
Whether site inspected
No. of times site visited
Site inspection report
Date of visit
Kaimur Wild Life Division Mirzapur
Wild life Circle Western Region Kanpur
DFO
Yes
One
21/07/2021
Nodal Officer
No
No Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16.
Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
Division
Circle
Recommendation By
Recommendation
Reason
Letter
Whether CF agreed
Kaimur Wild Life Division Mirzapur
Wild life Circle Western Region Kanpur
DFO
Recommended
Recommended
Wild life Circle Western Region Kanpur
CF
Recommended
proposol has been recomended
Yes
Nodal Officer
Recommended
Recommended for Approval.
Specific recommendation of the State Government(Part V)
17.
Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
State
Recommendation By
Recommendation
Recommendation Date
Remarks
Signing Authority
Notification
Recommendation Letter
Uttar Pradesh
State Secretary
Recommended
03/12/2021
Recommended for Approval.
State Govt. Officer
No Data
17.
Stage-I Clearance Report
Regional Office
Recommendation By
MoEF File No.
Date of Stage-I Clearance
Clearance Letter
Lucknow
Regional Office
8B/UP/08/263/2021/FC
07/07/2022
18.
Payment made by User Agency
Proposal No.
Application No.
Total Amount (Rs.)
Recieved Amount (Rs.)
Transaction Date
Transaction ID
Bank Name
Mode of Payment
Demmand Generated By User Agency
Demmand Verified By Nodal Officer
Uploaded Demand Letter
FP/UP/WATER/119894/2021
WATER1198942021099
35,297,599.00
35,297,599.00
2022-07-25
678618
Union Bank Of India
NEFT/RTGS (Challan)
2022-07-19
2022-07-19
19.
Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
(i). Whether CA Land is mandatorily required in this Proposal :
Yes
(ii). Total Land identified for raising CA:
6.4325
(iii). No. of Maintenance years:
10
(iv). Total No. of Patches/Parcel:
1
No. of patches :
1
Patch wise details
Patch No.
Shape of land identified for CA
Area of Patch/Parcel(in ha.)
1
Block(Polygon)
6.4325
Status of CA Land so identified :
Non Forest Area
Site Name :
28/1 Mi
Location Details :
Village Sagra Parghana Kantit Tehsil Lalganj District Mirzapur
Uploaded GPS File :
Uploaded Scanned copy of Map :
Mutation Status :
Mutated
Mutation Status
Circle Name.
Name of Division.
Name of Range.
Mutation Order No.
Mutation Date
How Much Area of Mutated Land Received
Mutation Letter
Wild life Circle Western Region Kanpur
Kaimur Wild Life Division Mirzapur
Halia
21208920220719
18 Jul 2022
6.4325
20.
Mutation Details Verified By Nodal Officer
Proposal No.
Verified Date
Mutation Letter
Remarks
FP/UP/WATER/119894/2021
05 Aug 2022
No Data
Approved.
Compliance Details Submitted by User Agency(old)
Proposal No.
Compliance Details submitted on(Date)
Reject Remarks
Reject Date
Uploaded Letter
FP/UP/WATER/119894/2021
27 Aug 2022
EDS: EDS letter Attached.
12 Sep 2022
FP/UP/WATER/119894/2021
05 Feb 2023
EDS: EDS letter Attached.
28 Feb 2023
22.
Compliance Details Verified by Nodal Officer
Proposal No.
Remarks
Verified Date
Uploaded Letter
FP/UP/WATER/119894/2021
29 Aug 2022
23.
Stage-II Clearance Details
Proposal No.
Date of Stage-II Clearance
Proposal Status
Clearance Letter
FP/UP/WATER/119894/2021
Approved In-Principle
No Data
Print
Checklist for State Nodal Officer
×