PART-II
(To be filled by the concerned Deputy Conservator of Forest)
State Serial No. of proposal : UP-060/2017
1. Location of the project/Scheme : Uttar Pradesh
 (i) State / Union Territory : Uttar Pradesh  (ii) District : Barabanki  (iii) Forest Division : Social Forestry Division Barabanki  (iv) Area of forest land proposed for diversion (in ha.) : 4.645  (v)

Category of the Proposal: Road
2. Legal status of forest land proposed for diversion
S. No. DivisionForest Land(ha.)Legal Status
1Social Forestry Division Barabanki4.645Protected Forest
Total 4.645
Division 1. : Social Forestry Division Barabanki
3. District wise area to be diverted in the division
S. No. DistrictArea(ha.)
1Barabanki4.645
Total4.645
4. Details of Vegetation available in the forest land proposed for diversion
 (i) Density of vegetation
S. No. Area(in ha.)Density Eco-Class
14.6450.2Eco 3
Total. 4.645


(ii) Species-wise local/scientific names and girth-wise enumeration of trees at FRL
S. No. Scientific Name Local Name (0-30)cm. (31-60)cm. (61-90)cm. (91-120)cm. (121-150)cm. (>150)cm.
1Dalburgia Sisooshisham004447
2Pongamia PinnataKanji001447
3Syzigium CuminiJamun024118
4Terminalia ArjunaArjun0111262647
5Azadirachta IndicaNeem004102
6Mangifera IndicaAam001001
7Tamarindus IndicaImali000001
8Albizia ProceraSiras016020
9Alstonia ScholarisChhitwan020300
10Prosophis JulifloraProsophis0051252
11Acacia NiloticaBabool010111
12Lagerstroemia ParvifloraSobabool000100
13Pyrularia EdulisJangal Jalebi021103
14Morus LaevigataShahtoot001100
15Holoptelia integrifoliachiwill001110
16Ficus ReligiosaPipal000001
17Anthocephalus CadambaKadamb042110
18Ficus InfectoriaGoolar014100
19Delonix RegiaGold Mohar003000
20Cassia SiameaKasia samia001100
21Syzigium CuminiAkasia000100
22Ficus LacorPakar011000
23Melia AzadirachtaBakain030000
24Pongamia PinnataFicus Benjamia010100
25Bombox CeibaSemal000010
26Couroupita GuianensisLasohra010000
Total 0 2050 6146 80
Sub Total (No of Trees.) 257


5. Working plan prescription for the forest land proposed for diversion : The area is covered under plantation working circle of the working plan.
6. Brief note on vulnerability of the forest area to erosion : the area is not vulnerable to soil erosion.
7. Approximate distance of the proposed site for diversion from boundary of forest(in km.) : 0
8. Significance of the forest land proposed for diversion from wildlife point of view
 (i). Details of wildlife present in and around the forest land proposed for diversion : No
 (ii). Whether forms part of national park, wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, wildlife migration corridor etc. : No
 (iii). Whether the forest land proposed for diversion is located within eco-sensitive zone(ESZ) of the Protected Area notified under Wildlife(Protection) Act,1972 (Note: In case, ESZ of a Protected Area is not notified,then,10kms distance from boundary of the Protected Area should be treated as ESZ): No
 (iv). Whether any national park, wildlife sanctuary, biosphere reserve, tiger reserve, elephant corridor, wildlife migration corridor etc., is located within 1 Km. from boundary of the forest land proposed for diversion : No
 (v). Whether any rare/endangered/unique species of flora and fauna found in the area : No
9. Details of any protected archaeological/heritage site/defence establishment or any other important monument located in the area, if any
 (i). Whether any protected archaeological/heritage site/defence establishment or any other important monument is located in the area : No
10. Comment as to the reasonability of the extent of the forest land proposed for diversion
 (i). Whether the requirement of forest land as proposed by the user agency is unavoidable and bare minimum for the project : Yes
11. Details of violation(s), if any ,committed
 (i). Whether any work in violation of the Act or guidelines issued under the Act has been carried out : No
12. Whether work in violation is still in progres(Yes/No) : NIL
13. Details of compensatory afforestation scheme
Patch wise details for Degraded Area (To be earmarked by DFO)
(i). Total Financial Outlay for C.A(lacs): 26.44616
Patch Wise Details
S.no Patch No.Area(ha.)Name of PF/RFRangeCompartment NoUploaded KML file of patch
119.29RFKakardari10    View file
(ii). Copy of CA scheme details: (iii). Scanned copy of the Geo-referenced map of the forest land proposed for C.A. prepared by using DGPS or Total Station: (iv). Copy of Survey of India Toposheet indicating boundary of forest land proposed for C.A.:
 (V). Copy of NOC from Competent Authority :

Additional information Details
S. No. DocumentsRemarks
1
2
3 Forest Gazette notification.
4 NPV calculation sheet.
5 Joint Inspection report.
6 Land Schedule.
7 Land suitability certificate.

14. District Profile
S.no District NameGeographical area of the district (in ha.)Forest area of the district (in ha.)Total forest area diverted since 1980 (in ha.)No. of Approved CasesForest Land including penal C.A. (in ha.)Progress of compensatory afforestation as on(date)A) Forest land (in ha.)B) Non-forest land (in ha.)
1Barabanki4402008475199.858786442392.170572808/03/2017321.4637340.00
15. Site inspection report of the DFO/CCF/Nodal Officer highlighting important facts pertaining to the forest land
Division NameCircleSite inspected ByWhether site inspectedNo. of times site visited Site inspection reportDate of visit
 Saryu Circle FaizabadCFNoNo Data
 Nodal OfficerNoNo Data
Social Forestry Division BarabankiSaryu Circle FaizabadDFOYesOne07/03/2017
(Specific recommendation of the DFO/CCF/Nodal Officer with(Part II,III & Part IV))
16. Specific recommendation of the DFO/CCF/Nodal Officer for acceptance or otherwise of the proposal with reason
DivisionCircleRecommendation ByRecommendationReasonLetter Whether CF agreed
Social Forestry Division BarabankiSaryu Circle FaizabadDFO RecommendedRECOMMENDED
Saryu Circle FaizabadCF RecommendedRecommended for approval.Yes
Nodal Officer RecommendedRecommended for approval.
Specific recommendation of the State Government(Part V)
17. Specific recommendation of the State Government for acceptance or otherwise of the proposal with reason ( Part V)
StateRecommendation ByRecommendationRecommendation DateRemarksSigning AuthorityNotificationRecommendation Letter
Uttar PradeshState SecretaryRecommended17/03/2017Recommended for approval.State Govt. OfficerNo Data
17. Stage-I Clearance Report
Regional OfficeRecommendation ByMoEF File No.Date of Stage-I ClearanceClearance Letter
LucknowRegional Office8B/UP/06/21/2017/FC14/06/2017
18. Payment made by User Agency
Proposal No.Application No.Total Amount (Rs.)Recieved Amount (Rs.)Transaction DateTransaction IDBank NameMode of PaymentDemmand Generated By User AgencyDemmand Verified By Nodal OfficerUploaded Demand Letter
FP/UP/ROAD/23394/2016ROAD2339420160645,552,386.005,552,386.0004/08/2017BARBR52017080400809420Corporation BankNEFT/RTGS (Challan)04/07/201705/07/2017
19. Uploaded Status of Land to be transferred to Forest Department under FCA (Mutation Details).
  (i). Whether CA Land is mandatorily required in this Proposal : Yes   (ii). Total Land identified for raising CA: 9.29   (iii). No. of Maintenance years: 10   (iv). Total No. of Patches/Parcel: 1
  No. of patches : 1
Patch wise details
Patch No. Shape of land identified for CA Area of Patch/Parcel(in ha.)
1Block(Polygon)9.29
  Status of CA Land so identified : Forest Area   Site Name : CA For Forest Land Proposed to be diverted for Rehabilition and Upgradation on NH-28C from Km.0.000 to Km.43.000(Barabanki to Jarwal Road Junction Section in Barabanki   Location Details : Bhinga Comp-10 Range:Kakardari   Uploaded GPS File :   Uploaded Scanned copy of Map :
Status of CA Land so identified
Name of Forest. Legal Status of Forest Land
Bhinga Comp-10RF
20. Mutation Details Verified By Nodal Officer
Proposal No.Verified DateMutation LetterRemarks
FP/UP/ROAD/23394/201620 Jul 2020No DataVerified
23. Stage-II Clearance Details
Proposal No.Date of Stage-II ClearanceProposal StatusClearance Letter
FP/UP/ROAD/23394/2016Approved In-PrincipleNo Data