PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-040/2019
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Shamli  (iii) Forest Division : Social Forestry Division Shamli  (iv) Area of forest land proposed for diversion (in ha.) : 19.80775  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Shamli19.80775Protected Forest
Total 19.80775
Division 1. : Social Forestry Division Shamli
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Shamli19.80775
Total19.80775
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
119.807750.2Eco 3
Total. 19.80775


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Mangifera IndicaAam044329
2Alstonia ScholarisAlastonia103520832
3Psidium GuajavaAmrood030000
4Saraca AsocaAshok221100
5BabulBabool022132
6Melia AzadirachtaBakain061100
7Ficus BengalensisBargad000200
8Aegle MarmelosBel021000
9EucalyptusEucalyptus02467134174209
10Delonix RegiaGolmohar001000
11Syzigium CuminiJamun15112029626
12Prosophis JulifloraJuliflora0511346
13Azadirachta IndicaNeem32519665
14Ficus RacemosaPeepal021013
15Populus sppPoplar31811311
16Dalburgia SisooShisham1110289411461
17Moringa oleiferaShahjan000200
18Albezzia LabbeckSirus5811400
19OthersBer063343
20OthersBilkhar001100
21OthersBilpat022400
22OthersChakrenda063000
23OthersKaner041000
24OthersKanji640482383
25OthersLisodha020001
26OthersPilkhan000102
27OthersSafeda030000
28Othersshehtoot11011410
29OthersTun215221
Total 44 363423 286229 334
Sub Total (No of Trees.) 1679


5. Working plan prescription for the forest land proposed for diversion : As per Plantation working circle of working plan
6. Brief note on vulnerability of the forest area to erosion : No Vulnerability for erosion
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 4
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No wildlife present in and around Forest Land proposed for Diversion
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 127.28033
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
1140Bheda Forest BlockMarkundiNA    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1 Shud NPV duly signed by DFO
2 Trees list with Summary
3 Van Swaroop
4 FRA
5 Task Force
6 Wildlife Certificate by DFO
7 TCS duly signed by DFO
8 Linear Plan of Forest Land duly signed by DFO
9 Environment Clearance
10 Recommendation
11 Site Inspection Report
12 Muck Disposal Plan
13 Trees Joint Inspection Report
14 Forest Area Sheet duly signed by DFO
15 NPV Calculation
16 Beneficiary village
17 Site Inspection Pic
18 Land Suitability

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Shamli399323677.4675.3431322531/07/20192250
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
Social Forestry Division ShamliSaharanpur Circle SaharanpurDFOYesOne31/07/2019
 Saharanpur Circle SaharanpurCFNoNo Data
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division ShamliSaharanpur Circle SaharanpurDFO Recommendedthe requirement forest land as proposed by the user agency is an unavoidable and bear minimum for the forest land 19.80775 ha.
Saharanpur Circle SaharanpurCF RecommendedyesYes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended26/09/2019 State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/78/2019/FC30/01/2020
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/ROAD/37343/2018ROAD37343201814025,127,685.0025,127,685.0013/02/2020SYNBR52020021351601036Corporation BankNEFT/RTGS (Challan)10/02/202012/02/2020
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 40   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)40
  Status of CA Land so identified : Forest Area   Site Name : Bheda Forest Block   Location Details : Bheda Forest Block in Markhundi Range Chitrakot Division   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Bheda Forest BlockRF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/ROAD/37343/201816 Mar 2020No DataApproved.
21. Compliance Details Submitted by User Agency
Proposal No.Compliance Details submitted on(Date)Uploaded Letter
FP/UP/ROAD/37343/201822 Jan 2021
22. Compliance Details Verified by Nodal Officer
Proposal No.RemarksVerified DateUploaded Letter
FP/UP/ROAD/37343/201827 Jan 2021
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/ROAD/37343/201818 Feb 2021APPROVED